Compare commits

..
Author SHA1 Message Date
jschoubben ba7c9e7f17 Try a small fix's branch before its pull request, since local runs miss the check's toolchain (playbook 08)
mesh/merge-gate out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
mesh/delivery stopped: the pull request closed unmerged
2026-10-15 23:33:20 +02:00
8 changed files with 34 additions and 189 deletions
-4
View File
@@ -364,9 +364,6 @@ planner, the rollout). **Downstream of** Module, Core, Health and repair and Dat
- **delivery group** — two or more deliveries sharing a pull request head branch name across the mesh's
repositories, delivered as one unit in an order declared (`after:`) or inferred by the planner. One
level: a group holds deliveries, never groups. Its state is derived from its members, never set.
- **release branch** — a branch other than `main`, shared by name across repositories, that collects a feature's
merged work and is brought into `main` as one delivery (design 57's `feat/57-config-and-provisioning`). While it
is in flight, a change that touches its files waits for it (playbook 07, *Is the coast clear?*).
- **delivery plan** — what a delivery does to the mesh: its **build plan** (the modules it moves and
their dependents, in tiers), its **deploy plan** (per node, what it receives and what waits for a
person) and its verdict (the composed nodes, the replays). Computed by the controller's planner from a
@@ -685,7 +682,6 @@ renaming one sense, the old sense moves to a *Not:* line and becomes mechanical.
| release | a person letting a held delivery go on | **release** | Change and delivery |
| | taking a consumer off a licence | **unbind** (verb `release`, to rename) | Identity and access |
| | a copy of a work an engine can fetch | **media release** | Media |
| | a branch brought into `main` as one delivery | **release branch** | Change and delivery |
| gate | the judgement on a delivery's first node | **first-node gate** | Change and delivery |
| | the pull request status | **merge gate** | Change and delivery |
| | a failed step stopping its module's later steps (ADR 0136) | *a failed step holds its module* | Placement |
+1 -26
View File
@@ -1,10 +1,9 @@
---
status: canonical
updated: 2026-10-16
updated: 2026-10-11
derives: the constitution page
decisions:
- "ADR 0020"
- "ADR 0391"
---
# How we build
@@ -173,30 +172,6 @@ quietly stop being true, and nobody will learn that from a document.
Not test-driven development as a blanket rule — a test written first against undiscovered
behaviour asserts a guess. The obligation is that every decision has a defender.
### Tests run at the lowest level that proves them, within a time budget
Three levels, by how much real system a test uses (ADR 0391):
| Level | Uses | Budget | Runs |
|---|---|---|---|
| **Unit** | one piece of logic alone: no database, network, bus, running service or other process | well under a second per test | locally, the tests of what changed, while working; and in the forge's checks |
| **Integration** | the real thing beside it: a database, the bus, a catalogue tree | the repository's whole suite in seconds, never over sixty | only in the forge's checks, once per push |
| **End to end** | the whole mesh, or a lab mesh, from the outside | — | only when the operator asks |
- **Test each behaviour at the lowest level that can prove it.** A defect found higher up gets a test at the
lowest level that reproduces it, before its fix.
- **A test that needs longer than a second, or a database, the network or a service, is not a unit test.**
- **A suite over sixty seconds is a defect with its own issue**: it is made faster or split, not accepted.
- **Never run a merge check, a throwaway database or an integration suite locally.** The forge's checks do,
on the builder.
- **A report names its tests and how long they took**, so a test over its budget is seen when it is added.
### Tests within a time budget — how it was earned
On 2026-10-16 a feature's fixing agents ran the catalogue's whole merge check (about ten minutes), a
throwaway database and a locally built gate during local development. Each round cost tens of minutes and
caught neither real failure; the forge's checks found both.
### A report is read from the system, never from what asked for it
The same rule as the two above, pointed at reporting rather than at verification. **Anything
+6 -33
View File
@@ -30,15 +30,6 @@ An idea arrives in one of two forms, and the first step differs:
2. **Ask the operator to set it up.** A few questions, one at a time, each answerable with a choice and
carrying a recommendation: what comes first, what is out of scope, which options must be tried, what
done looks like. Three to five questions is usual; the answers are the effort's first findings.
