Graduates research 062 into its design (playbook 02, step 3): design 55 is rewritten, not a new design beside it.
Section 9 designs the third slice: the design kind with its to-be and as-is sections, the glossary entry kind, the readers that change and fail when the knowledge base does not answer, links becoming record links with the old paths gone, all in one delivery (ADR 0423, tracked by issue 428).
A design's state is worked out by the knowledge base from the tracker's design links and the delivery-done announcement, never written (ADR 0424, accepted); it is an extension after design 47's last milestone and changes none of its milestones.
Section 10 carries research 062's nine acceptance tests.
Glossary, the record's words: design state and glossary entry added; design and knowledge base rewritten. Epic and milestone untouched (issue 1105, merged).
code gains hq: hq's checks and links are part of the slice.
ADR 0423 is approved by the knowledge base's review and waits for the operator's Approve; ADR 0424 is accepted. The build waits: one design is built at a time, design 47 is being built.
Checks run locally: merge-check.sh green (records, index, cycle 440 documents, words 184 head words each once).
Graduates research 062 into its design (playbook 02, step 3): design 55 is rewritten, not a new design beside it.
- Section 9 designs the third slice: the design kind with its to-be and as-is sections, the glossary entry kind, the readers that change and fail when the knowledge base does not answer, links becoming record links with the old paths gone, all in one delivery (ADR 0423, tracked by issue 428).
- A design's state is worked out by the knowledge base from the tracker's design links and the delivery-done announcement, never written (ADR 0424, accepted); it is an extension after design 47's last milestone and changes none of its milestones.
- Section 10 carries research 062's nine acceptance tests.
- Glossary, the record's words: design state and glossary entry added; design and knowledge base rewritten. Epic and milestone untouched (issue 1105, merged).
- code gains hq: hq's checks and links are part of the slice.
ADR 0423 is approved by the knowledge base's review and waits for the operator's Approve; ADR 0424 is accepted. The build waits: one design is built at a time, design 47 is being built.
Checks run locally: merge-check.sh green (records, index, cycle 440 documents, words 184 head words each once).
Reviewed-by: review-055@g14 at 05ff547358fe33d09b2f29307074de56649d7776
Deliverynovox/hq@05ff547358fe — delivered since 2026-10-18T02:28:16Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-18 02:25 (new) → proposed (announced): novox/hq#419's head announced
2026-10-18 02:27 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-18 02:27 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-18 02:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-18 02:28 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@05ff547358fe` — **delivered** since 2026-10-18T02:28:16Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-18 02:25 (new) → proposed (announced): novox/hq#419's head announced
- 2026-10-18 02:27 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-18 02:27 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-18 02:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-18 02:28 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Graduates research 062 into its design (playbook 02, step 3): design 55 is rewritten, not a new design beside it.
ADR 0423 is approved by the knowledge base's review and waits for the operator's Approve; ADR 0424 is accepted. The build waits: one design is built at a time, design 47 is being built.
Checks run locally: merge-check.sh green (records, index, cycle 440 documents, words 184 head words each once).
Reviewed-by: review-055@g14 at
05ff547358Delivery
novox/hq@05ff547358fe— delivered since 2026-10-18T02:28:16ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.