Issue 359: a secret given reached the operator as "needs a look", and nothing said why #259

Merged
mesh-admin merged 1 commits from issues/359-a-secret-given-reached-the-operator-as-needs-a-look into main 2026-10-09 22:00:17 +00:00
Contributor

Registers issue 359 (status: located). Do not merge without review.

Symptom (2026-10-09, 23:32 local). A bot token given at the controller's terminal raised the urgent secret-given condition, and the desktop said only "Novox needs a look — Needs you: read the details to see what to do. The mesh noticed a problem it calls "secret given" with novox." — the scope's fallback words.

Cause (confirmed by a test in the controller's repository). The producer's explanation carried the clock time of the giving; the plain rule (ADR 0253) refuses a clock time (explanation: a clock time or date (23:32)), so the keeper replaced all of its words. Without the time, the same words pass. The replacement was silent: the hook told of borrowed words is set only by test suites, and the condition's unit test never passed the observation through a keeper.

Fix: a mesh-controller pull request, linked here: plain words without a time, a test through a keeper, and a log line (once per kind and reason) when a producer's words are refused at run time.

Checks run locally: records.py, index.py, cycle.py, words.py (with the catalogue's lists from its main) all pass.

Registers issue 359 (status: located). Do not merge without review. **Symptom (2026-10-09, 23:32 local).** A bot token given at the controller's terminal raised the urgent secret-given condition, and the desktop said only "Novox needs a look — Needs you: read the details to see what to do. The mesh noticed a problem it calls "secret given" with novox." — the scope's fallback words. **Cause (confirmed by a test in the controller's repository).** The producer's explanation carried the clock time of the giving; the plain rule (ADR 0253) refuses a clock time (`explanation: a clock time or date (23:32)`), so the keeper replaced all of its words. Without the time, the same words pass. The replacement was silent: the hook told of borrowed words is set only by test suites, and the condition's unit test never passed the observation through a keeper. **Fix:** a mesh-controller pull request, linked here: plain words without a time, a test through a keeper, and a log line (once per kind and reason) when a producer's words are refused at run time. Checks run locally: records.py, index.py, cycle.py, words.py (with the catalogue's lists from its main) all pass.
mesh-admin added 1 commit 2026-10-09 21:41:16 +00:00
Issue 359: a secret given reached the operator as "needs a look", because its words held a clock time and the fallback was silent
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
163521f32e
Author
Contributor

Delivery novox/hq@163521f32eb8 — delivered since 2026-10-09T22:00:33Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-09 21:41 (new) → proposed (announced): novox/hq#259's head announced
  • 2026-10-09 21:43 proposed → checked (checked): the verdict names this commit
  • 2026-10-09 21:43 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-09 22:00 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-09 22:00 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@163521f32eb8` — **delivered** since 2026-10-09T22:00:33Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-09 21:41 (new) → proposed (announced): novox/hq#259's head announced - 2026-10-09 21:43 proposed → checked (checked): the verdict names this commit - 2026-10-09 21:43 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-09 22:00 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-09 22:00 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-admin merged commit c51aedea22 into main 2026-10-09 22:00:17 +00:00
mesh-admin deleted branch issues/359-a-secret-given-reached-the-operator-as-needs-a-look 2026-10-09 22:00:17 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#259