- **Check every option against the mesh's own rules before offering it.** An option that breaks one
(the core values in [`mission.md`](../mission.md), among them *the mesh owns the truth* and
*sovereignty: external dependencies are deliberate and few*; the rules in
[`how-we-build.md`](../how-we-build.md); and everything between modules over the bus, research 036) is
dropped, or offered only with the rule it breaks named. A recommendation the operator has to argue back
costs a version.
- **Explain each question with a concrete picture** in the operator's words: what they would see, do or
lose under each option. No internal names (a record number, a verb, a word the glossary lacks) without
what it is beside it.
3. **Take a number.** `knowledge-base.reserve` with `kind: research` and `for`: the effort's title. The number
is spent whether or not the effort is ever proposed; one never proposed is withdrawn after a week. Never
pick one by hand.
@@ -57,25 +48,10 @@ An idea arrives in one of two forms, and the first step differs:
lists them and gives the difference between two. Until issue 844 is delivered, the knowledge base
takes a new version of an accepted, active effort only as a progressive insight: give `insight`, saying
what the effort held before the new finding, and mark the finding in the text with its date.
- **Propose a version per settled set, not per answer.** While the operator answers a run of questions,
or while experiments run, keep the answers and findings in the session's save point and propose once
when the set is settled. Each version is reviewed and resent whole, so a version per answer multiplies
the reviews.
- **Pre-check before proposing**, against what the review sends back most: every record, issue or design
the text names is in `links`; work put off names the issue that tracks it (an acceptance test is not
put-off work: it is what the build proves, step 6); each figure is given as measured (a range, not a
rounded claim); no word on a glossary *Not:* line.
- **Try at the cheapest level that answers the question.** A program's own behaviour (a library, a
server, a protocol) is tried in process, on the machine's loopback, in minutes. Lab runs (about 12 to
16 minutes fresh) are for the mesh's own code; before that code exists, a lab run tests nothing an
in-process test does not, and its lab scenario is written as the build's acceptance test instead.
6. **Settle the direction with the operator.** When the questions are answered, write `05-direction.md`:
the proposed decisions in a few lines each, the options rejected and why, and the build's acceptance
tests: what the build must prove before it is done, carried by its milestones (playbook
[04](04-build-handoff.md)). Nothing else is left open: each question closes by a test, by a decision the
effort records with its reason (a small design limit is the lead's), or by the operator. Ask the
operator to confirm or change the direction, one point at a time, then propose it once. Then the effort
graduates through playbook [02](02-graduation.md).
the proposed decisions in a few lines each, the options rejected and why, what is left open. Ask the
operator to confirm or change it, one point at a time. Then the effort graduates through playbook
[02](02-graduation.md).
## Bounds and models
@@ -124,9 +100,6 @@ and why, is the more expensive half to rediscover.
The rules on an effort are the knowledge base's: `propose` refuses one that breaks a rule that judges one
record (the module's table test holds one case per rule), and the rules that judge the whole record set run
after every acceptance and raise a condition when one fails. The habits of steps 2, 5 and 6 (options checked
against the rules, one version per settled set, the cheapest level, nothing left open) are the lead's, read by
the reviewer; of the pre-check, `propose` refuses a link to nothing and a retired word, and the review returns
a record named but not linked, an untracked deferral and a figure not as measured. That this repository holds
no effort is `records.py`'s `no-records` check, on every pull request. An active effort with no new version
for seven days is the smell of research left behind: its lead closes or continues it.
after every acceptance and raise a condition when one fails. That this repository holds no effort is
`records.py`'s `no-records` check, on every pull request. An active effort with no new version for seven
days is the smell of research left behind: its lead closes or continues it.
+1 -15
View File
@@ -23,16 +23,6 @@ about an hour, and said to the operator if it runs past.
say which, in writing, before proceeding.
2. **Record the decisions** (below, *Writing a decision record*): one record per choice that could be
reversed on its own, not one record for the whole effort.
- **Write them together, not one after another.** Reserve every number first, then propose each record
as soon as it is written, without waiting for the review of the one before; the reviews run side by
side, and the operator's asks for the records that need them arrive together. A record that
`rests-on` or `extends` a sibling is proposed once that sibling is accepted.
- **Take the clauses from the confirmed direction** and cite the effort (`cites`, `"research NNN"`) for
the evidence instead of retyping its findings: a record's Context holds the few facts its decision
rests on, with the effort named for the rest.
