Playbooks 07 and 04: a milestone is one release, never cut for size or time #401

Merged
mesh-tools merged 2 commits from fix/pb07-a-milestone-is-one-release into main 2026-10-17 11:50:34 +00:00
3 changed files with 7 additions and 7 deletions
Showing only changes of commit addbd74c39 - Show all commits
+3 -3
View File
@@ -44,9 +44,9 @@ A design becomes **milestones**, and each milestone becomes **issues**:
entry in the design.
7. **Flip the status.** `status: in-progress`, `updated:` today; the design change goes through playbook
[08](08-small-fixes.md) (one hq pull request).
8. **Hand each milestone to playbook 07, one at a time.** The milestone is the feature step; its issues are the
step's issues; the next milestone starts when the previous one's delivery plan is done. A design waits while
another design's milestones are being built: one design is built at a time (playbook
8. **Hand each milestone to playbook 07, one at a time.** The milestone is one release of playbook 07; its issues
are the release's issues; the next milestone starts when the previous one's delivery plan is done. A design waits
while another design's milestones are being built: one design is built at a time (playbook
[07](07-feature-branches.md)), so this step starts only when the design before it is delivered.
9. **On completion of the last milestone**, run the "when something ships" section of playbook
[02](02-graduation.md).
+2 -2
View File
@@ -250,9 +250,9 @@ left, its frontmatter still saying `designed`, read to another session as not bu
was started beside it (issue 1009, 2026-10-17). So the lead writes the design's state back at each of these
moments, the same hour, an hq change going through [playbook 08](08-small-fixes.md):
- **The first step starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
- **The first milestone starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
if it is not already.
- **A step's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
it is delivered, with the date.
- **The building pauses with work left** (another design takes its turn, a hand-over, the session's end): the
design stays `in-progress`, and each issue left gets a note with `issue-tracker.note` saying what it waits
@@ -485,8 +485,8 @@ What the build proves before this design is implemented (research 055's directio
## Milestones
Confirmed by the operator on 2026-10-17 (playbook 04). Each is one feature step of playbook 07; the next starts
when the previous one's delivery is done. Each milestone is one release (playbook 07).
Confirmed by the operator on 2026-10-17 (playbook 04). Each is one release of playbook 07; the next starts
when the previous one's delivery is done.
| # | Outcome | Acceptance tests | Repositories | Issues |
|---|---|---|---|---|