ADR 0282 (proposed): a leaf fix runs healthy on every node within five minutes of its merge, a core module within ten #289

Merged
mesh-admin merged 3 commits from decisions/0282-a-leaf-fix-runs-healthy-everywhere-within-five-minutes-of-its-merge into main 2026-10-10 17:59:02 +00:00
3 Commits
Author SHA1 Message Date
jochen 0a6172640c Accept ADR 0282: the operator decided the delivery budgets on 2026-10-10
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
To-be 47 lists the record among its decisions, ADR 0236 and ADR 0276 say
where their mechanism moves, and the glossary drops 'proposed'.
2026-10-10 19:57:07 +02:00
jochen 8b6c306cfd ADR 0282: a core send sets aside a leaf judgement; the window row says how it was split; the repository rule cites ADR 0276
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
From the independent review: a core delivery could wait on a leaf judgement past
its ten minutes, the window figure's split was not stated beside it, and the
one-repository rule was credited to the wrong issue.
2026-10-10 19:53:36 +02:00
jochen 9414855fbe ADR 0282 (proposed): a leaf fix runs healthy on every node within five minutes of its merge, a core module within ten
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The operator asked that a bug fix land on every node in under five minutes. 51
walks measured from the controller's own records put a leaf walk at a median of
6.0 minutes (7 of 20 within five) and say where the time goes: waiting behind
another walk, the first-node judgement, the merge window. The record weighs each
lever by what it would have saved, keeps three readings for core modules (ten
minutes, the measured worst being 8.8), and proposes the measure and condition
that check it. To-be 47 gains the section, the owners and five slices; the
glossary gains delivery time, delivery budget, core and leaf module.
2026-10-10 19:51:07 +02:00