- **Pre-check each record before proposing it**, as for research (playbook [01](01-research.md), step
5): every record, issue or design it names is in `links`; each deferral names its issue; each figure
is given as measured; no word on a glossary *Not:* line.
3. **Write the design.** Create the document under `03-DESIGN/01-to-be/` with frontmatter:
```yaml
@@ -46,8 +36,6 @@ about an hour, and said to the operator if it runs past.
---
```
The design lists the direction's acceptance tests: what the build proves before it is done.
4. **Hand it to the work breakdown.** The design goes on through playbook [04](04-build-handoff.md):
milestones, issues, and each milestone built as one feature step (playbook [07](07-feature-branches.md)).
5. **Close the effort.** `knowledge-base.propose` the effort again, whole, with `status: graduated` and a
@@ -153,6 +141,4 @@ record (its module's table test holds one case per rule), and the four rules tha
changes, an accepted record extending a superseded one) run after every acceptance and raise a condition
when one fails. In this repository, `records.py` checks that a design's `decisions:` entries and every
"ADR NNNN" in the text are well formed, and that no record is written here; `index.py` checks the reading
order's six topics, which the knowledge base reads. The three habits of graduating step 2 (side by side, clauses
from the direction, the pre-check) are the lead's, read by the reviewer; `propose` refuses a link to nothing,
a deferral no issue tracks and a retired word, and the review returns a record named but not linked.
order's six topics, which the knowledge base reads.
+6 -7
View File
@@ -28,11 +28,10 @@ A design becomes **milestones**, and each milestone becomes **issues**:
there; if it is not, write it before changing it. Building against an undocumented as-is is how a shipped
behaviour gets lost.
4. **Break it into milestones.** Write them into the design, in a section *Milestones*: for each, its number,
its one-sentence outcome, the acceptance tests of the design it proves, the repositories it touches, and
what it depends on. Order them so each is usable as soon as it is delivered, the smallest useful one
first.
5. **Ask the operator to confirm the milestones**, in a short table: number, outcome, the acceptance tests it
proves, repositories, the parts each repository builds. Change what they change.
its one-sentence outcome, the repositories it touches, and what it depends on. Order them so each is
usable as soon as it is delivered, the smallest useful one first.
5. **Ask the operator to confirm the milestones**, in a short table: number, outcome, repositories, the
parts each repository builds. Change what they change.
6. **Open the issues.** For each confirmed milestone, `issue-tracker.open` one issue per repository part, its
title the symptom or capability in plain words, its report naming the design, the milestone and the
decisions it builds with; link the order with `depends-on`. Write the issue numbers into the milestone's
@@ -62,5 +61,5 @@ Read by the lead and the reviewer today; a check in hq's merge-check is tracked
issues; an in-progress design without one is the smell of building without a breakdown.
- Every issue a milestone names exists in the tracker (`issue-tracker.get`), and an issue in `fixing` names
its milestone in its report.
- A milestone whose issues are all `resolved` has had its delivery plan done; its outcome sentence and
acceptance tests are proven on the mesh before the next milestone starts.
- A milestone whose issues are all `resolved` has had its delivery plan done; its outcome sentence is proven on
the mesh before the next milestone starts.
+9 -72
View File
@@ -21,16 +21,6 @@ A small fix (one repository, one issue, about an hour of work) follows
undelivered for a day: an issue done at 21:09 was still not on the machines at 15:00 the next day.
- **Work that waits and nobody notices.** Most lost time was not work at all, but a check, a delivery plan
or an agent waiting on something that had stopped, unseen.
- **Review that keeps hardening.** One fix went through seven review rounds in five and a half hours, each
asking for more hardening than its issue asked (issue 704, 2026-10-14). A round is for what makes the
change wrong; everything else is an issue of its own.
- **The first check after the whole branch is written.** A feature's catalogue branch, pushed once after
hours of local work, met its first check on 2026-10-16 and failed on 29 problems, TypeScript errors among
them, that a unit suite run continuously while working finds at once.
- **A green pull request nobody marks.** An approved, green pull request that was not marked ready waited
12 h 17 min for someone to merge it (mesh-catalog #300, 2026-10-14).
