Design the mail web client: mesh-mail-web on the private network behind Keycloak (design 59, ADR 0440) #437

Merged
mesh-tools merged 3 commits from design/59-the-mail-web-client into main 2026-10-19 18:44:30 +00:00
Member

The to-be design 59, the mail web client, from ADR 0440 (accepted on the operator's Approve, 2026-10-19), with its milestones as the operator confirmed them on 2026-10-19 (playbook 04): milestone 1 is issues 1255, 1261 and 1262-1268 in mesh-catalog; milestone 2 is issue 806. Also cites ADR 0439 (accepted 2026-10-19) in the as-is document of a module's state, its home.

Design only: nothing is built or delivered by this merge.

Tried: build-1792435014149077903 passed at f6311a66bf (34 s).

Reviewed-by: review-design59@g14 at f6311a66bf

The to-be design 59, the mail web client, from ADR 0440 (accepted on the operator's Approve, 2026-10-19), with its milestones as the operator confirmed them on 2026-10-19 (playbook 04): milestone 1 is issues 1255, 1261 and 1262-1268 in mesh-catalog; milestone 2 is issue 806. Also cites ADR 0439 (accepted 2026-10-19) in the as-is document of a module's state, its home. Design only: nothing is built or delivered by this merge. Tried: build-1792435014149077903 passed at f6311a66bf66 (34 s). Reviewed-by: review-design59@g14 at f6311a66bf66a199b370a6e30051be609ba96954
mesh-tools added 3 commits 2026-10-19 18:37:51 +00:00
Author
Member

Delivery novox/hq@f6311a66bf66 — delivered since 2026-10-19T18:44:31Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-19 18:40 (new) → proposed (announced): novox/hq#437's head announced
  • 2026-10-19 18:44 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-19 18:44 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-19 18:44 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-19 18:44 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@f6311a66bf66` — **delivered** since 2026-10-19T18:44:31Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-19 18:40 (new) → proposed (announced): novox/hq#437's head announced - 2026-10-19 18:44 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-19 18:44 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-19 18:44 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-19 18:44 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit c6d36b2f32 into main 2026-10-19 18:44:30 +00:00
mesh-tools deleted branch design/59-the-mail-web-client 2026-10-19 18:44:30 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#437