Playbook 07: hold a delivery-system release's push on a dry run with no item open #607

Merged
mesh-tools merged 1 commits from playbook/07-dry-run-delivery into main 2026-11-13 13:49:15 +00:00
Member

The operator, 2026-11-13: "remember the mistake and make sure our pipeline catches this". G's push went through two dry runs and still met three faults the moment it was taken in:

  • the live take-in judged with the live seat list;
  • packages under renamed or removed directories were never published;
  • the gate merged a group partially.

Each was named as an open item in a dry run, or could only show in a run without the workspace's replaces. The retrospective is note 216 on issue 1966.

This adds step 2b "Dry run" to playbook 07 for a release that changes a part that judges a change, renames or adds a package path, or changes a form the take-in reads. The dry run:

  1. runs the live take-in whole, with the seat list as it will read;
  2. runs every triggered build with GOWORK=off against the packages as published;
  3. reads the gate's merge path: bases, and a complete group before any ask;
  4. holds the push on any "not run" or "not known" item.

The milestone file records it, and the review refuses a group without it. playbooks.html follows, and the glossary gains "dry run". go test ./... passes.

https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h

The operator, 2026-11-13: "remember the mistake and make sure our pipeline catches this". G's push went through two dry runs and still met three faults the moment it was taken in: - the live take-in judged with the live seat list; - packages under renamed or removed directories were never published; - the gate merged a group partially. Each was named as an open item in a dry run, or could only show in a run without the workspace's replaces. The retrospective is note 216 on issue 1966. This adds step 2b "Dry run" to playbook 07 for a release that changes a part that judges a change, renames or adds a package path, or changes a form the take-in reads. The dry run: 1. runs the live take-in whole, with the seat list as it will read; 2. runs every triggered build with GOWORK=off against the packages as published; 3. reads the gate's merge path: bases, and a complete group before any ask; 4. holds the push on any "not run" or "not known" item. The milestone file records it, and the review refuses a group without it. playbooks.html follows, and the glossary gains "dry run". `go test ./...` passes. https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh-tools added 1 commit 2026-11-13 13:42:03 +00:00
Hold a delivery-system release's push on a dry run with no item open
mesh/check checking 010a93d6bc69 on 2b39e39385b6
mesh/delivery merged: source.main moved to novox/hq@2b39e39385b6
010a93d6bc
Milestone G was pushed with its dry run's take-in item still open; once
merged, the running indexer refused G's own indexer with the live seat
list, and its trunk builds waited on renamed packages only the take-in
publishes. Playbook 07 gains step 2b: the live take-in run whole, every
build against the published packages, the gate's merge path read for the
group, and a dry run with an open item is not a pass. The glossary gains
"dry run"; the playbooks page lists the step.

Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
Author
Member

Delivery novox/hq@010a93d6bc69 — merged since 2026-11-13T13:49:16Z

Source — source.main moved to novox/hq@2b39e39385. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Transitions

  • 2026-11-13 13:42 (new) → proposed (announced): novox/hq#607's head announced
  • 2026-11-13 13:42 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-13 13:49 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@010a93d6bc69` — **merged** since 2026-11-13T13:49:16Z **Source** — source.main moved to novox/hq@2b39e39385b6. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Transitions** - 2026-11-13 13:42 (new) → proposed (announced): novox/hq#607's head announced - 2026-11-13 13:42 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-13 13:49 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 2b39e39385 into main 2026-11-13 13:49:15 +00:00
mesh-tools deleted branch playbook/07-dry-run-delivery 2026-11-13 13:49:15 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#607