@@ -40,14 +40,16 @@ opened **once**, after the review. It runs in five phases, and its time is bound
|
|
|
|
|
| Phase | What happens | Bound |
|
|
|
|
|
|---|---|---|
|
|
|
|
|
| 0. Prepare | the lead settles the open questions and writes one context file per repository | 15 minutes |
|
|
|
|
|
| 1. Develop | one fixing agent per repository builds every issue locally, unit tests only | 1 to 2 hours |
|
|
|
|
|
| 1. Develop | one fixing agent per repository builds every issue locally, unit tests only | the milestone's issues, 30 minutes each |
|
|
|
|
|
| 2. Review | one reviewer reads all of it; reports go both ways; at most 3 rounds | 15 minutes |
|
|
|
|
|
| 3. Check | push; the forge's merge checks run the integration tests; no further review | one check run |
|
|
|
|
|
| 4. Deliver | merge; the delivery plan builds, publishes and sends the whole feature | its delivery plan |
|
|
|
|
|
|
|
|
|
|
A feature that cannot be developed in about two hours is split into **steps**. Each step runs all five
|
|
|
|
|
phases on its own; the next step starts only when the previous step's delivery plan is done. A step is the
|
|
|
|
|
unit that ships, so nothing finished waits for work that is not.
|
|
|
|
|
**One milestone is one release** (the operator, 2026-10-17). A milestone is developed whole, reviewed once,
|
|
|
|
|
pushed once and delivered once. It is never cut into steps for its size or for time: every cut adds a review, a
|
|
|
|
|
merge check, an Approve and a delivery plan of waiting, so the fewest cuts is the fastest. Milestones are cut by
|
|
|
|
|
release order when the design is broken up (playbook [04](04-build-handoff.md)); a release-order dependency found
|
|
|
|
|
inside a milestone is a fault of that cut, said to the operator, never a silent extra step.
|
|
|
|
|
|
|
|
|
|
**One design is built at a time** (the operator, 2026-10-17). While the milestones of one design are being
|
|
|
|
|
built, no milestone of another design starts: its issues stay `open`, and nobody moves them to `diagnosing` or
|
|
|
|
@@ -55,16 +57,14 @@ built, no milestone of another design starts: its issues stay `open`, and nobody
|
|
|
|
|
lead who finds another design's milestone already in `fixing` asks its owner before starting its own. A small
|
|
|
|
|
fix ([playbook 08](08-small-fixes.md)) and an issue that is in no design's milestones are not held by this rule.
|
|
|
|
|
|
|
|
|
|
**Scope is fixed at phase 0.** An issue found during a feature goes to the next step or the next feature,
|
|
|
|
|
**Scope is fixed at phase 0.** An issue found during a feature goes to the next milestone or the next feature,
|
|
|
|
|
never into the running one, unless it blocks the running one.
|
|
|
|
|
|
|
|
|
|
## Phase 0 — Prepare (the lead, larger model)
|
|
|
|
|
|
|
|
|
|
1. **Name the feature once:** `feat/<slug>`, the same branch name in every repository it touches. The
|
|
|
|
|
branch is never protected. **One milestone is one branch per repository** (the operator, 2026-10-17): every
|
|
|
|
|
step of a milestone uses the milestone's one name and its one folder `.work/<slug>/`; after a step's merge,
|
|
|
|
|
which removes the branch on the forge, the next step makes it again from the new `main` under the same name.
|
|
|
|
|
Never a second name for a step (`-2`, `-step2`).
|
|
|
|
|
branch is never protected. **One milestone is one branch per repository** (the operator, 2026-10-17), with one
|
|
|
|
|
folder `.work/<slug>/`; never a second name for part of it (`-2`, `-step2`).
|
|
|
|
|
2. **Make the worktrees:** one per touched repository under `.work/<slug>/<repo>`, branched off `main`
|
|
|
|
|
(`git worktree add .work/<slug>/<repo> -b feat/<slug> origin/main`). The lab beds find the other
|
|
|
|
|
repositories by sibling path, so add the untouched siblings the lab reads as detached worktrees on
|
|
|
|
@@ -144,21 +144,21 @@ never into the running one, unless it blocks the running one.
|
|
|
|
|
second review: phase 2 reviewed this tree.
|
|
|
|
|
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
|
|
|
|
the same fixing agents; then push once again.
|
|
|
|
|
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
|
|
|
|
|
4. **The milestone's acceptance is proven before it is marked ready.** A milestone that adds or changes a module
|
|
|
|
|
carries an integration test that starts the module whole, its process against the real bus and store, and
|
|
|
|
|
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
|
|
|
|
shows the milestone's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
|
|
|
|
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
|
|
|
|
|
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** with
|
|
|
|
|
`mesh-delivery.mark-ready` (the delivery of the head it approved, who reviewed it and why), which writes the
|
|
|
|
|
label `mesh/ready` and then `ready at <full sha>`, the order the forge counts (issue 913); mesh-delivery merges it when its checks pass
|
|
|
|
|
and the operator approved the merge into main on Telegram, the channel that proves who answered today (ADR 0364,
|
|
|
|
|
ADR 0398 §3; an Approve at the terminal is issue 953). Beyond that
|
|
|
|
|
Approve, the operator's word is waited for only when the step changes what the operator sees, removes
|
|
|
|
|
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
|
|
|
|
|
Approve, the operator's word is waited for only when the milestone changes what the operator sees, removes
|
|
|
|
|
data, or needs a step only the operator's terminal can take; the lead says which before the milestone starts.
