Multiple fixes: issues 064, 066 and 020 resolved; 074 narrowed to two beds #68

Merged
jschoubben merged 4 commits from multiple-fixes into main 2026-09-21 20:13:21 +00:00
Showing only changes of commit e993233004 - Show all commits
@@ -20,3 +20,10 @@
**Located in:** mesh-lab, the ten declared beds, one conversion each with a lab run. Not renamed,
by decision; converted two at a time as the modules they need are raised beside them.
*2026-09-21, later.* Ten conversions were the wrong shape. Six of the ten beds duplicated coverage
that exists elsewhere since the catalogue beds and the whole-mesh beds read the catalogue: the four
sidecar beds proved a sidecar alone, which the module beds prove whole; the minio and postgres
grant beds proved a grant with a second store beside the foundation's, which the grant bed and
the vault bed prove against the catalogue. Retired, with their scenarios. Two remain declared:
route-forwarding, which needs the certificate authority beside the proxy, and the large mesh test.