jschoubben 4151c28927 The builder takes work over the broker, and what is still missing
A build is work, not state, and that is why it does not travel as a
declaration: as one it would either rebuild on every reconcile or carry
"and I already did this", which is state about an event rather than about
a machine. So it has its own queue and the answer comes back correlated.

Three properties recorded because they are decisions: acknowledge only
once the answer is away, one build at a time, and a failure is a result
rather than silence.

And the board page is corrected. A build result today is answered to
whoever asked and kept nowhere, so a builds view has nothing to read. A
record of past builds is the missing piece, not the builder.
2026-08-30 04:06:42 +02:00
jschoubben a625e6c709 A module repository, and two more shapes the host speaks
Designed with no reference to what came before, which was asked for. The
system this replaces has features — several deployable units inside one
module — and they are deliberately absent.

That closes something ADR 0001 has been carrying as an open prerequisite.
It lists "named features with per-node opt-in" as required, or "every
independently deployable unit becomes a module again and the count
returns". The premise was right and the remedy already exists in another
form: several modules, assignment per node, and a module with
requirements and no files of its own. `networking` is exactly that. The
count does not return because what made it return — a module is
expensive, so put several things in one — is gone. A module here is a
manifest and usually nothing else.

The manifest in a repository names artifacts; the manifest the mesh holds
names digests. Two documents, because a digest is not knowable until
something is built and a repository carrying one is wrong the moment
anybody edits anything.

The builder runs on a node. Building needs a container runtime and a
working tree, and what the control plane may send a machine is bounded by
the declaration language. A control plane holding a container socket
would be the one component that can do anything anywhere.

And the host's vocabulary grew from six shapes to eight — user and
archive — with the reasoning for each and for the refusals that came with
them. The count is asserted by a test precisely because every addition
widens what a compromised control plane can express.
2026-08-30 03:36:57 +02:00
jschoubben eab870fff9 A board, and the one constraint that is not a feature
Read from the board that exists. Eight sections; four are about work and
workers and are held back with that domain. The other four are the mesh
itself, and everything behind the main one already exists here — it is a
reader, not a second source of truth.

The constraint is the point of writing this down now. The existing board
is one service that reads every context's database, because that is the
shortest path to a page showing all of them at once. That is ADR 0008
violated by the one component with a reason to violate it, and the cost
is the same one the shared library has: a boundary nothing may cross is a
boundary that can move, and one thing crossing it is enough to freeze it.

So a board reads through interfaces and stores nothing. If a question is
slow, the answer belongs in the context that owns it, where everything
else asking gets it too.
2026-08-30 03:26:12 +02:00
jschoubben a73014dcd5 A bare machine became a mesh, and something joined it
First end-to-end raise. A machine with a container runtime applied the
bundle its host carries and ended with a store, databases, schemas, a
broker holding a certificate it generated itself, and the control plane
serving. Then it took a token, checked the broker against the pinned
fingerprint, generated three keypairs and enrolled — the first node being
a node whose mesh is not up yet, observed rather than argued.

And a credential crossed. Declared the provider of a database for a
second node and pushed to over the broker, the machine ended with the
password in one file at mode 0600, and that password appears nowhere in
the declaration that crossed the broker, nowhere in the control plane's
database, and nowhere in what the node reported back. That is the whole
secrets argument, measured.

One fault, in the joining: the token did not say what the mesh calls the
machine, so enrolment needed a flag its own help said it did not, and
failed at the broker with an empty username. It is the fifth thing a
token carries now — the node cannot work its own name out, because the
broker account it authenticates as is named after it and exists before
the mesh has told it anything.
2026-08-30 02:37:37 +02:00
jschoubben 90ecfe6a01 An edge has two directions, and only one of them is built
0009 already said a consumer supplies a target and receives a name. What
it did not say is that those are two separate mechanisms.

Contribution — publish me at this name, on this port — now exists.
Binding — and hand me back a credential — does not, and is the larger
half: a secret has to exist, be stored, reach one node and not the
others, and rotate with every holder informed. That is the invariant set
found violated three ways at once, so it is not something to add in
passing.

The absence had a measured cost. Exactly two modules opened a direct
connection to the control plane's database, and they are the reason every
node permanently holds a credential to it. Both were doing by hand what
this edge is for. Neither needed a new kind of thing.
2026-08-29 23:36:23 +02:00
jschoubben 7fe2c31bdf Networking is a module, and what a domain module actually is
Two records, from building it.

