Playbooks 07 and 08: tests are written from acceptance criteria on the issue (issue 1118); design 47 gets milestone 5b and cites ADR 0426 (issue 1117) #420

Merged
mesh-tools merged 3 commits from docs/acceptance-criteria-milestone-5b into main 2026-10-18 10:52:53 +00:00
3 Commits
Author SHA1 Message Date
jschoubben ec373556d0 Playbooks 07 and 08: an acceptance criterion is numbered and cited by its test as <issue>/AC<n>, so its check is a grep (review round 1)
mesh/merge-gate head ec373556d0bb merged into trunk 672011ab92ad — pass: the change touches no module of the mesh's graph
mesh/repo-check head ec373556d0bb merged into trunk 672011ab92ad — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-18 12:50:30 +02:00
jschoubben f242b8763b Design 47 builds with ADR 0426 (no timer where an event can end the wait) 2026-10-18 12:49:18 +02:00
jschoubben bb6af05f5c Playbooks 07 and 08: tests are written from acceptance criteria the larger model writes onto the issue (issue 1118); design 47 gets milestone 5b, the planning out of the controller (issue 1117) 2026-10-18 12:42:06 +02:00