Design 47: a placement change is answered by the nodes it places before it merges (ADR 0559, issue 1126) #485

Merged
mesh-tools merged 1 commits from feat/1126-l2b into main 2026-10-27 07:21:07 +00:00
1 Commits
Author SHA1 Message Date
jschoubben 043f8ecf9c Design 47 and the glossary: a placement change is answered by the nodes it places before it merges (ADR 0559, issue 1126)
mesh/delivery merged: source.main moved to novox/hq@420751b214c0
mesh/delivery-group group feat/1126-l2b merged: every member is merged
mesh/check pass 043f8ecf9cfa on 420751b214c0 | unit 39 run, 0 kept, 1 skipped | integration 39 run, 0 kept, 1 skipped | composition passed
The seed and every later placement pull request were to be checked as equal to what runs,
which no composition outside the node can show; the nodes now answer a placement candidate.
2026-10-27 02:14:09 +01:00