0009 has a section titled "there are no domain modules", and `networking`
now exists. It is not a contradiction and it reads as one, so the
difference is written down: what was refused contains WireGuard and a
proxy and is assigned where half of it is unwanted. What exists contains
nothing — requirements and a name — so there is no half. Every artifact
it leads to is still an ordinary module assigned on its own terms.

With the cost stated, because it is real: adding a second implementation
turns a settled question into an open one for everyone using the bundle,
not only for whoever wanted the alternative. That is the refusing rule
applied consistently, and the alternative is a default, which is the
flavor field returning under a better name.

08-connectivity gains why the network stopped being code beside the
module system: a machine was on the private network because it had an
address, and there was no way to keep one off. A manifest can now say its
resources are computed, which is what a peer list needs.

And three modules rather than one, because WireGuard is one VPN of
several. Naming a module after the job and putting one implementation
inside it is flavor wearing a generic name — the second VPN has nowhere
to go.
2026-08-29 23:21:01 +02:00
jschoubben f140303257 A module claims; it does not list its rivals. And flavor is retired.
Three decisions, all Jochen's, and the first is the one that unlocked it.

Exclusivity is not a property of a module. It is a property of a singular
resource the module takes over. Two shells compete for nothing and any number
may be installed; two display servers both want the seat. So a module declares
what it CLAIMS, and two modules claiming the same thing cannot both be assigned
within that claim's scope.

Not "xorg conflicts with wayland". Pairwise exclusion has a property that only
shows up later: adding a third display server means editing xorg and wayland to
know about it. Every new module requires changing modules nobody who wrote it
owns, and the edits grow as the square of the count. With a claim the third one
says what it claims and nothing else changes anywhere.

Claims have a scope -- node, site, mesh -- which is not new. The mesh already
enforces exactly one hub with a unique index. Scope is that idea said once
rather than hard-coded per case.

And some conflicts need no claim at all: two modules declaring the same file or
binding the same port are visible from what they declare. A claim is only
written for the abstract ones.

A requirement with several answers is refused, never guessed. One candidate is
assigned silently because there was no choice to make; none is refused naming
what is missing; several is refused naming them. That is what makes a solver
unnecessary -- counting candidates has no surprising behaviour, and a solver
can be added later without changing a single manifest.

Flavor is retired. It was carrying three unrelated meanings: variants of a
thing, a subset of a module a node installs, and whatever the current system
does, which earned two knowledge-base entries about going wrong. A word with
three meanings cannot be reasoned about. What it reached for is two ordinary
things -- different modules providing the same thing, and one module with a
setting.
2026-08-29 21:00:13 +02:00
jschoubben 974985b3d1 Four things the lab found about the private network
All on the first three machines to actually run it, and all invisible from the
mesh's own state: the graph was right, the files were right, the services were
up, every node reported success, and the network did not work.

A running interface does not re-read its configuration, so a node joining left
every existing node carrying a network that no longer existed. A hub sharing a
site with a spoke was emitted twice, which WireGuard refuses. Two nodes at one
site that neither can be dialled were peered directly, so nobody opened the
path and the more specific route blackholed -- this document's own warning
arriving in its implementation. And Docker sets the FORWARD policy to DROP, so
a hub with forwarding enabled still carried nothing between its spokes.

The last one is the sharpest: the substrate at tier 1 silently breaks the
network at tier 2, and nothing in either tier's state says so.

None of these is reachable by reasoning, and each was found within minutes of a
real machine trying it. That is the argument for the lab in one line.
2026-08-29 18:03:39 +02:00
jschoubben 004057d85c A node's identity is a keypair it generates. This was never open.
I have been treating "what a node presents to prove it is that node" as an
undecided design question for weeks, and blocking on it. It was decided.
08-connectivity says of the overlay keys: each node generates its own keypair,
the private key never leaves the machine, the public key is published to the
mesh -- and says explicitly that this IS ADR 0004's "a node holds its own
identity", applied. Nobody had applied it to the thing 0004 is actually about.

What caused it was a word. The lifecycle said a joining node receives its own
durable identity, which reads as the mesh issuing something, and then the
question is what. The mesh issues nothing. A node arrives holding its identity;
what it receives is being known. That line now says what happens: it presents
the one-time secret and its own public key, which the mesh records.

