Glossary and to-be 53 for ADR 0294: a linked fix, withdrawn, abandoned (issue 483) #313

Merged
mesh-admin merged 1 commits from decisions/483-a-linked-fix-is-measured into main 2026-10-11 16:47:28 +00:00
1 Commits
Author SHA1 Message Date
jschoubben c3cc29180e Name a linked fix, withdrawn and abandoned in the glossary, and give ADR 0294 its place in to-be 53 (issue 483)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
ADR 0294 itself now lives in the knowledge base, proposed there, since the records left hq (issue 426).
2026-10-11 18:01:46 +02:00