Design 47: R3b's issues, and the two facts its prepare step found for R3c's insight on ADR 0437 #432

Merged
mesh-tools merged 1 commits from docs/design-47-r3b-issues into main 2026-10-19 09:53:21 +00:00
Member

Design 47's milestone table, written back from R3b's prepare step (playbook 07 step 0):

  • R3b: in mesh-controller, issues 1210 (own path and merge gate rule by the seat's claim), 1211 (merge announcement heard from the seat's holder), 1212 (pull requests' keys from the holder's bucket), 1213 (merge warrant read under the named asker: the teller, or mesh-delivery until R3d), 1214 (builder computes the source fingerprint with mesh-sdk's function), 1215 (a build record carries its fingerprint's inputs), 1216 (a condition only under the module's own name, proven on the controller's grant); in the messenger, 1217 (the router takes a condition on its one subject) and 1218 (the same over the bus). One delivery group.
  • Two facts found for ADR 0437, carried into R3c's one insight with issue 1209: the controller hears no transition or group event (only merged), and the refusal of a condition under another module's name is the grant's, not the router's.

A design edit of one line: no reviewer (playbook 08 step 4); the operator's Approve of this merge is its review. hq's merge-check.sh passed locally.

Reviewed-by: none (design edit of one line, playbook 08 step 4) at 19a8e92801

Design 47's milestone table, written back from R3b's prepare step (playbook 07 step 0): - R3b: in mesh-controller, issues 1210 (own path and merge gate rule by the seat's claim), 1211 (merge announcement heard from the seat's holder), 1212 (pull requests' keys from the holder's bucket), 1213 (merge warrant read under the named asker: the teller, or mesh-delivery until R3d), 1214 (builder computes the source fingerprint with mesh-sdk's function), 1215 (a build record carries its fingerprint's inputs), 1216 (a condition only under the module's own name, proven on the controller's grant); in the messenger, 1217 (the router takes a condition on its one subject) and 1218 (the same over the bus). One delivery group. - Two facts found for ADR 0437, carried into R3c's one insight with issue 1209: the controller hears no transition or group event (only merged), and the refusal of a condition under another module's name is the grant's, not the router's. A design edit of one line: no reviewer (playbook 08 step 4); the operator's Approve of this merge is its review. hq's merge-check.sh passed locally. Reviewed-by: none (design edit of one line, playbook 08 step 4) at 19a8e928010357814cd444b244ec0520d2381e30
mesh-tools added 1 commit 2026-10-19 09:51:28 +00:00
Design 47: R3b's issues, and the two facts its prepare step found for R3c's insight on ADR 0437 (issues 1210-1218)
mesh/merge-gate head 19a8e9280103 merged into trunk 59c6954b0cf8 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 19a8e9280103 merged into trunk 59c6954b0cf8 — pass: its merge-check.sh passed
mesh/delivery delivered
19a8e92801
Author
Member

Delivery novox/hq@19a8e9280103 — delivered since 2026-10-19T09:53:24Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-19 09:51 (new) → proposed (announced): novox/hq#432's head announced
  • 2026-10-19 09:52 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-19 09:52 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-19 09:53 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-19 09:53 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@19a8e9280103` — **delivered** since 2026-10-19T09:53:24Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-19 09:51 (new) → proposed (announced): novox/hq#432's head announced - 2026-10-19 09:52 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-19 09:52 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-19 09:53 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-19 09:53 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 7e1c0f4c15 into main 2026-10-19 09:53:21 +00:00
mesh-tools deleted branch docs/design-47-r3b-issues 2026-10-19 09:53:21 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#432