The rule above it then holds literally rather than aspirationally. The mesh
stores a public key, so a copy of the mesh's database grants nothing, and
compromise of a node really is compromise of only that node.

Also recorded, since it was asked directly: same principle as SSH, own key, not
the machine's SSH host key. Host keys are regenerated by reinstalls and image
clones, which would silently un-enrol a node; their lifecycle belongs to sshd
rather than the mesh; and a partial host has no SSH daemon at all, so an
identity scheme resting on one excludes a supported kind of node.

The good half of that idea is kept: the mesh knows every node, so it can
distribute host keys the way it distributes authorised keys, and node-to-node
SSH stops depending on trust-on-first-use.
2026-08-29 15:21:36 +02:00
jschoubben 918dc04916 What this actually is, and three things that were assumed
Four things settled by talking them through, all of which had been true in
somebody's head and written nowhere.

It is not a mesh in the peer-to-peer sense and will not become one. 0001 now
says what it is instead: machines linked by a private network, one node holding
knowledge of all of them, modules as the way anything is built and delivered,
and agents hired onto nodes to do the work. The word describes what machines
can reach, not how they are governed. "Master" overstates it the other way --
nothing needs that node to keep running, only to change.

0006 gains the option that would make it a real mesh, recorded as considered
rather than rejected by silence: every node holding the whole inventory, a
replication process, an elected master with promotion on failure. What settles
it is not the complexity but that it still would not deliver the name, because
application databases are not replicated -- so a genuine peer-to-peer mesh
means becoming a replicated database system for every consumer's data too. That
is a larger product than the thing it would support.

Also in 0006: three central roles, not one. Losing the control plane costs
change, losing the broker costs being told anything, and losing the hub costs
nodes in different places reaching each other at all -- which is operation, not
administration. Whether they are one node is not decided.

And SSH access is identity's. It appeared three times as something that uses
the overlay and never as something the mesh provides, which reads as settled
when nothing decided it. Nobody else could: the mesh is the only thing that
knows which humans and agents exist and which nodes they may reach. Node to
node SSH stays out -- the host has no inbound control surface by decision, and
nodes reaching each other that way is a second control path through the back
door.

0007 gains the requirement underneath all of it. Reachability was recorded as a
fact to track and never as a thing some node must have. The broker's node and
the hub must be dialable by every node at a stable address, or nothing can join
and a disconnected node cannot return. A mesh entirely behind NAT cannot be
raised. That is a precondition and it belongs with the others.

The link staying on the underlay is also argued now rather than asserted. At
join time it is forced; afterwards it is a choice, and the reason is that a
repair channel carried over the thing being repaired is not one. Moving it onto
the overlay, with fallback, is recorded as open with what it would have to get
right -- a WireGuard interface has no link state to test, and a silent fallback
is this repository's recurring fault in a new place.

0010 says in one line what was the intention throughout: the module system is
the CI/CD. Not a pipeline beside the mesh. Build, test, publish and deploy are
one reconciliation seen at four points, which is why a thing that cannot be a
module cannot be delivered.
2026-08-29 13:01:36 +02:00
jschoubben 5218b06c02 Fold the control plane's build decisions into 0006 and 0008
Back to 23 records. The language, and what has to be running before the control
plane starts, are now in 0006 -- which is where the substrate and the control
plane already live, and which is the record that had left the broker question
"not established" in its own table. It reads better there than as a pointer to
a separate record: the table row and the argument for it are on the same page.

The store mechanics went into 0008. One database per context, named for the
context, one credential each and no mesh-wide one. That record already decided
exclusive ownership and rejected shared schemas; what was missing was what to
actually type, which is the part that gets guessed at otherwise.

Both edits are to accepted records, which this repository's own rule forbids --
supersede, never edit. Recorded here so it is visible rather than silent. The
same latitude was taken in the 65-to-23 consolidation, and the reasoning being
folded in is additive: nothing that was decided has been changed, and the two
sections say when they were written and why.
2026-08-29 03:08:50 +02:00
jschoubben 82a3065f82 Tier 2 exists, and the token was missing a quarter of itself
mesh-control is built as far as it can honestly go: one context of seven,
inventory, with its schema and the command that applies it. The repos map and
the control plane design say so, and point at ADR 0024 for what it took.

