@@ -154,9 +154,11 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
|
|
|
|
|
hours; it ran past its 30-minute bound for over an hour, and the reports could only say "still on part D".
|
|
|
|
|
6. **List every part the change reaches, before any agent starts**, so each is an issue of the milestone and
|
|
|
|
|
nothing is found on the way. Read, for each repository of the milestone, what it takes from the others and how:
|
|
|
|
|
the SDK's users (they pin an SDK commit, and a pin to a commit no branch holds is a download that fails later,
|
|
|
|
|
issue 1148); every program that parses a manifest strictly (search `ParseManifest` across every repository, with
|
|
|
|
|
the SDK commit each pins), which must take an SDK that knows a new manifest word (2026-10-21: design 60's
|
|
|
|
|
the users of every package the change alters, mesh-sdk and each seat's package (a seat's contract is a package its
|
|
|
|
|
holder's repository publishes, and a user takes it as a package, never as another repository's source; each user
|
|
|
|
|
builds against the latest published version, and in the group's check against the group's head, so nobody writes a
|
|
|
|
|
version or a commit for them: ADR 0573); every program that parses a manifest strictly (search `ParseManifest`
|
|
|
|
|
across every repository), which must take an SDK that knows a new manifest word (2026-10-21: design 60's
|
|
|
|
|
catalog milestone found mesh-build-go and the delivery's indexer reading manifests with an SDK from before the
|
|
|
|
|
word); the SDK's list of a defined seat's verbs, which must name a verb a module adds (2026-10-21: node-files' two
|
|
|
|
|
new verbs were refused on the claim); the node-engine's decoder for a new key on the wire; the route by which a
|
|
|
|
@@ -322,8 +324,9 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
|
|
|
|
|
**While a group is being checked, nothing else is merged or pushed into a repository that is one of its members:**
|
|
|
|
|
a moved main asks the group's check again. How it is checked: the lead's wait list names the group's members, and
|
|
|
|
|
`mesh-delivery.show` shows one check per head.
|
|
|
|
|
**A group is one check.** Before the push, every member pins the group's own mesh-sdk head exactly (the checker refuses an
|
|
|
|
|
older commit of the same branch), then all members are pushed and opened together, so the group's check runs once. A head the review replaces
|
|
|
|
|
**A group is one check.** No member names the group's mesh-sdk head, or any package's version, by hand: the group's
|
|
|
|
|
check builds every member against the group's own package heads (ADR 0573 §4). All members are pushed and opened
|
|
|
|
|
together, so the group's check runs once. A head the review replaces
|
|
|
|
|
counts for nothing against a running check; say so, and ask no other until the new head is reviewed.
|
|
|
|
|
**Before a session trusts an agent's "pushed", it reads the forge branch's head** (`git ls-remote origin refs/heads/<branch>`) and compares it with the commit reviewed; an agent may commit on a detached HEAD and report a push that never happened (2026-10-26: the first check of a reviewed fix failed "not our ref"). The pull request is opened only on that read head. Pull requests in two or
|
|
|
|
|
more repositories that share the branch name are one delivery group (ADR 0239 §2).
|
|
|
|
@@ -403,20 +406,29 @@ issue whether it is being fixed in between, after the delivery, or waits, and on
|
|
|
|
|
moved to include it): one Approve, one delivery. The old Approve ask closes itself on the new head and the new
|
|
|
|
|
head is asked once its checks pass. How it is checked: a follow-up that sits in a second pull request while the
|
|
|
|
|
first still waits shows in `gitea.gitea_list_pull_requests` as two open pull requests of one lead.
|
|
|
|
|
6. **A member pins mesh-sdk only at a commit that is a pull request's head**, merged or open (2026-10-28: the check
|
|
|
|
|
refused a pin to a merge commit on main as "on no pull request", though its tree equalled the head's). How it is
|
|
|
|
|
checked: the check's pin step; a refusal "on no pull request" is this rule skipped.
