Design 47 names the controller-exit milestones as rows; the glossary and playbook 07 name progress (issue 1947) #481

Merged
mesh-tools merged 2 commits from feat/1947-progress into main 2026-10-26 16:42:27 +00:00
Member

Issue 1947. One delivery group with novox/mesh-catalog feat/1947-progress.

  • Design 47: milestone rows L1 (issue 1945), L2 (1126), L3 (774) for the three milestones of the controller leaving build and delivery; each issue in one milestone only (1945 only in L1, 971 and 1209 in one milestone each); the milestone-3 prose names 774, with 1126's remainder carried by a note on 1126.
  • Glossary: progress.
  • Playbook 07: the report's tree comes from knowledge-base.progress, and says how it is checked.

hq go test ./... passes.

Reviewed-by: review-progress@shanks at a6e27687db

Issue 1947. One delivery group with novox/mesh-catalog feat/1947-progress. - Design 47: milestone rows L1 (issue 1945), L2 (1126), L3 (774) for the three milestones of the controller leaving build and delivery; each issue in one milestone only (1945 only in L1, 971 and 1209 in one milestone each); the milestone-3 prose names 774, with 1126's remainder carried by a note on 1126. - Glossary: progress. - Playbook 07: the report's tree comes from knowledge-base.progress, and says how it is checked. hq go test ./... passes. Reviewed-by: review-progress@shanks at a6e27687db42cc78992810170e59cc1ee213cdb0
mesh-tools added 2 commits 2026-10-26 16:28:41 +00:00
The three milestones of the controller leaving build and delivery were prose only, so no
reader of the table saw the running work; 1209 and 971 were listed in two milestones
against ADR 0493 §2.
Design 47: 1945 is L1's issue alone, and milestone 3 names 774 with 1126's rest carried by its note (issue 1947, review round 1)
mesh/delivery merged: source.main moved to novox/hq@515c405c8939
mesh/delivery-group group feat/1947-progress merged: every member is merged
mesh/check pass a6e27687db42 on 132aae843383 | unit 39 run, 0 kept, 1 skipped | integration 39 run, 0 kept, 1 skipped | composition passed in 2ms
a6e27687db
An issue belongs to one milestone (ADR 0493 §2); R6 is delivered and named 1945 for parts
L1 now carries.
Author
Member

Delivery novox/hq@a6e27687db42 — merged since 2026-10-26T16:42:29Z

Source — source.main moved to novox/hq@515c405c89. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group feat/1947-progress: novox/hq@a6e27687db, novox/mesh-catalog@87fe2c45cf

  • composed together: pass — the checker's verdict at the members' heads (b960c0fff34e)

Transitions

  • 2026-10-26 16:28 (new) → proposed (announced): novox/hq#481's head announced
  • 2026-10-26 16:28 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-26 16:42 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@a6e27687db42` — **merged** since 2026-10-26T16:42:29Z **Source** — source.main moved to novox/hq@515c405c8939. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `feat/1947-progress`: novox/hq@a6e27687db42, novox/mesh-catalog@87fe2c45cfed - composed together: pass — the checker's verdict at the members' heads (b960c0fff34e) **Transitions** - 2026-10-26 16:28 (new) → proposed (announced): novox/hq#481's head announced - 2026-10-26 16:28 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-26 16:42 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 515c405c89 into main 2026-10-26 16:42:27 +00:00
mesh-tools deleted branch feat/1947-progress 2026-10-26 16:42:27 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#481