Follows #423, which merged at cd9336d before this commit was pushed (playbook 04 steps 5 and 6).
The operator confirmed on 2026-10-18 releases 1 to 6 of ADR 0429 as design 47's milestones, releases 1 and 2 as one, milestone 6 folded into release 4.
Release 1-2's issues: 1131 (key layouts, mesh-sdk), 1132 (have keys, the node-engine), 1136 (credentials for the parts, mesh-controller), 1134 (the view), 1135 (the watchman), 1137 (the nox-delivery alias, zsh), with their depends-on order; later releases' issues are opened when each is prepared.
Follows #423, which merged at cd9336d before this commit was pushed (playbook 04 steps 5 and 6).
- The operator confirmed on 2026-10-18 releases 1 to 6 of ADR 0429 as design 47's milestones, releases 1 and 2 as one, milestone 6 folded into release 4.
- Release 1-2's issues: 1131 (key layouts, mesh-sdk), 1132 (have keys, the node-engine), 1136 (credentials for the parts, mesh-controller), 1134 (the view), 1135 (the watchman), 1137 (the nox-delivery alias, zsh), with their depends-on order; later releases' issues are opened when each is prepared.
Checks: `sh merge-check.sh` passes.
Reviewed-by: reviewer-47@shanks at d81c23b65a55380f46dad34c46c5ddca8f8860bf
Deliverynovox/hq@d81c23b65a55 — delivered since 2026-10-18T15:57:44Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-18 15:56 (new) → proposed (announced): novox/hq#424's head announced
2026-10-18 15:57 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-18 15:57 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-18 15:57 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-18 15:57 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@d81c23b65a55` — **delivered** since 2026-10-18T15:57:44Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-18 15:56 (new) → proposed (announced): novox/hq#424's head announced
- 2026-10-18 15:57 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-18 15:57 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-18 15:57 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-18 15:57 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Follows #423, which merged at
cd9336dbefore this commit was pushed (playbook 04 steps 5 and 6).Checks:
sh merge-check.shpasses.Reviewed-by: reviewer-47@shanks at
d81c23b65aDelivery
novox/hq@d81c23b65a55— delivered since 2026-10-18T15:57:44ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.