papa-hq has no ledger. Its root is AGENTS.md, CLAUDE.md, README.md, every decision is a numbered record, and its graduation playbook has no path for an unrecorded decision. hal-hq now matches. The ledger's 41 entries classified as: 10 restating a record, 11 restating design docs, 15 describing how this repository works with the reasoning sitting in a README rather than anywhere citable, 3 small rules with no home, 2 superseded stubs. Mostly a copy — and a hand-maintained index, the exact pattern ADR 0022 had just rejected for the decision index on the grounds it drifted after one addition. Keeping one copy of that while removing another is not a position. It also collided by name with 02-DECISIONS/ in any directory listing. Nothing was dropped. Records 0019-0025 give the repository decisions the reasoning they never had: HQ is its own repository and is public, design has two layers, work moves through playbooks, status lives in frontmatter, issues have a front door, the numbering is the flow, HQ is the source of the constitution. 0026 records the ledger's own removal. The three orphan rules went to how-we-build, where a rule is enforced and keeps the incident that earned it — the package rule was genuinely unwritten anywhere. Two lab decisions stated only in the ledger went into the lab design. "Deliberately not decided" went to the research effort and design document each question actually belongs to. The chronological view the ledger provided is now generated from record frontmatter, which is what it was for. The cost, stated in 0026 rather than glossed: a record is more work than a table row, so the risk is a small decision going unrecorded because nobody wanted to write a document. how-we-build takes rules cheaply, which is the mitigation, not a solution.
382 lines
16 KiB
Markdown
382 lines
16 KiB
Markdown
---
|
||
layer: to-be
|
||
status: designed
|
||
code: [hal]
|
||
updated: 2026-08-23
|
||
decisions: [02-DECISIONS/0016-a-lab-node-is-a-virtual-machine.md]
|
||
---
|
||
|
||
# End-to-end testing
|
||
|
||
**What is under test is a module.** The mesh is the harness.
|
||
|
||
You change a module or write a new one, run it end to end, and get a verdict before it goes
|
||
anywhere near production. That loop is the product of this design; everything else exists to
|
||
make it fast and honest.
|
||
|
||
This is the Phase 0 prerequisite from [`00-work-breakdown.md`](00-work-breakdown.md).
|
||
|
||
---
|
||
|
||
## Two boundaries this design sets
|
||
|
||
**Adoption is out of scope.** Bringing a node into being is the lab runner's job. Adopting a
|
||
machine that already exists, with its own configuration, is a legacy path and the lab does not
|
||
reproduce it — a scenario starts from nothing every time, which is what makes it a fixture
|
||
rather than a snapshot.
|
||
|
||
**The real topology is one test among many, not the baseline.** A scenario declares the mesh
|
||
its question needs. If something can only be tested against the shape the mesh happens to have
|
||
today, that is a gap in the vocabulary rather than a reason to privilege that shape.
|
||
|
||
|
||
## Where this sits in the way work happens
|
||
|
||
Work reaches the mesh along one path today:
|
||
|
||
```
|
||
a change is made a human in a session, or an agent given work
|
||
│
|
||
▼
|
||
a pull request appears
|
||
│
|
||
▼
|
||
a human reads the diff and merges ← the gate
|
||
│
|
||
▼
|
||
the coordinator delivers to the real nodes
|
||
│
|
||
▼
|
||
production reports whether it worked ← the test
|
||
```
|
||
|
||
**The gate is a human reading a diff, and the test is production.** That is workable at a
|
||
change a day and it is the constraint at ten. For autonomous work it is worse than a
|
||
constraint: an agent's output arrives as a diff that *looks* right, carrying no evidence
|
||
that it runs, and the only reviewer is the condition `00-META/context.md` calls mandatory
|
||
— *human agents are few, often one, and usually asleep.*
|
||
|
||
The missing step goes between the pull request and the merge:
|
||
|
||
```
|
||
a pull request appears
|
||
│
|
||
▼
|
||
the coordinator delivers the branch to a SCENARIO mesh ← the missing step
|
||
and runs the same stages, ending in verify
|
||
│
|
||
▼
|
||
the verdict is attached to the pull request
|
||
│
|
||
▼
|
||
a human merges evidence rather than hope
|
||
│
|
||
▼
|
||
the coordinator delivers to the real nodes — same verify, now loud
|
||
```
|
||
|
||
### One pipeline, two targets
|
||
|
||
| target | triggered by | what a failure means |
|
||
|---|---|---|
|
||
| a scenario mesh | a branch, or a pull request | the change is not finished; it should not merge |
|
||
| the real mesh | a merge | a red delivery, loudly, before anything is built on it |
|
||
|
||
Same coordinator, same cascade, same stages, same verification. **Only the target mesh
|
||
differs.** This is the through-line of the whole design — one verification statement with two
|
||
jobs, one runner with two callers, one pipeline with two targets. Nothing forks, so nothing
|
||
drifts.