|
|
|
|
|
|
|
|
|
|
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
|
|
|
|
|
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
|
|
|
|
|
then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Plan such a feature as two steps.
|
|
|
|
|
then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Such work is two releases, the controller's first, and playbook 04 cuts its milestones that way.
|
|
|
|
|
The exception ends when milestone 3 of design 47 is delivered (issue 977, ADR 0402, ADR 0403): the group's composed
|
|
|
|
|
check, judged by the group's controller, is then each member's gate, and the feature is one group.
|
|
|
|
|
|
|
|
|
@@ -207,7 +207,7 @@ unit and its bound or baseline; an issue is named by its number and a few words,
|
|
|
|
|
waits for, marked ✓ landed, ▶ fixing, ⏸ waiting, ✗ stopped:
|
|
|
|
|
|
|
|
|
|
```
|
|
|
|
|
Feature <slug> · step <n> of <m> · phase <name>, <minutes used> of <bound> min
|
|
|
|
|
Feature <slug> · milestone <n> of <m> · phase <name>, <minutes used> of <bound> min
|
|
|
|
|
Issues: <landed> of <total> landed · <fixing> fixing · <waiting> waiting
|
|
|
|
|
|
|
|
|
|
mesh-controller (agent: fixing, 2 of 3 landed)
|
|
|
|
@@ -228,11 +228,11 @@ Next: <the next action, one line>
|
|
|
|
|
**The short layout** (on a channel such as Telegram, or when nothing changed but time):
|
|
|
|
|
|
|
|
|
|
```
|
|
|
|
|
<slug> step <n>/<m> · <phase> <used>/<bound> min · <landed>/<total> landed · past bound: <none | what> · needs you: <nothing | what> · week <n> %
|
|
|
|
|
<slug> milestone <n>/<m> · <phase> <used>/<bound> min · <landed>/<total> landed · past bound: <none | what> · needs you: <nothing | what> · week <n> %
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
A report says what changed since the last one first. In the session every report is the full layout, the whole
|
|
|
|
|
tree of the step's issues included, also when only time passed: the operator reads the state from it without
|
|
|
|
|
tree of the milestone's issues included, also when only time passed: the operator reads the state from it without
|
|
|
|
|
asking. The short layout is for a channel.
|
|
|
|
|
|
|
|
|
|
## The context of the lead's own session
|
|
|
|
@@ -250,9 +250,9 @@ left, its frontmatter still saying `designed`, read to another session as not bu
|
|
|
|
|
was started beside it (issue 1009, 2026-10-17). So the lead writes the design's state back at each of these
|
|
|
|
|
moments, the same hour, an hq change going through [playbook 08](08-small-fixes.md):
|
|
|
|
|
|
|
|
|
|
- **The first step starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
|
|
|
|
|
- **The first milestone starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
|
|
|
|
|
if it is not already.
|
|
|
|
|
- **A step's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
|
|
|
|
|
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
|
|
|
|
|
it is delivered, with the date.
|
|
|
|
|
- **The building pauses with work left** (another design takes its turn, a hand-over, the session's end): the
|
|
|
|
|
design stays `in-progress`, and each issue left gets a note with `issue-tracker.note` saying what it waits
|
|
|
|
@@ -263,7 +263,7 @@ moments, the same hour, an hq change going through [playbook 08](08-small-fixes.
|
|
|
|
|
|
|
|
|
|
## Issues that stop
|
|
|
|
|
|
|
|
|
|
An issue stays in `fixing` only while an agent works on it. A step that stops, for a wait past its bound, a
|
|
|
|
|
An issue stays in `fixing` only while an agent works on it. A milestone that stops, for a wait past its bound, a
|
|
|
|
|
hand-over, or the session's end, moves each of its issues not delivered back to `open` with
|
|
|
|
|
`issue-tracker.move` and a note saying how far it got (its branch, its last commit, what is left). A list of
|
|
|
|
|
issues in `fixing` that nobody works on reads to the operator as stuck work.
|
|
|
|
@@ -286,13 +286,13 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
|
|
|
|
|
note saying what it waits for; one without such a note is a pause not written back.
|
|
|
|
|
- The milestone issues in `fixing` (`issue-tracker.list`) belong to one design at most: milestone issues
|
|
|
|
|
of two designs in `fixing` at once is the failure of "one design is built at a time".
|
|
|
|
|
- More than one open pull request in a repository that share no feature name, or a feature step whose issues
|
|
|
|
|
- More than one open pull request in a repository that share no feature name, or a milestone whose issues
|
|
|
|
|
stay in `fixing` for more than a working day, is the smell: stop and bring it to the operator.
|
|
|
|
|
- A review report that asks a change outside the issues' done-when, or a fourth round, is the failure of the
|
|
|
|
|
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
|
|
|
|
|
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
|
|
|
|
|
mark it.
|
|
|
|
|
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
|
|
|
|
|
- A milestone that adds or changes a module marked ready with no integration test that starts the module whole is
|
|
|
|
|
the failure of phase 3's fourth step.
|
|
|
|
|
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
|
|
|
|
|
missing sibling worktree, not a mesh fault.
|
|
|
|
|