Playbooks 07 and 08: integration tests run once through mesh-controller.try before the pull request, never on the machine #421

Merged
mesh-tools merged 1 commits from docs/integration-tests-through-try into main 2026-10-18 13:05:04 +00:00
Member

The operator, 2026-10-18: three pushes in a row failed their first merge check on faults a run before the pull request finds in minutes, and no store or bus is started by hand.

  • Playbook 07: the check step pushes, runs mesh-controller.try on each pushed branch, and opens the pull requests only when every try passed; the merge check runs the integration tests again as the gate. The fixing agent's brief keeps forbidding merge-check.sh, go test -tags integration and a hand-started store or bus on the machine.
  • Playbook 08: step 5 the same for a small fix.

Matches the how-work-is-done instruction proposed at 14:52 (fingerprint bcac ea3f 90d0 2549 00e0 6836).

Review record: a playbook edit of a few lines (playbook 08 step 4); the operator's Approve of its merge is its review.

Checks run locally: records, index, cycle, words all pass.

The operator, 2026-10-18: three pushes in a row failed their first merge check on faults a run before the pull request finds in minutes, and no store or bus is started by hand. - Playbook 07: the check step pushes, runs `mesh-controller.try` on each pushed branch, and opens the pull requests only when every try passed; the merge check runs the integration tests again as the gate. The fixing agent's brief keeps forbidding `merge-check.sh`, `go test -tags integration` and a hand-started store or bus on the machine. - Playbook 08: step 5 the same for a small fix. Matches the how-work-is-done instruction proposed at 14:52 (fingerprint bcac ea3f 90d0 2549 00e0 6836). Review record: a playbook edit of a few lines (playbook 08 step 4); the operator's Approve of its merge is its review. Checks run locally: records, index, cycle, words all pass.
mesh-tools added 1 commit 2026-10-18 13:03:12 +00:00
Playbooks 07 and 08: integration tests run once through mesh-controller.try on the pushed branch before the pull request, never on the machine (the operator, 2026-10-18)
mesh/delivery delivered
mesh/merge-gate head cec72d1dc962 merged into trunk b98b93efc8b0 — pass: the change touches no module of the mesh's graph
mesh/repo-check head cec72d1dc962 merged into trunk b98b93efc8b0 — pass: its merge-check.sh passed
cec72d1dc9
Author
Member

Delivery novox/hq@cec72d1dc962 — delivered since 2026-10-18T13:05:05Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-18 13:03 (new) → proposed (announced): novox/hq#421's head announced
  • 2026-10-18 13:04 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-18 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-18 13:05 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-18 13:05 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@cec72d1dc962` — **delivered** since 2026-10-18T13:05:05Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-18 13:03 (new) → proposed (announced): novox/hq#421's head announced - 2026-10-18 13:04 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-18 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-18 13:05 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-18 13:05 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 42ecaa7ac4 into main 2026-10-18 13:05:04 +00:00
mesh-tools deleted branch docs/integration-tests-through-try 2026-10-18 13:05:04 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#421