The operator approved the instruction section report-cadence on 2026-10-28 (11:31Z): every five minutes the tree exactly as knowledge-base.progress answers it (detail minimal), unedited, with its read-at time, and at most three lines; about every thirty minutes the detailed tree and the full layout (Opened along the way, Past its bound, Needs you, Allowance, Worth it, Next); every report ends by scheduling the next; an answer between reports is short, with no tree. It replaces how-work-is-done's 'the five-minute report is the full layout'.
Playbook 07's 'Following and reporting' now says the same, naming the section; the hand-drawn example tree, the old short layout and 'every report is the full layout' are removed; its check line names the read-at time and the scheduling. Playbook 08 and playbooks.html need no change.
Checked: go test ./... at the root passes.
The operator approved the instruction section report-cadence on 2026-10-28 (11:31Z): every five minutes the tree exactly as knowledge-base.progress answers it (detail minimal), unedited, with its read-at time, and at most three lines; about every thirty minutes the detailed tree and the full layout (Opened along the way, Past its bound, Needs you, Allowance, Worth it, Next); every report ends by scheduling the next; an answer between reports is short, with no tree. It replaces how-work-is-done's 'the five-minute report is the full layout'.
Playbook 07's 'Following and reporting' now says the same, naming the section; the hand-drawn example tree, the old short layout and 'every report is the full layout' are removed; its check line names the read-at time and the scheduling. Playbook 08 and playbooks.html need no change.
Checked: `go test ./...` at the root passes.
Reviewed-by: rev-pb-cadence@shanks at 781392b12137e3ebf7844085cf9030d7ed71ed1a
Deliverynovox/hq@781392b12137 — merged since 2026-10-28T11:35:48Z
Source — source.main moved to novox/hq@dd03229ea8. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
Transitions
2026-10-28 11:33 (new) → proposed (announced): novox/hq#491's head announced
2026-10-28 11:33 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-10-28 11:35 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@781392b12137` — **merged** since 2026-10-28T11:35:48Z
**Source** — source.main moved to novox/hq@dd03229ea886. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Transitions**
- 2026-10-28 11:33 (new) → proposed (announced): novox/hq#491's head announced
- 2026-10-28 11:33 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-10-28 11:35 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The operator approved the instruction section report-cadence on 2026-10-28 (11:31Z): every five minutes the tree exactly as knowledge-base.progress answers it (detail minimal), unedited, with its read-at time, and at most three lines; about every thirty minutes the detailed tree and the full layout (Opened along the way, Past its bound, Needs you, Allowance, Worth it, Next); every report ends by scheduling the next; an answer between reports is short, with no tree. It replaces how-work-is-done's 'the five-minute report is the full layout'.
Playbook 07's 'Following and reporting' now says the same, naming the section; the hand-drawn example tree, the old short layout and 'every report is the full layout' are removed; its check line names the read-at time and the scheduling. Playbook 08 and playbooks.html need no change.
Checked:
go test ./...at the root passes.Reviewed-by: rev-pb-cadence@shanks at
781392b121Delivery
novox/hq@781392b12137— merged since 2026-10-28T11:35:48ZSource — source.main moved to novox/hq@dd03229ea8. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.