ADR 0281, to-be 53 §11: an issue knows whether its fix is delivered, and a fix stuck after its merge is loud #286

Merged
mesh-admin merged 2 commits from decisions/0281-an-issue-knows-whether-its-fix-is-delivered into main 2026-10-10 16:13:06 +00:00
Contributor

Operator-approved part of the second slice (2026-10-10).

  • Each pull request in fixed-by is measured from mesh-delivery.transition (and checks once for one not heard of); get/list carry a derived delivery line, never set by hand.
  • Delivered is not resolved: every fix of an unresolved issue delivered → note + event ready-to-verify, once. A fix is named while the issue stays located (move to the same status changes what it holds).
  • A fix merged and not delivered after stuck-after (2 h, reasoned in the record) → note + warning on the operator's channel, cleared when delivered. Named gap: a bundle-only module cannot raise a controller condition (ADR 0240/0256), so it is the channel's message, not a condition.
  • Ready for depends-on uses the same fact (ADR 0279).
  • To-be 53 §1, §7, new §11.

Checks run locally: records, index, cycle, words pass. Code: mesh-catalog feat/mesh-issues-delivery.

Operator-approved part of the second slice (2026-10-10). - Each pull request in fixed-by is measured from `mesh-delivery.transition` (and `checks` once for one not heard of); `get`/`list` carry a derived delivery line, never set by hand. - Delivered is not resolved: every fix of an unresolved issue delivered → note + event `ready-to-verify`, once. A fix is named while the issue stays located (`move` to the same status changes what it holds). - A fix merged and not delivered after `stuck-after` (2 h, reasoned in the record) → note + warning on the operator's channel, cleared when delivered. Named gap: a bundle-only module cannot raise a controller condition (ADR 0240/0256), so it is the channel's message, not a condition. - Ready for depends-on uses the same fact (ADR 0279). - To-be 53 §1, §7, new §11. Checks run locally: records, index, cycle, words pass. Code: mesh-catalog feat/mesh-issues-delivery.
mesh-admin added 1 commit 2026-10-10 16:08:58 +00:00
ADR 0281, to-be 53 §11: an issue knows whether its fix is delivered, and a fix stuck after its merge is loud
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
5ef7d4dc36
The operator approved measuring, from the delivery's own events, whether each fix
an issue names reached the machines; delivered is not resolved, and a merged fix
that does not arrive must be said rather than found.
Author
Contributor

Delivery novox/hq@0336f4f04b40 — delivered since 2026-10-10T16:13:28Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-10 16:11 (new) → proposed (announced): novox/hq#286's head announced
  • 2026-10-10 16:12 proposed → checked (checked): the verdict names this commit
  • 2026-10-10 16:12 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-10 16:13 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-10 16:13 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@0336f4f04b40` — **delivered** since 2026-10-10T16:13:28Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-10 16:11 (new) → proposed (announced): novox/hq#286's head announced - 2026-10-10 16:12 proposed → checked (checked): the verdict names this commit - 2026-10-10 16:12 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-10 16:13 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-10 16:13 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
jschoubben added 1 commit 2026-10-10 16:11:48 +00:00
To-be 53: decisions in order; what it leaves out names the notifications it now has (review)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
0336f4f04b
mesh-admin merged commit 62efd13e07 into main 2026-10-10 16:13:06 +00:00
mesh-admin deleted branch decisions/0281-an-issue-knows-whether-its-fix-is-delivered 2026-10-10 16:13:06 +00:00
Sign in to join this conversation.
No Reviewers
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#286