Design 47 G: the lead's answer A-476 (the take-in validates nothing, holds for no indexer build, moves only its repository's modules) #700

Merged
mesh-tools merged 1 commits from design/47-G-lead-answers-110 into main 2026-11-17 19:13:32 +00:00
@@ -1864,3 +1864,13 @@ the principle that settles it, cited as "design 47 G A-n".
while a validation ask of any repository is out, since every take-in moves the one revision a request is built from;
it still compares the heads and raises A-463's merge-untaken condition meanwhile, and only its take-in waits.
`validate-tries` defaults to 3 and is at most 20. (From the develop and review of A-475.)
- **A-476** (the operator, 2026-11-17 ~17:30 CET, from the delivery walkthrough: "no manifest check needed at this
point"; "for each module that is registered in our module graph, for the affected repo -> check the fingerprints";
the indexer's own-build hold: "this is jibberish"; then "yes" to removing all three; principles 7 and 3) The take-in
is three things only: a new commit on a module's watched branch, the fingerprints of the modules registered for
that commit's repository, and a catalog revision naming the modules whose fingerprint moved. (a) The take-in asks no
manifest validation: validating a manifest becomes a step of that module's pipeline; until that step exists, nothing
validates at the take-in. (b) The indexer takes in with the build it runs, whatever build of the indexer the
revision names: ADR 0633 §1's hold and its hand take-in end (withdraws A-475 and A-475a, which tuned that hold's
validation). (c) A commit moves only modules registered for its own repository; no other repository's module is
recomputed by it. A toolchain or build-module change still moves the modules it builds, at the next take-in.