jschoubben 4151c28927 The builder takes work over the broker, and what is still missing
A build is work, not state, and that is why it does not travel as a
declaration: as one it would either rebuild on every reconcile or carry
"and I already did this", which is state about an event rather than about
a machine. So it has its own queue and the answer comes back correlated.

Three properties recorded because they are decisions: acknowledge only
once the answer is away, one build at a time, and a failure is a result
rather than silence.

And the board page is corrected. A build result today is answered to
whoever asked and kept nowhere, so a builds view has nothing to read. A
record of past builds is the missing piece, not the builder.
2026-08-30 04:06:42 +02:00
..

03-DESIGN

The authoritative specification. Implementation is built against what is written here.

Two layers

Folder What it is
00-as-is/ The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again.
01-to-be/ The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/.

They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.

When a to-be design ships, it does not move. Its as-is counterpart is written or updated, the to-be document's status becomes implemented, and both stand — one describing what runs, the other recording what was intended. Deleting the intention loses the reasoning, which is the expensive half.

Frontmatter

Every design document (not the READMEs) carries:

---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: []                 # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD      # date of the last status change, not of text edits
decisions: []            # 02-DECISIONS/ records this document rests on
---

For an as-is document, status: implemented is the normal state — it describes something that runs — and code: names where that implementation lives.

Status changes when implementation state changes, never because design text was edited. An implemented claim must be defensible from the owning repository's main branch, not from intent. If it cannot be checked, it is in-progress.

Cross-cutting views are generated from this frontmatter by the hq-status skill and never written to disk.

What belongs here

Functional analysis, architectural description, and specification — prose and diagrams only, no code. A manifest field may be named; a manifest may not be pasted. A document enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/ and the research that produced it is closed.

Subfolders are encouraged where a layer grows enough to need them.