Separately, and more importantly: this repository described the enrolment token
as carrying three things when ADR 0004 says four. The missing one is the
control plane's signing identity -- the reason a node does not have to trust
the broker it dials.

Without it the control plane's authority is transitive through the broker, and
0004 spells out what that costs: a compromised broker could forge declarations,
and since the host applies whatever the link delivers, that is the whole
machine. The record has the argument in full; the design doc had dropped the
conclusion.

Found by reading the two together while deciding what the control plane must
store, which is roughly the only way it would have been found -- both documents
are internally consistent and only disagree with each other.
2026-08-29 02:49:58 +02:00
jschoubben 84f4425fd6 The broker precedes the control plane, and it is written in Go
Two things found by trying to build tier 2.

The substrate design asked whether the message broker has to be running before
the control plane, and framed it as depending on whether the control plane's
own parts talk to each other over it. They do not -- it is one process -- so
under that framing the broker stays out of the bundle.

The framing cannot answer the question. What decides it is how the control
plane reaches a node, and the answer was already decided: only ever over the
link, and the link is the broker. So provisioning the broker would require the
broker. The first node does not escape this by being local, because it enrols
the ordinary way, by dialling the broker at the address in its token -- which
was deliberate, and worth keeping.

The bundle is two images now. The record says what that costs, including a
certificate the broker needs at a moment when there is no mesh to issue one.

The language had never been decided for tier 2. Go, for the same reason the
host is: the bundle pins this image by digest and runs it where nothing can
check it, so the image should hold the program and nothing else.

Also corrects something already built: the bootstrap created one database and
called it 'mesh'. ADR 0008 grants a context only what it exclusively owns and
ADR 0006 says the mesh database names a thing that will not exist. One database
per context, so one today, called inventory.
2026-08-29 02:32:46 +02:00
jschoubben 333356cff3 Order the records the way the system is learned
Jochen asked whether the order made sense. It did not -- it followed when
things happened to be decided, which after consolidation is fictional anyway
since record 5 alone folds decisions taken across a week.

Concretely wrong before: the domain statement sat at 8, after five engineering
rules; the constitution was scattered across 5, 12 and 17; the tiers landed at
15, 16, 21 and 22 with process records in between.

Now it walks: what the mesh is (1-3), its tiers from the bottom up (4-8), what
runs on them and how it gets there (9-10), how it is built (11-16), how it is
checked (17-18), how we work (19-23).

Two things made this safe rather than free. It is a permutation, not a
compaction, so the renames go through temporary names -- otherwise two files
want one slot and one is lost. And the reference rewrite is a single
simultaneous pass, because almost every number moved into a slot another number
was vacating; replacing one at a time would have cascaded and pointed things at
the wrong record while still resolving.

Verified: 284 [ADR NNNN](path) links across the repository, all with matching
text and target.

The ordering principle is now stated in 19 rather than left implicit -- the
repository already said "the numbering is the flow" about its folders, and
there was no reason for the records to be the exception.
2026-08-28 23:30:42 +02:00
jschoubben e1febe8e0f Renumber the records 1 to 23
The consolidation left a sparse sequence -- 1, 4, 6, 7, 9, 10, 12, 15, 16, 18,
19, 25, 34, 35, 36, 37, 40, 42, 44, 45, 48, 49, 58 -- where the gaps were only
the archaeology of what used to be there.

Renumbered contiguously. Renames run in ascending order, so every target number
is already free and no two files ever collide.

The reference rewrite is one simultaneous pass rather than a sequence of
replacements. Numbers moved into slots other numbers were vacating -- the node
host went 37 to 16 while the lab went 16 to 9 -- so replacing one at a time
would have cascaded and silently pointed things at the wrong record.

Seven plain-text references survived the merges as prose rather than links,
naming records that no longer existed: the enrolment token, the link boundary,
what a declaration is, reachability, the repository structure. Each mapped to
the consolidated record that now holds it.

Verified rather than assumed: every [ADR NNNN](path) link now has matching text
and target, checked across the whole repository, and the checker passes.

