Milestone R4d's row still named n8n and said its issues were opened when it was prepared. It was built and delivered 2026-10-21 to 2026-10-23: route-proxy, nats and automx run a pinned stock image with their Go program mounted (ADR 0480), the image kind is allowed again and built rootless (ADR 0487), one delivery group with nats upgraded once after a verified snapshot (ADR 0497); n8n left R4d by the operator's word (ADR 0506). The row and its paragraph now say so and name the issues (1632-1642 resolved and delivered, 1639 and 1755 wontfix); the decisions list gains ADR 0497 and 0506. The tracker links those issues to milestone 47/R4d. No other row changes.
Checks: go test ./... at the root passes.
Review: the lead read the diff whole (prose only, role names, no node names). Rule weighed: no separate review agent for a prose-only change of one row the survey verified live (rules-are-weighed).
Milestone R4d's row still named n8n and said its issues were opened when it was prepared. It was built and delivered 2026-10-21 to 2026-10-23: route-proxy, nats and automx run a pinned stock image with their Go program mounted (ADR 0480), the image kind is allowed again and built rootless (ADR 0487), one delivery group with nats upgraded once after a verified snapshot (ADR 0497); n8n left R4d by the operator's word (ADR 0506). The row and its paragraph now say so and name the issues (1632-1642 resolved and delivered, 1639 and 1755 wontfix); the decisions list gains ADR 0497 and 0506. The tracker links those issues to milestone 47/R4d. No other row changes.
Checks: `go test ./...` at the root passes.
Review: the lead read the diff whole (prose only, role names, no node names). Rule weighed: no separate review agent for a prose-only change of one row the survey verified live (rules-are-weighed).
Reviewed-by: lead-47@shanks at 8e732e22aeff0dbf5deed16ee6d348026ff809f7
Deliverynovox/hq@8e732e22aeff — merged since 2026-10-27T21:16:04Z
Source — source.main moved to novox/hq@10bc8d396c. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
Transitions
2026-10-27 21:14 (new) → proposed (announced): novox/hq#487's head announced
2026-10-27 21:14 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-10-27 21:16 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@8e732e22aeff` — **merged** since 2026-10-27T21:16:04Z
**Source** — source.main moved to novox/hq@10bc8d396ceb. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Transitions**
- 2026-10-27 21:14 (new) → proposed (announced): novox/hq#487's head announced
- 2026-10-27 21:14 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-10-27 21:16 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Milestone R4d's row still named n8n and said its issues were opened when it was prepared. It was built and delivered 2026-10-21 to 2026-10-23: route-proxy, nats and automx run a pinned stock image with their Go program mounted (ADR 0480), the image kind is allowed again and built rootless (ADR 0487), one delivery group with nats upgraded once after a verified snapshot (ADR 0497); n8n left R4d by the operator's word (ADR 0506). The row and its paragraph now say so and name the issues (1632-1642 resolved and delivered, 1639 and 1755 wontfix); the decisions list gains ADR 0497 and 0506. The tracker links those issues to milestone 47/R4d. No other row changes.
Checks:
go test ./...at the root passes.Review: the lead read the diff whole (prose only, role names, no node names). Rule weighed: no separate review agent for a prose-only change of one row the survey verified live (rules-are-weighed).
Reviewed-by: lead-47@shanks at
8e732e22aeDelivery
novox/hq@8e732e22aeff— merged since 2026-10-27T21:16:04ZSource — source.main moved to novox/hq@10bc8d396c. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.