ADR 0239: a waiting walk is said by the controller; Phase B built #157

Merged
mesh-admin merged 1 commits from design/0239-a-waiting-walk-is-said into main 2026-10-06 22:47:15 +00:00
1 Commits
Author SHA1 Message Date
jochen 1fcd238cdf ADR 0239: a waiting walk is said by the controller; Phase B built
mesh/delivery delivered
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
A walk mesh-delivery never lets go waited for ever with nothing open; the
controller now says it itself (S16), and the delivery's own stalls are its
conditions too (D14, H2 through close).