Progress notes in to-be 48 (As built — Phases B to E), code: gains mesh-catalog. Status stays in-progress: nothing of B–E is merged or live.
The pull requests: mesh-host #50, mesh-controller #110 (B), mesh-lab #55 (R145); mesh-controller #111 (C, stacked on #110); mesh-lab #56 (D, the bed); mesh-catalog #103 (the count), #104 (first declarations, stacked on #103), mesh-media-catalog #13 (E).
Rollout order: mesh-host #50 → mesh-controller #110 (+#111) → mesh-lab #55/#56 → mesh-catalog #103 → #104 and media #13 (their gate is red until #110 is live, by design).
Checks: cycle, records, index pass; check-here repo-check PASS.
Progress notes in to-be 48 (`As built — Phases B to E`), `code:` gains mesh-catalog. Status stays `in-progress`: nothing of B–E is merged or live.
The pull requests: mesh-host #50, mesh-controller #110 (B), mesh-lab #55 (R145); mesh-controller #111 (C, stacked on #110); mesh-lab #56 (D, the bed); mesh-catalog #103 (the count), #104 (first declarations, stacked on #103), mesh-media-catalog #13 (E).
Rollout order: mesh-host #50 → mesh-controller #110 (+#111) → mesh-lab #55/#56 → mesh-catalog #103 → #104 and media #13 (their gate is red until #110 is live, by design).
Checks: cycle, records, index pass; check-here repo-check PASS.
Deliverynovox/hq@e453da3a3b29 — delivered since 2026-10-07T16:28:53Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-07 14:18 (new) → proposed (announced): novox/hq#166's head announced
2026-10-07 14:19 proposed → checked (checked): the verdict names this commit
2026-10-07 14:19 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-07 16:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-07 16:28 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@e453da3a3b29` — **delivered** since 2026-10-07T16:28:53Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-07 14:18 (new) → proposed (announced): novox/hq#166's head announced
- 2026-10-07 14:19 proposed → checked (checked): the verdict names this commit
- 2026-10-07 14:19 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-07 16:28 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-07 16:28 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Progress notes in to-be 48 (
As built — Phases B to E),code:gains mesh-catalog. Status staysin-progress: nothing of B–E is merged or live.The pull requests: mesh-host #50, mesh-controller #110 (B), mesh-lab #55 (R145); mesh-controller #111 (C, stacked on #110); mesh-lab #56 (D, the bed); mesh-catalog #103 (the count), #104 (first declarations, stacked on #103), mesh-media-catalog #13 (E).
Rollout order: mesh-host #50 → mesh-controller #110 (+#111) → mesh-lab #55/#56 → mesh-catalog #103 → #104 and media #13 (their gate is red until #110 is live, by design).
Checks: cycle, records, index pass; check-here repo-check PASS.
d6a6fc8719toe453da3a3bDelivery
novox/hq@e453da3a3b29— delivered since 2026-10-07T16:28:53ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.