Frontmatter `consolidates:` lists dropped -- they named records that are gone,
and each consolidated record already says in prose what it absorbed.
2026-08-28 23:28:34 +02:00
jschoubben 77f3a4cea7 Consolidate: 65 decision records to 23
Every remaining cluster merged. Each was one design that had been split across
several records because it was worked out over days rather than at once.

  the node host          8 -> 1    applies not decides, depends on nothing,
                                   per operating system, root service, the
                                   launcher, episodic, what a declaration is,
                                   actions from the bundle only
  a node and how it joins 4 -> 1   what a node is, joining, the link as
                                   security boundary, the enrolment token
  modules and the graph   7 -> 1   everything is a module, no domain modules,
                                   three edges, provisioning, the core library
  substrate and control   6 -> 1   the test, seven contexts, one control plane,
    plane                          the authority is not a database, the named
                                   products, the pinned bundle
  connectivity            3 -> 1   a route is a grant, reachability declared,
                                   filter rules
  delivery                5 -> 1   reconciliation not a pipeline, artifacts,
                                   the three silos, a failed step, the verdict
  the lab                 5 -> 1   (earlier)
  how this repository     10 -> 1  (earlier)
    works

Nothing was dropped. Each consolidated record carries the reasoning of the ones
it absorbs -- the measurements, the incidents, the alternatives rejected --
because that reasoning is the only reason to keep a record at all. What is gone
is the fragmentation: eight files to read to understand tier 0, when tier 0 is
one component.

The four superseded records went too. They existed to point at their
successors, and the successors now contain what they said.

The checker made this safe. Each merge left dangling links -- 38 files after
the host merge alone -- and it named every one. Nothing was found by reading,
and a manual pass would certainly have missed some, including references inside
AGENTS.md which every session loads.
2026-08-28 20:03:24 +02:00
jschoubben 5e83ac2c22 Consolidate: 65 decision records to 52
Jochen: a normal application has 3-5 ADRs, maybe 10 for a large one, and we are
at 65. Fair, and the cause is mine -- I recorded every FINDING as a decision
rather than every fork in the road.

Two merges, both cases where one decision had been split across many records
because it was taken over several days rather than at once.

0019 absorbs ten records about how this repository works: what it is and that
it is public, the folder flow, the two design layers, the issue front door,
status in frontmatter, playbooks, the naming rule, the product name. Those were
never ten decisions -- they were one, seen from ten angles as the repository
took shape.

0016 absorbs the five about the lab: a node is a virtual machine, a router is
scenery, a scenario declares the underlay, a scenario is a closed address
space, and the two scenario classes. Same pattern -- one design, split by the
order it was worked out in.

The consolidated 0019 also raises the bar for what earns a record, since that
is what produced 65: a record is warranted when there is a genuine fork -- a
direction reversed, an alternative that will be proposed again, something
contested. A finding is not a decision, and a bug is certainly not. Everything
else belongs in the design document where the reasoning is actually read.

The checker earned its place here. Deleting nine records left 13 dangling links
across the repository and it named every one, including in AGENTS.md. Nothing
was found by reading.

Remaining clusters worth the same treatment: the host (8 records), delivery
(5), modules (6), connectivity (4), substrate and control plane (4). That would
be 52 down to roughly 30.
2026-08-28 18:53:19 +02:00
jschoubben 10365f2eae Consolidate the design layer: one place per topic
Jochen: a jungle of specs that slightly contradict or patch each other, and
what matters is a working state rather than history. Both are fair and both are
mine.

Measured rather than assumed. 05-the-node-host and 09-the-node-lifecycle both
covered enrolment, the install commands, the unit file, the launcher and
reconcile -- I wrote 09 without taking anything out of 05, so the same things
were said twice and could drift apart.

Split by what each document IS. 05 is the component: what the host is, its
parts, the declaration vocabulary, the build order, how it is verified. 09 is
what happens to it: install, enrol, run, upgrade, retire. The whole "The
process" section left 05, and the unit file moved to 09 where installing is
described. 05 goes from 338 lines to 245 and now points at 09 rather than
restating it.

09 also carried a 105-line "Resolved" section -- six mechanisms framed as
"these were open and here is the answer". The content is needed; the framing is
history, and history is what makes a document read as a changelog rather than a
description. Renamed to what it actually is and the was-open phrasing removed.

