Adds a section to design 47 for ADR 0395 (issue 888): when a repository's trunk moves, mesh-delivery asks the check of every active open pull request into it at once; an older check of the same pull request is ended; ready ones first; pull requests untouched for 7 days left out; a recheck takes a proposed delivery.
A design edit (playbook 08 step 4): the operator's word on this pull request is its review. sh merge-check.sh passes.
Adds a section to design 47 for ADR 0395 (issue 888): when a repository's trunk moves, mesh-delivery asks the check of every active open pull request into it at once; an older check of the same pull request is ended; ready ones first; pull requests untouched for 7 days left out; a recheck takes a proposed delivery.
A design edit (playbook 08 step 4): the operator's word on this pull request is its review. `sh merge-check.sh` passes.
Deliverynovox/hq@12e75cdfa215 — delivered since 2026-10-16T17:35:55Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-16 17:28 (new) → proposed (announced): novox/hq#381's head announced
2026-10-16 17:29 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-16 17:29 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-16 17:35 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-16 17:35 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@12e75cdfa215` — **delivered** since 2026-10-16T17:35:55Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-16 17:28 (new) → proposed (announced): novox/hq#381's head announced
- 2026-10-16 17:29 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-16 17:29 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-16 17:35 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-16 17:35 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh/merge-gate: ERROR — the check could not run: killed by hand
mesh/repo-check: ERROR — the check could not run: killed by hand
Run by the build seat on shanks as build-1792143688167563119 (builds --log build-1792143688167563119).
**Merge check** at `09ec150b`
- `mesh/merge-gate`: **ERROR** — the check could not run: killed by hand
- `mesh/repo-check`: **ERROR** — the check could not run: killed by hand
Run by the build seat on shanks as `build-1792143688167563119` (`builds --log build-1792143688167563119`).
Reviewed by reviewer-381@shanks: approved in two rounds against ADR 0395 as accepted; marked by lead-926@shanks on the operator's word (2026-10-16), the reviewer's own mark was refused by the permission check. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
ready at 12e75cdfa215ed70c7d1575fd5f0ef7fc26c7986
Reviewed by reviewer-381@shanks: approved in two rounds against ADR 0395 as accepted; marked by lead-926@shanks on the operator's word (2026-10-16), the reviewer's own mark was refused by the permission check. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Adds a section to design 47 for ADR 0395 (issue 888): when a repository's trunk moves, mesh-delivery asks the check of every active open pull request into it at once; an older check of the same pull request is ended; ready ones first; pull requests untouched for 7 days left out; a recheck takes a proposed delivery.
A design edit (playbook 08 step 4): the operator's word on this pull request is its review.
sh merge-check.shpasses.Delivery
novox/hq@12e75cdfa215— delivered since 2026-10-16T17:35:55ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
09ec150bmesh/merge-gate: ERROR — the check could not run: killed by handmesh/repo-check: ERROR — the check could not run: killed by handRun by the build seat on shanks as
build-1792143688167563119(builds --log build-1792143688167563119).ready at
12e75cdfa2Reviewed by reviewer-381@shanks: approved in two rounds against ADR 0395 as accepted; marked by lead-926@shanks on the operator's word (2026-10-16), the reviewer's own mark was refused by the permission check. Marked through mesh-delivery.mark-ready (novox/hq issue 913).