|
|
|
|
|
7. **Two groups that pin the same module's mesh-sdk conflict in `go.mod` and `go.sum`.** The group that merges
|
|
|
|
|
second merges main in and re-pins once, to a pull request head that holds both changes, after the first group
|
|
|
|
|
is merged and not before (a re-pin before makes the first group conflict). How it is checked: the check's merge
|
|
|
|
|
step; a group that conflicts after the first one merged is this rule skipped.
|
|
|
|
|
8. **A group that adds a seat, a verb or a manifest field in mesh-sdk and uses it in a module's manifest in the
|
|
|
|
|
same group cannot pass its check** until the running assigner pins a mesh-sdk that defines it, because the
|
|
|
|
|
check composes with the running assigner's mesh-sdk (issue 1585). The assigner's pin ships first, as its own
|
|
|
|
|
release. How it is checked: the check's composition step; a composition refusing the new word in such a group
|
|
|
|
|
is this rule skipped.
|
|
|
|
|
6. **Nobody pins a package** (ADR 0573 §2, §4). No commit writes a mesh package's version or commit into `go.mod`,
|
|
|
|
|
`go.sum` or `package-lock.json` to choose what a module builds against: every module builds against the latest
|
|
|
|
|
published version of each package it uses, a publish rebuilds every dependent (ADR 0573 §3, along ADR 0267 §3's
|
|
|
|
|
edges), and a group's check builds its members against the group's own heads. This replaces the pin rules learned on
|
|
|
|
|
2026-10-28 (a pin only at a pull request's head; two groups pinning one module's mesh-sdk re-pin after the first
|
|
|
|
|
merges): each was a step the developer ordered by hand, which the operator ruled out (2026-10-21, 2026-10-31). A
|
|
|
|
|
check that refuses a member for the version it names, an older head, a merge commit or a commit on no pull request
|
|
|
|
|
is a fault of the check: say it to the operator and fix the check under issue 1585, never
|
|
|
|
|
re-pin around it. How it is checked: the review refuses a hand-written version or commit of a mesh package; a check
|
|
|
|
|
of the checker that refuses one is to be built (issue 1585).
|
|
|
|
|
7. **A seat's contract is its holder's package, and a module takes another repository's code only as a package**
|
|
|
|
|
(ADR 0573 §1). A new or changed seat's records, keys, events, verbs and message schemas go into a package its
|
|
|
|
|
holder's repository publishes (a Go module or a node package), never into mesh-sdk, which keeps only what every
|
|
|
|
|
seat shares; a user imports that package, never a path into, a copy of or a `replace` to another repository's
|
|
|
|
|
source. A change that alters a seat whose contract mesh-sdk still holds moves it to the holder's package in the same
|
|
|
|
|
change (issue 167). How it is checked: the review refuses a seat-specific type, key or verb added to mesh-sdk and an
|
|
|
|
|
import of another repository's source; no check refuses them yet (issue 1585).
|
|
|
|
|
8. **A group that adds a seat, a verb or a manifest field and uses it in a module's manifest in the same group is
|
|
|
|
|
composed with the group's own mesh-sdk head** (ADR 0482 §3), so it passes in one group, with no release ahead of
|
|
|
|
|
it. How it is checked: the check's composition step; a composition that refuses the new word in such a group is a
|
|
|
|
|
fault of the check (issue 1585).
|
|
|
|
|
9. **A new head on an open pull request needs its `Reviewed-by` line at that head before the Approve is asked,
|
|
|
|
|
even for a pin-only commit.** How it is checked: the Approve's ask names the review record;
|
|
|
|
|
even for a one-line commit.** How it is checked: the Approve's ask names the review record;
|
|
|
|
|
an ask whose line names another commit is this rule skipped.
|
|
|
|
|
|
|
|
|
|
**One exception: a catalog change that uses a new manifest word.** The catalog's merge check reads
|
|
|
|
|