The to-be design 59, the mail web client, from ADR 0440 (accepted on the operator's Approve, 2026-10-19), with its milestones as the operator confirmed them on 2026-10-19 (playbook 04): milestone 1 is issues 1255, 1261 and 1262-1268 in mesh-catalog; milestone 2 is issue 806. Also cites ADR 0439 (accepted 2026-10-19) in the as-is document of a module's state, its home.
Design only: nothing is built or delivered by this merge.
Tried: build-1792435014149077903 passed at f6311a66bf (34 s).
The to-be design 59, the mail web client, from ADR 0440 (accepted on the operator's Approve, 2026-10-19), with its milestones as the operator confirmed them on 2026-10-19 (playbook 04): milestone 1 is issues 1255, 1261 and 1262-1268 in mesh-catalog; milestone 2 is issue 806. Also cites ADR 0439 (accepted 2026-10-19) in the as-is document of a module's state, its home.
Design only: nothing is built or delivered by this merge.
Tried: build-1792435014149077903 passed at f6311a66bf66 (34 s).
Reviewed-by: review-design59@g14 at f6311a66bf66a199b370a6e30051be609ba96954
Deliverynovox/hq@f6311a66bf66 — delivered since 2026-10-19T18:44:31Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-19 18:40 (new) → proposed (announced): novox/hq#437's head announced
2026-10-19 18:44 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-19 18:44 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-19 18:44 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-19 18:44 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@f6311a66bf66` — **delivered** since 2026-10-19T18:44:31Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-19 18:40 (new) → proposed (announced): novox/hq#437's head announced
- 2026-10-19 18:44 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-19 18:44 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-19 18:44 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-19 18:44 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The to-be design 59, the mail web client, from ADR 0440 (accepted on the operator's Approve, 2026-10-19), with its milestones as the operator confirmed them on 2026-10-19 (playbook 04): milestone 1 is issues 1255, 1261 and 1262-1268 in mesh-catalog; milestone 2 is issue 806. Also cites ADR 0439 (accepted 2026-10-19) in the as-is document of a module's state, its home.
Design only: nothing is built or delivered by this merge.
Tried: build-1792435014149077903 passed at
f6311a66bf(34 s).Reviewed-by: review-design59@g14 at
f6311a66bfDelivery
novox/hq@f6311a66bf66— delivered since 2026-10-19T18:44:31ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.