Issue 275: a machine waiting for its push was said to be urgent #142

Merged
mesh-admin merged 1 commits from issues/275-a-machine-waiting-for-its-push-was-said-urgent into main 2026-10-06 16:07:18 +00:00
Contributor

Records the false urgent D1 uncomposable (and the D3 silent / D13 data-unmeasured beside it) raised between assign and push on 2026-10-06, its cause, and the rule the fix holds: a finding about a machine is about what it was sent or what the next push would send it, never about the gap between an assignment and its push.

Fix: novox/mesh-controller PR #89. Status located; to be resolved once that merges. Left open: amending to-be 45's D1 row (playbook 02), and ports as the same gap.

Checks: records.py, index.py, cycle.py all pass. Role names only.

Records the false urgent D1 `uncomposable` (and the D3 `silent` / D13 `data-unmeasured` beside it) raised between `assign` and `push` on 2026-10-06, its cause, and the rule the fix holds: a finding about a machine is about what it was sent or what the next push would send it, never about the gap between an assignment and its push. Fix: novox/mesh-controller PR #89. Status `located`; to be resolved once that merges. Left open: amending to-be 45's D1 row (playbook 02), and ports as the same gap. Checks: records.py, index.py, cycle.py all pass. Role names only.
mesh-admin added 1 commit 2026-10-06 16:06:49 +00:00
mesh-admin merged commit 3e32db519f into main 2026-10-06 16:07:18 +00:00
mesh-admin deleted branch issues/275-a-machine-waiting-for-its-push-was-said-urgent 2026-10-06 16:07:18 +00:00
Author
Contributor

Delivery novox/hq@3e32db519f50 — held since 2026-10-06T23:05:28Z

Held for a person: merged without a passing check: only a person decides that it goes on — mesh-delivery.release with why lets it go on.

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-06 23:05 (new) → proposed (announced): novox/hq#142 merged; its head was not heard by this owner, so it is made from the forge's word
  • 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@3e32db519f50` — **held** since 2026-10-06T23:05:28Z Held for a person: merged without a passing check: only a person decides that it goes on — `mesh-delivery.release` with why lets it go on. **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-06 23:05 (new) → proposed (announced): novox/hq#142 merged; its head was not heard by this owner, so it is made from the forge's word - 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#142