Playbooks 07 and 08: tests are written from acceptance criteria on the issue (issue 1118); design 47 gets milestone 5b and cites ADR 0426 (issue 1117)
#420
The operator, 2026-10-18: acceptance criteria, written by the larger-model agents and linked to the issue, guide the unit, integration and end-to-end tests; the planning moves out of the controller as milestone 5b of design 47, an issue rather than a research effort; zero delay is decided (ADR 0426).
Playbook 07: step 0 item 5 has the lead write each issue's acceptance criteria (given/when/then, the test level that proves it, numbered and cited as <issue>/AC<n>), as an issue-tracker.note until the tracker holds them as a field (issue 1118); step 1 writes the tests from them, each citing its label; step 2 reads every criterion against its test; How it is checked greps the labels.
Playbook 08: the same for a small fix (steps 1, 3, 4, How it is checked).
Design 47: milestone 5b (issue 1117), between 5 and 6; ADR 0426 in its decisions.
The operator, 2026-10-18: acceptance criteria, written by the larger-model agents and linked to the issue, guide the unit, integration and end-to-end tests; the planning moves out of the controller as milestone 5b of design 47, an issue rather than a research effort; zero delay is decided (ADR 0426).
- Playbook 07: step 0 item 5 has the lead write each issue's acceptance criteria (given/when/then, the test level that proves it, numbered and cited as `<issue>/AC<n>`), as an `issue-tracker.note` until the tracker holds them as a field (issue 1118); step 1 writes the tests from them, each citing its label; step 2 reads every criterion against its test; How it is checked greps the labels.
- Playbook 08: the same for a small fix (steps 1, 3, 4, How it is checked).
- Design 47: milestone 5b (issue 1117), between 5 and 6; ADR 0426 in its decisions.
Issues: 1117, 1118. Decision: ADR 0426.
Reviewed-by: reviewer-hq@shanks at ec373556d0bb8197f3ec025a9d5ce67bac5271b4
Deliverynovox/hq@ec373556d0bb — delivered since 2026-10-18T10:52:54Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-18 10:51 (new) → proposed (announced): novox/hq#420's head announced
2026-10-18 10:51 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-18 10:51 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-18 10:52 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-18 10:52 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@ec373556d0bb` — **delivered** since 2026-10-18T10:52:54Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-18 10:51 (new) → proposed (announced): novox/hq#420's head announced
- 2026-10-18 10:51 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-18 10:51 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-18 10:52 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-18 10:52 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The operator, 2026-10-18: acceptance criteria, written by the larger-model agents and linked to the issue, guide the unit, integration and end-to-end tests; the planning moves out of the controller as milestone 5b of design 47, an issue rather than a research effort; zero delay is decided (ADR 0426).
<issue>/AC<n>), as anissue-tracker.noteuntil the tracker holds them as a field (issue 1118); step 1 writes the tests from them, each citing its label; step 2 reads every criterion against its test; How it is checked greps the labels.Issues: 1117, 1118. Decision: ADR 0426.
Reviewed-by: reviewer-hq@shanks at
ec373556d0Delivery
novox/hq@ec373556d0bb— delivered since 2026-10-18T10:52:54ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.