Design 47's R3c row, written at its prepare step (2026-10-19): its issues 1234-1241 (and 1209), the forge module (mesh-catalog) as a member of its delivery group because the forge had no tool for a commit's trees, and the two SDK layouts that ship before it (1223, 1233). The facts for ADR 0437's next insight are named (FORGE heard by consumes; the three credentials' broker test in R3d, 1243; hand-written bus connections until 1242). sh merge-check.sh passes.
A design edit of one row: the operator's Approve of its merge is its review (playbook 08 step 4).
Reviewed-by: the operator's Approve (design edit, playbook 08 step 4) at 3174d5aa6e
Design 47's R3c row, written at its prepare step (2026-10-19): its issues 1234-1241 (and 1209), the forge module (mesh-catalog) as a member of its delivery group because the forge had no tool for a commit's trees, and the two SDK layouts that ship before it (1223, 1233). The facts for ADR 0437's next insight are named (FORGE heard by consumes; the three credentials' broker test in R3d, 1243; hand-written bus connections until 1242). `sh merge-check.sh` passes.
A design edit of one row: the operator's Approve of its merge is its review (playbook 08 step 4).
Reviewed-by: the operator's Approve (design edit, playbook 08 step 4) at 3174d5aa6ef5a687e63d803bcb5a037181b34661
Deliverynovox/hq@3174d5aa6ef5 — delivered since 2026-10-19T12:48:07Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-19 12:46 (new) → proposed (announced): novox/hq#435's head announced
2026-10-19 12:47 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-19 12:47 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-19 12:48 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-19 12:48 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@3174d5aa6ef5` — **delivered** since 2026-10-19T12:48:07Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-19 12:46 (new) → proposed (announced): novox/hq#435's head announced
- 2026-10-19 12:47 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-19 12:47 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-19 12:48 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-19 12:48 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Design 47's R3c row, written at its prepare step (2026-10-19): its issues 1234-1241 (and 1209), the forge module (mesh-catalog) as a member of its delivery group because the forge had no tool for a commit's trees, and the two SDK layouts that ship before it (1223, 1233). The facts for ADR 0437's next insight are named (FORGE heard by consumes; the three credentials' broker test in R3d, 1243; hand-written bus connections until 1242).
sh merge-check.shpasses.A design edit of one row: the operator's Approve of its merge is its review (playbook 08 step 4).
Reviewed-by: the operator's Approve (design edit, playbook 08 step 4) at
3174d5aa6eDelivery
novox/hq@3174d5aa6ef5— delivered since 2026-10-19T12:48:07ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.