Records the case from 2026-10-07. The delivery plan for a catalogue merge said it would build a new module and send it nowhere. The merge built nothing, the module stayed unregistered, and assign refused it until someone built it by hand.
The merge handler dropped touchedBy's added answer. The planner gives that same answer to the check and to the delivery plan.
This is a core issue, so it needs replay: or replay-none: at resolution.
The local runs of records, cycle, index and words, and sh merge-check.sh, all passed.
Records the case from 2026-10-07. The delivery plan for a catalogue merge said it would build a new module and send it nowhere. The merge built nothing, the module stayed unregistered, and `assign` refused it until someone built it by hand.
The merge handler dropped `touchedBy`'s `added` answer. The planner gives that same answer to the check and to the delivery plan.
- status: located
- fixed-by: mesh-controller PR #122
- This is a core issue, so it needs `replay:` or `replay-none:` at resolution.
The local runs of records, cycle, index and words, and `sh merge-check.sh`, all passed.
Deliverynovox/hq@aaaef91b7bac — delivered since 2026-10-07T21:02:07Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-07 20:40 (new) → proposed (announced): novox/hq#181's head announced
2026-10-07 20:41 proposed → checked (checked): the verdict names this commit
2026-10-07 20:41 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-07 21:02 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-07 21:02 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@aaaef91b7bac` — **delivered** since 2026-10-07T21:02:07Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-07 20:40 (new) → proposed (announced): novox/hq#181's head announced
- 2026-10-07 20:41 proposed → checked (checked): the verdict names this commit
- 2026-10-07 20:41 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-07 21:02 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-07 21:02 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Records the case from 2026-10-07. The delivery plan for a catalogue merge said it would build a new module and send it nowhere. The merge built nothing, the module stayed unregistered, and
assignrefused it until someone built it by hand.The merge handler dropped
touchedBy'saddedanswer. The planner gives that same answer to the check and to the delivery plan.replay:orreplay-none:at resolution.The local runs of records, cycle, index and words, and
sh merge-check.sh, all passed.Delivery
novox/hq@aaaef91b7bac— delivered since 2026-10-07T21:02:07ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.