Answer design 47's review for release 4's check (follow-up to #438) #439

Merged
mesh-tools merged 1 commits from design/47-the-check-in-r4-review into main 2026-10-19 20:50:51 +00:00
Member

hq #438 merged at its first head (9ffa609) while its review was in round 1. This carries the round-1 fixes (commit 29ac1c7 on design/47-the-check-in-r4, copied onto main as cc605e3), all in 03-DESIGN/01-to-be/47-delivery-from-commit-to-delivered.md:

  1. The judge's own account holds only until release 4 is delivered (ADR 0446 §5).
  2. "Wherever this design says both checks passed" replaces "above".
  3. The assigner's reads (ADR 0446 §2), the version skew condition (§4) and the refusal of an unread manifest field (§5) are stated.
  4. Acceptance tests 22 and 23 say where they are measured.
  5. "What retires" gains release 4's entry (ADR 0445 §6, ADR 0446 §5-§6, ADR 0447 §1).

sh merge-check.sh passes. review-438@shanks read 29ac1c7's content in round 2 and would approve it; the review line follows once it has read this head.

Reviewed-by: review-438@shanks at cc605e3b13

hq #438 merged at its first head (9ffa609) while its review was in round 1. This carries the round-1 fixes (commit 29ac1c7 on design/47-the-check-in-r4, copied onto main as cc605e3), all in 03-DESIGN/01-to-be/47-delivery-from-commit-to-delivered.md: 1. The judge's own account holds only until release 4 is delivered (ADR 0446 §5). 2. "Wherever this design says both checks passed" replaces "above". 3. The assigner's reads (ADR 0446 §2), the version skew condition (§4) and the refusal of an unread manifest field (§5) are stated. 4. Acceptance tests 22 and 23 say where they are measured. 5. "What retires" gains release 4's entry (ADR 0445 §6, ADR 0446 §5-§6, ADR 0447 §1). `sh merge-check.sh` passes. review-438@shanks read 29ac1c7's content in round 2 and would approve it; the review line follows once it has read this head. Reviewed-by: review-438@shanks at cc605e3b1370981c97d9220592e8af0a05565e16
mesh-tools added 1 commit 2026-10-19 20:45:03 +00:00
Answer design 47's review for release 4's check: the judge's account ends at release 4, the assigner's reads and version skew and field refusal stated, where acceptance tests 22 and 23 are measured, and what release 4 retires
mesh/delivery delivered
mesh/merge-gate out of date: judged against trunk 023ad0116034, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 023ad0116034, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged
cc605e3b13
Author
Member

Delivery novox/hq@cc605e3b1370 — delivered since 2026-10-19T20:50:52Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-19 20:45 (new) → proposed (announced): novox/hq#439's head announced
  • 2026-10-19 20:50 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-19 20:50 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-19 20:50 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-19 20:50 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@cc605e3b1370` — **delivered** since 2026-10-19T20:50:52Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-19 20:45 (new) → proposed (announced): novox/hq#439's head announced - 2026-10-19 20:50 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-19 20:50 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-19 20:50 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-19 20:50 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 990a77c760 into main 2026-10-19 20:50:51 +00:00
mesh-tools deleted branch design/47-the-check-in-r4-review 2026-10-19 20:50:52 +00:00
Author
Member

Merge check at cc605e3b: head cc605e3b13 merged into trunk 023ad01160, pass

Out of date when it landed: out of date: judged against trunk 023ad01160, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged

**Merge check** at `cc605e3b`: head cc605e3b1370 merged into trunk 023ad0116034, pass **Out of date when it landed**: out of date: judged against trunk 023ad0116034, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged
Author
Member

Merge check at cc605e3b: head cc605e3b13 merged into trunk 023ad01160, pass

Out of date when it landed: out of date: judged against trunk 023ad01160, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged

**Merge check** at `cc605e3b`: head cc605e3b1370 merged into trunk 023ad0116034, pass **Out of date when it landed**: out of date: judged against trunk 023ad0116034, the trunk is now 990a77c7605e; judged again on a recheck or when it is merged
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#439