The to-be designs say what today's accepted records decided. Design 47: one check per set of heads, a trunk or sibling move carries a verdict by its package digests (ADR 0548); the hold, merge turns and the stalled line apply only while the check gates merges (ADR 0551, the operator 13:1x: an approved merge goes in at once); placement lives in the catalogue, read by the indexer into its state (ADR 0549); the vault holds every secret, signs on request, and adopts the bus accounts' hashes the bus node hands it (ADR 0550); no machine is enrolled before the third milestone (ADR 0547's answer d); new acceptance test 25. Design 24: new section 'Every secret lives in the vault'; status in-progress (the hash adoption is delivered, signing, licence grants and minting are not). Design 39: 'Every grant in the vault' (ADR 0550 §3, second milestone, waits for issue 569); status in-progress. Glossary: carried verdict, merge turn, placement file; trunk commit, vault updated. hq checks pass.
Reviewed in three rounds by review-hqamend@shanks (round 1: design 24 overstated which bus account values the controller hands the vault; round 2: two section pointers pointed the wrong way). The last round's only finding, one pointer word ('below' → 'above'), was fixed in 250c3ff6 as the reviewer asked, with no further round.
The to-be designs say what today's accepted records decided. Design 47: one check per set of heads, a trunk or sibling move carries a verdict by its package digests (ADR 0548); the hold, merge turns and the stalled line apply only while the check gates merges (ADR 0551, the operator 13:1x: an approved merge goes in at once); placement lives in the catalogue, read by the indexer into its state (ADR 0549); the vault holds every secret, signs on request, and adopts the bus accounts' hashes the bus node hands it (ADR 0550); no machine is enrolled before the third milestone (ADR 0547's answer d); new acceptance test 25. Design 24: new section 'Every secret lives in the vault'; status in-progress (the hash adoption is delivered, signing, licence grants and minting are not). Design 39: 'Every grant in the vault' (ADR 0550 §3, second milestone, waits for issue 569); status in-progress. Glossary: carried verdict, merge turn, placement file; trunk commit, vault updated. hq checks pass.
Reviewed in three rounds by review-hqamend@shanks (round 1: design 24 overstated which bus account values the controller hands the vault; round 2: two section pointers pointed the wrong way). The last round's only finding, one pointer word ('below' → 'above'), was fixed in 250c3ff6 as the reviewer asked, with no further round.
Reviewed-by: review-hqamend@shanks at 250c3ff605ab24f7648d93f4a3214ca83a04d71c
Design 47 names ADR 0548 (a check runs to its end, a trunk move carries a verdict by its package digests, the hold and the merge turn), ADR 0551 (the hold and turns only while the check gates merges), ADR 0549 (placement files read by the indexer) and ADR 0550 (the vault signs and adopts the loaded hashes), and ADR 0547's answers on placement and signing. Design 24 gains every secret in the vault; design 39 moves grants and tokens into it. The glossary gains carried verdict, merge turn and placement file.
Deliverynovox/hq@250c3ff605ab — merged since 2026-10-26T12:35:01Z
Source — source.main moved to novox/hq@3a5c4c7c4d. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
Transitions
2026-10-26 12:33 (new) → proposed (announced): novox/hq#480's head announced
2026-10-26 12:33 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-10-26 12:35 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@250c3ff605ab` — **merged** since 2026-10-26T12:35:01Z
**Source** — source.main moved to novox/hq@3a5c4c7c4d9c. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Transitions**
- 2026-10-26 12:33 (new) → proposed (announced): novox/hq#480's head announced
- 2026-10-26 12:33 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-10-26 12:35 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The to-be designs say what today's accepted records decided. Design 47: one check per set of heads, a trunk or sibling move carries a verdict by its package digests (ADR 0548); the hold, merge turns and the stalled line apply only while the check gates merges (ADR 0551, the operator 13:1x: an approved merge goes in at once); placement lives in the catalogue, read by the indexer into its state (ADR 0549); the vault holds every secret, signs on request, and adopts the bus accounts' hashes the bus node hands it (ADR 0550); no machine is enrolled before the third milestone (ADR 0547's answer d); new acceptance test 25. Design 24: new section 'Every secret lives in the vault'; status in-progress (the hash adoption is delivered, signing, licence grants and minting are not). Design 39: 'Every grant in the vault' (ADR 0550 §3, second milestone, waits for issue 569); status in-progress. Glossary: carried verdict, merge turn, placement file; trunk commit, vault updated. hq checks pass.
Reviewed in three rounds by review-hqamend@shanks (round 1: design 24 overstated which bus account values the controller hands the vault; round 2: two section pointers pointed the wrong way). The last round's only finding, one pointer word ('below' → 'above'), was fixed in
250c3ff6as the reviewer asked, with no further round.Reviewed-by: review-hqamend@shanks at
250c3ff605Delivery
novox/hq@250c3ff605ab— merged since 2026-10-26T12:35:01ZSource — source.main moved to novox/hq@3a5c4c7c4d. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.