Design 55: designs and the glossary become records, and the knowledge base owns a design's state (ADR 0423, ADR 0424) #419

Merged
mesh-tools merged 2 commits from design/055-designs-and-glossary-as-records into main 2026-10-18 02:28:14 +00:00
Member

Graduates research 062 into its design (playbook 02, step 3): design 55 is rewritten, not a new design beside it.

  • Section 9 designs the third slice: the design kind with its to-be and as-is sections, the glossary entry kind, the readers that change and fail when the knowledge base does not answer, links becoming record links with the old paths gone, all in one delivery (ADR 0423, tracked by issue 428).
  • A design's state is worked out by the knowledge base from the tracker's design links and the delivery-done announcement, never written (ADR 0424, accepted); it is an extension after design 47's last milestone and changes none of its milestones.
  • Section 10 carries research 062's nine acceptance tests.
  • Glossary, the record's words: design state and glossary entry added; design and knowledge base rewritten. Epic and milestone untouched (issue 1105, merged).
  • code gains hq: hq's checks and links are part of the slice.

ADR 0423 is approved by the knowledge base's review and waits for the operator's Approve; ADR 0424 is accepted. The build waits: one design is built at a time, design 47 is being built.

Checks run locally: merge-check.sh green (records, index, cycle 440 documents, words 184 head words each once).

Reviewed-by: review-055@g14 at 05ff547358

Graduates research 062 into its design (playbook 02, step 3): design 55 is rewritten, not a new design beside it. - Section 9 designs the third slice: the design kind with its to-be and as-is sections, the glossary entry kind, the readers that change and fail when the knowledge base does not answer, links becoming record links with the old paths gone, all in one delivery (ADR 0423, tracked by issue 428). - A design's state is worked out by the knowledge base from the tracker's design links and the delivery-done announcement, never written (ADR 0424, accepted); it is an extension after design 47's last milestone and changes none of its milestones. - Section 10 carries research 062's nine acceptance tests. - Glossary, the record's words: design state and glossary entry added; design and knowledge base rewritten. Epic and milestone untouched (issue 1105, merged). - code gains hq: hq's checks and links are part of the slice. ADR 0423 is approved by the knowledge base's review and waits for the operator's Approve; ADR 0424 is accepted. The build waits: one design is built at a time, design 47 is being built. Checks run locally: merge-check.sh green (records, index, cycle 440 documents, words 184 head words each once). Reviewed-by: review-055@g14 at 05ff547358fe33d09b2f29307074de56649d7776
mesh-tools added 2 commits 2026-10-18 02:25:57 +00:00
Design 55: hq owns part of the third slice's code, its checks and links (review round 1)
mesh/delivery delivered
mesh/merge-gate head 05ff547358fe merged into trunk 76a671b8c5da — pass: the change touches no module of the mesh's graph
mesh/repo-check head 05ff547358fe merged into trunk 76a671b8c5da — pass: its merge-check.sh passed
05ff547358
Author
Member

Delivery novox/hq@05ff547358fe — delivered since 2026-10-18T02:28:16Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-18 02:25 (new) → proposed (announced): novox/hq#419's head announced
  • 2026-10-18 02:27 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-18 02:27 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-18 02:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-18 02:28 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@05ff547358fe` — **delivered** since 2026-10-18T02:28:16Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-18 02:25 (new) → proposed (announced): novox/hq#419's head announced - 2026-10-18 02:27 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-18 02:27 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-18 02:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-18 02:28 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 672011ab92 into main 2026-10-18 02:28:14 +00:00
mesh-tools deleted branch design/055-designs-and-glossary-as-records 2026-10-18 02:28:14 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#419