|
||
|
||
### What it demands
|
||
|
||
- **The coordinator must accept a target mesh.** Today a pipeline's targets are derived: the
|
||
nodes that have the module assigned. It needs to be able to run the same pipeline against
|
||
a mesh named by the request instead.
|
||
- **Scenarios must be concurrent and cheap.** Several agents working means several scenarios
|
||
at once, each needing its own network and nodes. This is affordable with system containers
|
||
and would not be with virtual machines — the unit choice is what makes the gate possible
|
||
at all.
|
||
- **The gate is only as good as the verification behind it.** A module with no assertions
|
||
gets a weak gate: delivery succeeded, nothing checked. So **verification coverage becomes
|
||
the number that matters**, and it starts at approximately zero.
|
||
- **It has to be fast enough to wait for.** A gate an agent cannot wait on is a report nobody
|
||
reads.
|
||
|
||
---
|
||
|
||
## The coordinator drives it
|
||
|
||
The temptation is to build a framework that delivers a module and checks it. That would be a
|
||
**second delivery path**, and a second delivery path is worthless — the faults worth catching
|
||
live in the real one.
|
||
|
||
So the rule is not "no new components". It is: **nothing new drives delivery.** A scenario is
|
||
a complete mesh with its own coordinator. Push the working tree to that mesh's forge; its
|
||
coordinator does exactly what a coordinator does — works out the cascade, dispatches build,
|
||
install, configure, start, and then **verify** — and its meshware executes on its nodes. The
|
||
result of that pipeline *is* the verdict.
|
||
|
||
A **test runner** is a legitimate component within that, used *by* the coordinator rather
|
||
than instead of it. Two jobs plausibly belong to it, and their boundary is worth settling
|
||
before either is built:
|
||
|
||
- **scenario lifecycle** — materialise the mesh a test needs, restore it to a snapshot, tear
|
||
it down. Something must do this before a coordinator exists to drive anything.
|
||
- **assertion execution** — give verification more than "run a script and check the exit
|
||
code": setup and teardown, timeouts, retry-until-true for things that settle, and results
|
||
structured enough to report rather than grep.
|
||
|
||
The line to hold is the pipeline itself. A runner that stands up a mesh and executes
|
||
assertions is a component. A runner that decides what to build, in what order, and ships it
|
||
to a node is a fork of the coordinator.
|
||
|
||
### It has two callers, and they want different things
|
||
|
||
The runner serves **the coordinator** and **a person developing the mesh**, and its interface
|
||
has to suit both:
|
||
|
||
| caller | wants |
|
||
|---|---|
|
||
| the coordinator | non-interactive, structured results it can record against a pipeline, a clean teardown, no prompts and no colour |
|
||
| someone working on HAL | readable output, the failing mesh **left standing** to open a shell into, and a way to re-run one assertion without repeating the whole delivery |
|
||
|
||
Hence at least two verbs: one that runs to a verdict and tears down, and one that stands a
|
||
scenario up and leaves it there. The second is how a developer works *inside* a mesh —
|
||
which is the thing the current host-borrowing tooling is really for, and the reason this
|
||
replaces it rather than sitting beside it.
|
||
|
||
That the same runner serves both is deliberate, and it is the same argument as the module's
|
||
own assertions serving both development and delivery: **one statement, two jobs.** Anything
|
||
that only the developer path can do is a divergence, and it will drift.
|
||
|
||
```
|
||
edit a module in the working tree
|
||
│
|
||
▼
|
||
push to the scenario's forge
|
||
│
|
||
▼
|
||
the scenario's COORDINATOR runs a pipeline ← existing machinery, unchanged
|
||
│
|
||
├── cascade: which modules are affected
|
||
├── build → install → configure → start
|
||
└── verify: the module's own assertions ← existing stage, dispatched today
|
||
│
|
||
▼
|
||
the pipeline result is the verdict
|
||
```
|
||
|
||
This is the same property `00-META/mission.md` asks for: *the mesh's own components ship
|
||
through the same machinery as anything else it carries — if they need an exception, the
|
||
machinery is not finished.* A test that needed its own delivery path would be that exception.
|
||
|
||
**It tests the working tree**, because the forge is inside the scenario. A loop that requires
|
||
pushing to production and waiting is not a loop. Real path, local code, nothing shared with
|
||
production.