- **A module proven only after it reached the machines.** The mail modules were delivered with unit tests
only, then failed live three times (issues 859, 865, 868) and took five more hours of fixes.
## The shape
@@ -71,8 +61,7 @@ never into the running one, unless it blocks the running one.
hold, and the patterns to copy (file:line);
- what not to touch, and what lands beside it in other repositories;
- the local facts: the worktree, the branch, the check commands, a temporary directory for tests outside
the home (`TMPDIR`), and the unit tests to run (never a database server: tests that need one are
integration tests, which the forge's checks run).
the home (`TMPDIR`), a throwaway database server if the store tests need one.
When the reading is large, a read-only agent on the smaller model answers the lead's exact questions with
file:line, and the lead writes the file from its answers.
5. **Move the issues to `fixing`**, `by` naming the feature's agent for that repository.
@@ -83,8 +72,7 @@ never into the running one, unless it blocks the running one.
issues one after another, committing each locally with a message naming the issue ("Keep the assignments
on the bus (issue 652)"). It is not replaced per issue: the lead continues the same agent (by its id) with
the next instruction, so its context is paid for once.
- **Unit tests only, of what changed, each well under a second** (how-we-build §5, ADR 0391). Each issue's
first test fails before its change and passes after; `gofmt`, `go vet`
- **Unit tests only.** Each issue's first test fails before its change and passes after; `gofmt`, `go vet`
and the repository's unit tests stay green. The integration tests (`merge-check.sh` with the store and the
bus) wait for phase 3.
- **Nothing is pushed** and no pull request is opened in this phase. Never land on a red check: run the
@@ -114,40 +102,13 @@ never into the running one, unless it blocks the running one.
It says which round it is in ("round 1 of at most 3").
3. **The report goes to the same fixing agents** that wrote the code, continued by their ids, so they fix
with the context they already hold. Each answers the reviewer: what it changed, per finding, or why not.
4. **The reviewer reads the answers and the new commits**, and approves or reports again (step 5 says what a round
may ask). After round 3 the lead stops and brings the operator what is left, with a recommendation.
5. **A finding outside the issues' done-when is never a change asked, in any round.** More hardening, a
further case, a nicer form: the reviewer opens it with `issue-tracker.open` and names the number in its
report, and the round does not wait for it. What a round asks is only what makes the change wrong against
its issues and its decisions.
## Is the coast clear?
Before the push of phase 3 (and of a small fix, playbook [08](08-small-fixes.md) step 5), the lead checks, for every
repository the change touches, whether a **release branch** is in flight there: a branch other than `main` that
collects a feature's merged work to bring it into `main` as one delivery.
1. **Look for one.** A pull request into `main` whose head is a release branch (`gitea.gitea_open_pulls`), a
release branch holding merged work that `main` does not have yet (`git log origin/main..origin/<branch>`), or
a delivery plan of that release branch still running (`mesh-controller.plans`).
2. **Compare the files.** `git diff --name-only origin/main...origin/<release branch>` against the files the
change touches.
3. **Overlap: hold.** If the release branch touches a file the change touches, nothing is pushed into that repository
until the release branch's delivery plan is done. Then the feature branch is brought up to the new `main`, the unit
tests run again, and the push follows. The hold is on the wait list (its bound: the release branch's delivery plan),
and is said to the operator with what the change waits for.
4. **No overlap: go on.** A release branch in another repository, or one that shares no file with the change, does not
hold it; its merge joins the merge window as any other (ADR 0276).
Merging beside a release branch still in flight would make its lead resolve someone else's conflicts in the
middle of it, and could send part of the change with its delivery (2026-10-16: the file module's
controller part touched four files feature 57's release branch also changed).
4. **The reviewer reads the answers and the new commits**, and approves or reports again. From round 2 it
asks changes only for a finding that makes the feature wrong; smaller points become issues of their own.
After round 3 the lead stops and brings the operator what is left, with a recommendation.
## Phase 3 — Check (no review)
1. **Push every feature branch and open one pull request per repository, together, once the coast is clear**
(above). The integration tests
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
1. **Push every feature branch and open one pull request per repository, together.** Pull requests in two or
more repositories that share the branch name are one delivery group (ADR 0239 §2).
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
reviewer first confirms that commit's tree equals the reviewed one.
