Keep the drawn overview of the playbooks in hq, for a later docs site #434

Merged
mesh-tools merged 2 commits from docs/playbooks-page into main 2026-10-19 11:31:13 +00:00
Member

The operator asked (2026-10-19) to keep the drawn overview of the playbooks in hq, so a docs site can be built from it later.

  • 00-META/process/playbooks.html: one self-contained page (inline SVG, no outside resources): the development cycle across playbooks 01-09, playbook 07 in lanes per role (with the try before the review from hq #433), when tests run, the review loop, an issue's statuses and moves, where things live, and a card per playbook with its steps, bounds, what it produces and prevents and how it is checked. Drawn from hq main f269e83.
  • The markdown-only rule names it as the one exception (AGENTS.md, README.md, 00-META/README.md); a change to a playbook's steps updates it in the same pull request. Nothing checks that yet: issue 1222 asks for the check.
  • 00-overview.md links it as a picture of the playbooks, never their authority.
  • Playbook 08's 'How it is checked' had one sentence left from before #433 ('a fix reviewed after its push'); it now reads 'after its pull request was opened'.

The page names no node, address, path or person. Review: 2 rounds (round 1: the freshness rule named no check). hq's merge-check.sh passed.

Reviewed-by: reviewer-r3b@shanks at 5816ca669f

The operator asked (2026-10-19) to keep the drawn overview of the playbooks in hq, so a docs site can be built from it later. - 00-META/process/playbooks.html: one self-contained page (inline SVG, no outside resources): the development cycle across playbooks 01-09, playbook 07 in lanes per role (with the try before the review from hq #433), when tests run, the review loop, an issue's statuses and moves, where things live, and a card per playbook with its steps, bounds, what it produces and prevents and how it is checked. Drawn from hq main f269e83. - The markdown-only rule names it as the one exception (AGENTS.md, README.md, 00-META/README.md); a change to a playbook's steps updates it in the same pull request. Nothing checks that yet: issue 1222 asks for the check. - 00-overview.md links it as a picture of the playbooks, never their authority. - Playbook 08's 'How it is checked' had one sentence left from before #433 ('a fix reviewed after its push'); it now reads 'after its pull request was opened'. The page names no node, address, path or person. Review: 2 rounds (round 1: the freshness rule named no check). hq's merge-check.sh passed. Reviewed-by: reviewer-r3b@shanks at 5816ca669f2057547a5c38161bddfa4dfc9cff4e
mesh-tools added 2 commits 2026-10-19 11:29:50 +00:00
Say the page's freshness is not yet checked (issue 1222), and fix 08's leftover 'reviewed after its push' (review round 1)
mesh/merge-gate head 5816ca669f20 merged into trunk f269e83f5d1a — pass: the change touches no module of the mesh's graph
mesh/repo-check head 5816ca669f20 merged into trunk f269e83f5d1a — pass: its merge-check.sh passed
mesh/delivery delivered
5816ca669f
Author
Member

Delivery novox/hq@5816ca669f20 — delivered since 2026-10-19T11:31:14Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-19 11:29 (new) → proposed (announced): novox/hq#434's head announced
  • 2026-10-19 11:30 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-19 11:30 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-19 11:31 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-19 11:31 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@5816ca669f20` — **delivered** since 2026-10-19T11:31:14Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-19 11:29 (new) → proposed (announced): novox/hq#434's head announced - 2026-10-19 11:30 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-19 11:30 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-19 11:31 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-19 11:31 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit e7c8ce2740 into main 2026-10-19 11:31:13 +00:00
mesh-tools deleted branch docs/playbooks-page 2026-10-19 11:31:13 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#434