Issues 203–205: what the first node-tools rollout found #307

Merged
mesh-admin merged 1 commits from issues/203-205-what-the-first-node-tools-rollout-found into main 2026-10-03 00:41:07 +00:00
Contributor

Three issues opened from the WP3 live step (to-be 38) on 2026-10-02, each a design-level gap the step walked into, with the evidence and the questions HQ must answer:

  • 203 A fresh assignment is pushed before its credential exists, and the runtime crash-loops — assign seals a placeholder, the real credential comes from module issue, nothing refuses the push in between.
  • 204 A controller handover re-sent every node a declaration composed from a stale view — undid node-tools on two machines two seconds after it was applied; the send is absent from the controller's own record. Same family as issue 201.
  • 205 A package resource fails against a stale package database, and nothing keeps it fresh — a ten-week-old pacman database on the control node 404s every mirror; the host neither refreshes nor can safely.

Numbers 203–205: 202 is taken on an open branch. Checks pass.

Three issues opened from the WP3 live step (to-be 38) on 2026-10-02, each a design-level gap the step walked into, with the evidence and the questions HQ must answer: - **203** A fresh assignment is pushed before its credential exists, and the runtime crash-loops — `assign` seals a placeholder, the real credential comes from `module issue`, nothing refuses the push in between. - **204** A controller handover re-sent every node a declaration composed from a stale view — undid node-tools on two machines two seconds after it was applied; the send is absent from the controller's own record. Same family as issue 201. - **205** A package resource fails against a stale package database, and nothing keeps it fresh — a ten-week-old pacman database on the control node 404s every mirror; the host neither refreshes nor can safely. Numbers 203–205: 202 is taken on an open branch. Checks pass.
mesh-admin added 1 commit 2026-10-02 21:47:37 +00:00
mesh-admin merged commit ae83c5e09b into main 2026-10-03 00:41:07 +00:00
mesh-admin deleted branch issues/203-205-what-the-first-node-tools-rollout-found 2026-10-03 00:41:08 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#307