@@ -155,14 +116,8 @@ controller part touched four files feature 57's release branch also changed).
second review: phase 2 reviewed this tree.
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
the same fixing agents; then push once again.
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
carries an integration test that starts the module whole, its process against the real bus and store, and
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
comment `ready at <full sha>`, the head it approved); mesh-delivery merges it when its checks pass
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
4. **Mark each pull request ready** (`mesh/ready` and a comment `ready at <full sha>`) once the operator's word
for the feature is given; mesh-delivery merges it when its checks pass (ADR 0364).
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
@@ -170,8 +125,7 @@ then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Pl
## Phase 4 — Deliver
The merge starts the delivery plan: build, publish, send. A merge into a branch other than `main` is not a
delivery: no machine receives it (issue 889 while it still starts one). The lead follows it to done
The merge starts the delivery plan: build, publish, send. The lead follows it to done
(`mesh-controller.plans` with `wait` and `until: done`), then resolves the feature's issues with `fixed-by`
naming its pull requests, and removes what is left: no `feat/<slug>` branch and no `.work/<slug>` worktree
survive.
@@ -200,8 +154,6 @@ on, with when it started and its bound.
| a fixing agent's issue | 30 minutes | ask it where it stands; split or take over |
| the review | 15 minutes a round | ask the reviewer; stop at round 3 |
| a merge check | 15 minutes | read the build queue (`mesh-controller.queue`) and the check's log |
| the ready mark | 15 minutes after the acceptance is shown | the reviewer marks it, or the lead does |
| a release branch in flight that shares files | its delivery plan done | report it every ten minutes; bring the branch up to `main` after |
| a merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
| a delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
@@ -246,13 +198,6 @@ lead prepares a `/clear` as the mesh's instruction "prepare before clear" says:
feature's phase, its branches and heads, the context files' paths, the agents' ids, the wait list and the
next action; then the prompt the operator pastes. The context files make the feature resumable after a clear.
## Issues that stop
An issue stays in `fixing` only while an agent works on it. A step that stops, for a wait past its bound, a
hand-over, or the session's end, moves each of its issues not delivered back to `open` with
`issue-tracker.move` and a note saying how far it got (its branch, its last commit, what is left). A list of
issues in `fixing` that nobody works on reads to the operator as stuck work.
## How it is checked
- A feature's issues show their commits on the feature branch (`git log --grep 'issue <n>'`), and no pull
@@ -262,14 +207,6 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
- After a feature's delivery, `git branch -r | grep feat/<slug>` and `git worktree list` return nothing for it.
- More than one open pull request in a repository that share no feature name, or a feature step whose issues
stay in `fixing` for more than a working day, is the smell: stop and bring it to the operator.
- A review report that asks a change outside the issues' done-when, or a fourth round, is the failure of the
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
mark it.
- A pull request opened into a repository whose release branch was in flight and shared a file with it is the failure of
*Is the coast clear?*; the lead's report names the check it made before the push.
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
the failure of phase 3's fourth step.
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
missing sibling worktree, not a mesh fault.
+10 -24
View File
@@ -26,39 +26,30 @@ one delivery**. Everything before the push is local and fast.
need a decision or a second repository stops here and becomes a feature.
2. **Move the issue to `fixing`** with `by` as who@node.
3. **Build on a local branch** `fix/<issue>-<slug>`, in a worktree of its own branched from `main`. Write the
test that fails today first; make the change; keep `gofmt`, `go vet` and the unit tests of what changed green
(each well under a second; never a merge check or a database locally: how-we-build §5, ADR 0391).
test that fails today first; make the change; keep `gofmt`, `go vet` and the repository's unit tests green.
Commit, naming the issue. For a playbook or design edit, run the repository's own checks (in hq,
`sh merge-check.sh`).
4. **One review of the local commit, before anything is pushed** (a reviewer that did not write it, larger
model; at most 3 rounds, as playbook 07; from round 2 only what is wrong; a finding outside the issue's
done-when is opened as an issue of its own, never asked as a change). The reviewer's findings go back to the same agent that wrote the fix, continued by
model; at most 3 rounds, as playbook 07; from round 2 only what is wrong). The reviewer's findings go back to the same agent that wrote the fix, continued by
its id, so the fix keeps its context. A playbook or design edit of a few lines may skip the reviewer: the
operator's word on the pull request is its review, and the lead marks it ready on that word.
