Playbook 08: try a fix's branch before its pull request #369

Open
mesh-tools wants to merge 1 commits from playbooks/08-try-before-the-pull-request into main
Member

Step 5 of playbook 08 now runs mesh-controller.try on the pushed branch and opens the pull request only once it passes. A local run never stands in for it: the check's containers carry other tools than the nodes. Seen 2026-10-15 on mesh-catalog #323 (issues 860, 862): a test calling util-linux flock -E passed on a node and failed on BusyBox's flock in the check, costing a review round.

A playbook edit of a few lines: the operator's word on this pull request is its review (playbook 08 step 4). hq's merge-check.sh passes locally.

Step 5 of playbook 08 now runs `mesh-controller.try` on the pushed branch and opens the pull request only once it passes. A local run never stands in for it: the check's containers carry other tools than the nodes. Seen 2026-10-15 on mesh-catalog #323 (issues 860, 862): a test calling util-linux `flock -E` passed on a node and failed on BusyBox's flock in the check, costing a review round. A playbook edit of a few lines: the operator's word on this pull request is its review (playbook 08 step 4). hq's merge-check.sh passes locally.
mesh-tools added 1 commit 2026-10-15 21:33:28 +00:00
Try a small fix's branch before its pull request, since local runs miss the check's toolchain (playbook 08)
mesh/delivery checking
mesh/merge-gate out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
ba7c9e7f17
Author
Member

Delivery novox/hq@ba7c9e7f1765 — proposed since 2026-10-15T23:52:51Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-15 21:33 (new) → proposed (announced): novox/hq#369's head announced
  • 2026-10-15 21:34 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-15 21:34 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-15 23:52 ready → proposed (trunk moved): out of date: judged against trunk 9bfd57174f, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@ba7c9e7f1765` — **proposed** since 2026-10-15T23:52:51Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-15 21:33 (new) → proposed (announced): novox/hq#369's head announced - 2026-10-15 21:34 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-15 21:34 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-15 23:52 ready → proposed (trunk moved): out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Some checks are pending
mesh/delivery checking
mesh/merge-gate out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 9bfd57174fab, the trunk is now f8c0676b3a1d; judged again on a recheck or when it is merged
Required
Details
Some required checks are missing.
You are not authorized to merge this pull request.
This branch is out-of-date with the base branch
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin playbooks/08-try-before-the-pull-request:playbooks/08-try-before-the-pull-request
git checkout playbooks/08-try-before-the-pull-request
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#369