|
||
|
||
---
|
||
|
||
## What it catches
|
||
|
||
This list is the specification. These are the ways a module change fails today, and each one
|
||
currently reaches production or wastes a pipeline run:
|
||
|
||
| failure | why it survives today |
|
||
|---|---|
|
||
| a file never reached the artifact | absence and "declares nothing here" are indistinguishable, so it ships green |
|
||
| a migration compiled to nothing, or never ran | the stage reports success when there is nothing to run |
|
||
| the manifest is wrong — bad package list, wrong paths | validated shallowly, if at all |
|
||
| a capability was never provisioned, or its credential never arrived | delivery reports transport, not effect |
|
||
| an environment value was not generated | the module starts and reads a default |
|
||
| the service did not come up, or came up and crashed | nothing asserts it is still running a minute later |
|
||
| the dependency cascade did not include the module | a green pipeline that rebuilt the wrong set |
|
||
| it works on a fresh install but breaks on upgrade | almost never exercised — see below |
|
||
| it works on one node and not another | only one node is ever tried |
|
||
|
||
A test that only proves "the pipeline went green" reproduces the exact blindness this is
|
||
meant to remove.
|
||
|
||
---
|
||
|
||
## Fresh install and upgrade are different tests
|
||
|
||
The most common shape of a module bug is: works from scratch, breaks on the machine that
|
||
already had the previous version. Existing state outranks new state, a file is added but
|
||
never removed, a migration assumes a column that an older node lacks.
|
||
|
||
Snapshots make both cheap, so both are default:
|
||
|
||
- **fresh** — restore a mesh that has never seen the module, deliver, assert
|
||
- **upgrade** — restore a mesh running the *previous released version*, deliver the working
|
||
tree over it, assert
|
||
|
||
Same assertions, different starting state. A module that passes one and fails the other is
|
||
the normal case, not an edge case.
|
||
|
||
---
|
||
|
||
## A module carries its own assertions
|
||
|
||
**A module states what must be true about it, and it states it once.** That statement is the
|
||
module's verification — the stage the coordinator already dispatches at the end of every
|
||
delivery, with a working handler, implemented today by essentially nothing.
|
||
|
||
It asserts **outcomes**, never that a step ran: the unit is active and still active shortly
|
||
after, the schema has the column, the name resolves, the credential authenticates, the file
|
||
on the node holds what the mesh believes it holds, the endpoint answers.
|
||
|
||
The same statement serves both places, which is the point:
|
||
|
||
| where it runs | what a failure means |
|
||
|---|---|
|
||
| in a scenario, during development | your change is not finished — cheap, fast, nobody affected |
|
||
| on delivery to production | the deploy is red, loudly, before anyone builds on it |
|
||
|
||
**This is what finally makes verification worth writing.** Today it can only ever cost you a
|
||
deploy, which is precisely why almost no module has one. Give it a second job — telling a
|
||
developer whether their change works — and writing it stops being an act of discipline and
|
||
starts being the fastest way to get an answer.
|
||
|
||
Where a module has no verification yet, the coordinator asserts the generic invariants it can
|
||
know on its own: the artifact contained what the manifest declared, the migrations that were
|
||
pending ran, the declared capabilities were provisioned, the declared services are up.
|
||
|
||
---
|
||
|
||
## The mesh shape is a parameter
|
||
|
||
A test declares the mesh it needs, and the default is the smallest one that can exercise the
|
||
module:
|
||
|
||
```yaml
|
||
module: a-web-service
|
||
mesh:
|
||
my-cool-node: { role: published, publishes: my-cool-node.com }
|
||
assert:
|
||
- https://my-cool-node.com answers 200
|
||
- the certificate presented is valid for that name
|
||
```
|
||
|
||
One node, because one node is enough to answer that question. Standing up a mesh to test one
|
||
module is the same mistake as starting the application to test a function.
|
||
|
||
More nodes when the module's behaviour is *between* nodes:
|
||
|
||
```yaml
|
||
module: a-module-requiring-a-database
|
||
mesh:
|
||
store: { role: anchor }
|
||
consumer-a: { role: resident }
|
||
consumer-b: { role: mobile }
|
||
assert:
|
||
- both consumers authenticate against the database
|
||
- after redeploying the provider, both still do
|
||
```
|
||
|
||
Node names and domains in a test are **invented**. The mesh under test is whatever the test
|
||
says it is — which is also how this document stays free of any particular installation.
|
||
|
||
### Scale, when scale is the question
|
||
|
||
Size is chosen by what is being asked, and ranges from one node to twenty or more.