5. **Push once and open the pull request, once the coast is clear** (playbook [07](07-feature-branches.md), *Is
the coast clear?*: no release branch in flight in the repository that shares a file with the fix). The forge's merge
check runs the integration tests, the only
place they run (the operator, 2026-10-16). A failed check
operator's word on the pull request is its review.
5. **Push the branch, try it, then open the pull request.** `mesh-controller.try` with the repository and the
branch runs the merge check in the check's own toolchain before any status is set; open the pull request
only once it passes. A local run never stands in for it: the check's containers carry other tools than the
nodes (a test that called util-linux `flock -E` passed on a node and failed on BusyBox's in the check). The
forge's merge checks run the integration tests. A failed check
goes back to the same agent with the failure, and the reviewer reads only the change it makes.
6. **The reviewer marks it ready at once** (for an edit that skipped the reviewer, the lead, on the
operator's word) (`mesh/ready` and `ready at <full sha>`, the head it approved);
mesh-delivery merges it when its checks pass. A fix to a module that changes how it runs carries an
integration test starting the module whole against the real bus and store, run by the forge's checks
(ADR 0391 §1, §6); unit tests alone are not that proof, and the lab is not used. The operator's word is waited for only when the fix changes what the operator sees, removes data,
or needs the operator's terminal.
6. **Mark it ready** (`mesh/ready` and `ready at <full sha>`) once the operator's word is given; mesh-delivery
merges it when its checks pass.
7. **Follow its delivery plan to done** (`mesh-controller.plans` with `wait` and `until: done`), prove the fix on
the mesh (the symptom gone, measured), and resolve the issue with `located-in` and `fixed-by` the same hour.
A fix that stops before its delivery moves its issue back to `open` with a note saying how far it got
(branch, last commit, what is left), as playbook [07](07-feature-branches.md) says.
## Bounds
| Waiting on | Bound | Past the bound |
|---|---|---|
| building the fix | 1 hour | it is a feature: stop and plan it under playbook 07 |
| the review | 15 minutes | ask the reviewer where it stands |
| the ready mark | 15 minutes after the review approved | the reviewer marks it, or the lead does |
| the merge check | 15 minutes | read `mesh-controller.queue` and the check's log |
| the merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
| the delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
@@ -75,8 +66,3 @@ reading itself and uses one subagent only for the review.
- A small fix has one pull request with one or few commits naming its issue, opened after its review: a pull
request with many heads is a fix reviewed after its push.
- Its issue moves to `resolved` within the hour its delivery plan ends.
- A pull request reviewed and green but unmarked
for more than 15 minutes, a fix to a module's running marked ready with no integration test of the module whole, or a review report
asking a change outside the issue's done-when, is the failure of steps 4 to 6.
- An issue in `fixing` with nobody on it shows in `issue-tracker.list` with `flag: abandoned`; a stopped fix
moves it back to `open` with its note.
@@ -2,9 +2,8 @@
layer: to-be
status: in-progress
code: [mesh-controller, mesh-catalog modules/mesh-delivery]
updated: 2026-10-16
updated: 2026-10-13
decisions:
- "ADR 0382"
- "ADR 0350"
- "ADR 0335"
- "ADR 0323"
@@ -372,12 +371,6 @@ only once it is built.
group's members puts the composed check out of date: the group reads `checking` with the reason, and the
composed check runs again once a member is judged again. Checked by mesh-delivery's
`TestAGroupsComposedCheckGoesOutOfDateOnAMergeThatIsNotItsMember` and `TestARebasedMemberIsComposedAgainNotHeld`.
- **Each member's own check reads its siblings** (ADR 0382): the group's other open members into a base of
the same name are read beside a member's own check at their head merged onto their base, and a mesh-controller
sibling's merge judges it, so changes that are only consistent together pass their own checks. The controller
learns the siblings from mesh-delivery's `groups`; the verdict names each one. A sibling's new head, close or
base move puts that verdict out of date, and the merge tool merges such a member only when
`mesh/delivery-group` passed at the heads read and every sibling head read is reviewed.
- **Delivering**: in order. A member waits in `published` until the one before is `delivered` or `covered`.