Playbook 07: an issue is one repository and five to ten minutes; a long run says where it stands #362

Merged
mesh-tools merged 1 commits from pb07-issue-size into main 2026-10-15 12:40:49 +00:00
Member

The operator, 2026-10-15: subagents should finish in five to ten minutes. That day, one-repository issues finished in two to four minutes and two- or three-repository ones ran thirty to sixty, mostly re-merging the feature head and re-checking as other agents landed. So: one repository and one change per issue (readers-then-writer across repositories is two issues), the repository's own check as the floor (mesh-controller #342's took 6m51s), and an agent past fifteen minutes says where it stands.

Independent review (local, Sonnet): round 1 CHANGES (an unbacked figure), fixed by citing the measurement; round 2 APPROVE at 3301c4d. This forge commit 048f1454 has the same tree as 3301c4d (32105924), on main c2ee442.

The operator, 2026-10-15: subagents should finish in five to ten minutes. That day, one-repository issues finished in two to four minutes and two- or three-repository ones ran thirty to sixty, mostly re-merging the feature head and re-checking as other agents landed. So: one repository and one change per issue (readers-then-writer across repositories is two issues), the repository's own check as the floor (mesh-controller #342's took 6m51s), and an agent past fifteen minutes says where it stands. Independent review (local, Sonnet): round 1 CHANGES (an unbacked figure), fixed by citing the measurement; round 2 APPROVE at 3301c4d. This forge commit 048f1454 has the same tree as 3301c4d (32105924), on main c2ee442.
mesh-tools added 1 commit 2026-10-15 12:37:41 +00:00
Size an issue for one repository and five to ten minutes, and have a long run say where it stands, in playbook 07
mesh/merge-gate head 048f14540a50 merged into trunk c2ee44255e5b — pass: the change touches no module of the mesh's graph
mesh/repo-check head 048f14540a50 merged into trunk c2ee44255e5b — pass: its merge-check.sh passed
mesh/delivery delivered
048f14540a
On 2026-10-15 issues spanning one repository finished in two to four minutes, while those spanning two or
three ran for thirty to sixty, mostly merging the feature head and checking again as other agents landed.
The operator asked for agents that finish in five to ten minutes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Author
Member

Delivery novox/hq@048f14540a50 — delivered since 2026-10-15T12:40:50Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-15 12:37 (new) → proposed (announced): novox/hq#362's head announced
  • 2026-10-15 12:38 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-15 12:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-15 12:40 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-15 12:40 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@048f14540a50` — **delivered** since 2026-10-15T12:40:50Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-15 12:37 (new) → proposed (announced): novox/hq#362's head announced - 2026-10-15 12:38 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-15 12:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-15 12:40 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-15 12:40 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit a7d4c39535 into main 2026-10-15 12:40:49 +00:00
mesh-tools deleted branch pb07-issue-size 2026-10-15 12:40:49 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#362