|
||
|
||
| size | what only this size answers |
|
||
|---|---|
|
||
| one | does it install, migrate, provision and run at all — the fastest loop |
|
||
| two–three | anything *between* nodes: delivery, provisioning, rotation, absence |
|
||
| ten–twenty | whether a fan-out reaches *every* node, whether the cascade converges, whether something is quietly quadratic |
|
||
|
||
A fan-out reaching three of four nodes reads as a flake; at twenty it is a diagnosis, and
|
||
which nodes were missed tells you why. **This is what the unit choice below bought** — twenty
|
||
virtual machines do not fit on a workstation, and twenty system containers do.
|
||
|
||
---
|
||
|
||
## Two kinds of test
|
||
|
||
**Module tests** are the daily case and the reason this exists: does my change work, end to
|
||
end.
|
||
|
||
**Mesh tests** use the same machinery to ask whether the mesh itself behaves — that a
|
||
credential rotation reaches every consumer, that delivery to an absent node is reported as
|
||
pending rather than done, that a returning node catches up. These are fewer and change
|
||
rarely, but they are where the known production faults get encoded so they stay fixed.
|
||
|
||
The known faults become mesh tests that fail today. That is the Phase 0 checkpoint.
|
||
|
||
---
|
||
|
||
## The substrate
|
||
|
||
### A node is a system container
|
||
|
||
An OS userspace with its own init, its own network interface, its own filesystem, sharing
|
||
the host kernel.
|
||
|
||
**A node's job is to run containers**, so modelling a node *as* an application container
|
||
inverts the thing being modelled: it forces nested containers through a privileged daemon or
|
||
a shared socket, and a shared socket makes isolation between nodes cosmetic. A system
|
||
container has no such problem — init runs as PID 1, so units and timers work as written;
|
||
containers nest properly, so module stacks run as they do anywhere. **Module code and mesh
|
||
code both run unmodified**, which is the property that makes a verdict trustworthy. Anything
|
||
needing a special case locally is a divergence that will hide a fault.
|
||
|
||
Boot is around a second and snapshots are cheap, which is what makes this an inner loop
|
||
rather than an errand.
|
||
|
||
**Any node can be a full virtual machine instead**, through the same tooling and the same
|
||
test file — when a question needs a kernel to answer it, or when the point is that nodes are
|
||
*not* identical.
|
||
|
||
### The network
|
||
|
||
Two segments and an overlay, because some module behaviour is only visible across a real
|
||
network boundary:
|
||
|
||
- **wan** — a published node holds an address here, and an authoritative resolver maps its
|
||
name to it, so a public touchpoint is real enough to exercise routing, virtual hosts and
|
||
certificates
|
||
- **local** — behind translation, as a home network is
|
||
- **the overlay** — the mechanism production uses; the mesh addresses peers by mesh name and
|
||
never learns which segment anyone is on
|
||
|
||
A node can be moved between segments or detached entirely, mid-test.
|
||
|
||
### What is not real
|
||
|
||
- **the model provider** — thinking is stubbed, so tests cost nothing to run
|
||
- **the public internet** — a bridge, with an authoritative resolver rather than delegation
|
||
- **the public certificate authority** — the lab runs **its own ACME issuer** on the public
|
||
segment, so issuance, challenge and renewal are genuinely exercised rather than stubbed.
|
||
Internal names keep the mesh CA, so the lab preserves production's two-authority split
|
||
rather than collapsing it into one.
|
||
|
||
Everything a node itself does is real, because a node is a real machine.
|
||
|
||
---
|
||
|
||
## Consequences
|
||
|
||
**Bringing a node into being is part of the framework.** A test creates its own nodes — one
|
||
for the smallest, twenty for the largest — repeatably, unattended, and cheaply enough to do
|
||
it twenty times in a row. Those are the constraints a real mesh wants, so the mechanism the
|
||
runner needs is the one the mesh should keep.
|
||
|
||
**Module verification becomes worth writing**, because it is the thing that gives a
|
||
developer a verdict, not just a stricter deploy.
|
||
|
||
**Host-borrowing ends.** Today's tooling starts providers on the host's own init system and
|
||
reads credentials from host paths, because there is nowhere else to put a mesh. Once there
|
||
is, a workstation stops being collateral.
|
||
|
||
**The supervision question stops gating anything.**
|
||
[`01-RESEARCH/003-service-supervision`](../../01-RESEARCH/003-service-supervision/analysis.md)
|
||
remains open on its own merits — and once this exists, its options are cheap to try rather
|
||
than expensive to argue about.
|
||
|
||
## Deliberately not decided
|
||
|
||
**Whether the lab verdict is a workflow guard or an advisory check on the pull request.** Open,
|
||
and deliberately trivial — a policy detail, changeable in an afternoon, not an architectural
|
||
choice. Recorded so it is not mistaken for an oversight.
|