The lab was designed around a module under test, with a scenario being a complete mesh — forge, coordinator, cascade, verify. That is unusable for building the new mesh, because all four are tier 2 and do not exist yet. And research 009 had the sequence backwards. It placed the lab at phase B as verification of tiers already built, but tier 0 is the component that takes over a machine's packages, services and network. It cannot be developed against a machine anyone needs. The lab has to exist before the thing it will test. ADR 0029 splits scenarios into two classes. The bootstrap scenario is virtual machines, the host binary and a pinned bundle, with the verdict coming from what the host reports about the state it reconciled. The full scenario is the designed one. The first is a strict subset of the second — same virtualisation, same networking, same lifecycle, stopping before a control plane exists — so the second is reached by addition rather than rework. The consequence worth having: raising a node from nothing stops being the least-exercised path in the system and becomes the inner development loop. It also settles the runner's two jobs. Scenario lifecycle is needed immediately, because something must materialise and reset a mesh before anything can be written against it. Assertion execution waits for the full scenario. Corrects a stale claim in the design while amending it: it argued scenarios were affordable with system containers and would not be with virtual machines. ADR 0016 superseded that reasoning and the text had not followed. Issue 007: the lab's first requirement is installed and unusable. The virtualisation package is present and explicitly installed; both units are disabled, the operator is in no group, and the client reports the server unreachable. Not issue 001 again — that is an install failing while reporting success. This is an install succeeding when success was not the point. A package is files; a capability is a running service and an identity permitted to reach it, and the module model has no vocabulary for the second.
03-DESIGN / 01-to-be
The mesh being built toward. Every statement here traces to a record in
02-DECISIONS/; nothing arrives by drafting.
A document here describes an intention. What currently runs is in
00-as-is/, and the two are never merged — when something ships, the as-is
document is written and this one's status becomes implemented.
| Document | Covers | Rests on |
|---|---|---|
00-work-breakdown.md |
How the decomposition gets built, in what order, and where a human must look | ADR 0015 |
01-end-to-end-testing.md |
The lab: a real mesh a change can be run against before it reaches nodes | ADR 0016 |
Not yet written
- The eight bounded contexts. ADR 0015 decides the decomposition; the per-context specifications do not exist yet. The work breakdown says in what order they are needed.
- Domain grouping outside the core. ADR 0017 settles the principle and explicitly does not settle the domain list. That is a research effort, not a design document, until it concludes.