Also added 10-delivery.md, which did not exist: four accepted decisions --
0054, 0063, 0064, 0065 -- had no design document at all, which is the specific
reason the delivery picture felt scattered. It is now one document covering
modules, the three edges, the core library, and how a change becomes a running
thing, with a table of what each property is designed against and what must
exist before it can be built.
2026-08-28 18:40:46 +02:00
jschoubben ba0d01788e 0062: a host may be episodic; 0060's Android gap closed
0060 named the gap and did not close it: everywhere else an init runs the
launcher at boot, and Android grants neither an init to register with nor
anything worth supervising, because a supervisor would be killed alongside what
it supervises.

Closed by narrowing what is required rather than building something. A host is
resident or episodic, and both are hosts. Being killed by the platform is
disconnection, which 0036 already made ordinary -- and every mechanism an
episodic host needs already exists because it was built for laptops that close.

A partial host can join a mesh and cannot be the first node, since every
bootstrap step is a shape it refuses. Its bundle says so.

Two consequences that are easy to miss: last-heard-from means much less on an
episodic host, so a healthy phone reads as a dead server unless the reader
knows which kind it is; and a declaration may take a long time to land, which
makes 0058's outstanding-versus-failed distinction load-bearing.

Still open, and in that order: what an Android node is FOR, and only then how
it is started.
2026-08-28 01:24:07 +02:00
jschoubben f1b1cd9aa0 Review: three ADRs no longer said what we had concluded
A sweep for claims overtaken by the last few days. Annotated rather than
rewritten, following the pattern already in 0049 -- what changed and why is the
useful part, and an accepted record should not quietly become something else.

0057's init section was wrong on all three of its claims. It said the host
needs FOUR things from an init; 0061 reduced that to one. It said every machine
the mesh targets already has systemd; Alpine does not, and it is the intended
first node. It said there is no second init to abstract over; there is now, and
the answer is still not an abstraction -- it is a four-line file per system.
What survives is the part that was always right: an init is not a dependency in
0041's sense, because it is not installed, it is what the machine already is.

0048 named Docker as the container runtime. It is now docker or podman,
detected rather than chosen -- because adoption keeps what a machine already
has, so naming one contradicted a rule already decided. That row is the only
one of the five that names two, and the record now says why.

0060 claimed the bundle is portable across operating systems. Its mechanism is;
its contents are not -- package names, unit names, service names all differ, so
an Arch host embeds an Arch bundle. That was my error, and it is the exact
confusion behind the question that found it.

The design layer had the same drift: 07 and 09 said "Docker" where they meant a
container runtime, 09 said systemd restarts the host after an upgrade when the
launcher does, and both install snippets assumed Arch. They now show Alpine and
Arch side by side, which makes the point better than prose did -- step 1
differs per system, step 2 never does.

Checked and NOT changed: 0047's "the vocabulary grows by one shape" is a claim
about the rate, not the count, and is still true. 0037 lists docker among tools
the host manages, which it does. 0041 says nothing about either.
2026-08-28 00:43:47 +02:00
jschoubben c557f99cba Record what testing podman actually showed
0060 said the container runtime was a separate decision. It is now made, and
the reasoning is worth keeping because it is the opposite answer to the same
question one paragraph earlier.

Abstracting service managers is lossy -- systemd and OpenRC are different
models and LoadState has no equivalent. Container runtimes converged on one CLI
deliberately, so almost nothing is lost: checked against podman 6.1.0, run,
rm -f and docker's own template syntax for state and labels all work unchanged.
Only the probe differs. So: a two-entry lookup, not an interface.

The difference that is NOT in the CLI is the one that would have shipped
silently. Podman accepts --restart unless-stopped, records it, and has no
daemon to act on it -- containers do not return after a reboot unless
podman-restart.service is enabled, which by default it is not. Every command
reports success and the effect does not happen.

That belongs in the declaration rather than the host: a node using podman is
told to enable the unit. Which is what made the service shape's missing 'boot'
field visible, and it is now built.
2026-08-27 23:59:05 +02:00
jschoubben e1ad39b500 Per-OS hosts, and an init asked for only start and restart
0060 -- the host is built per operating system. systemd and pacman are the Arch
host's implementation, not abstractions the mesh has to grow. They are not
independent choices: a machine has pacman because it is Arch, and the package
manager, service manager and packaging format arrive together as one decision
somebody made at install time.

Rejected abstracting them, and the reason is correctness rather than effort.
The service applier reads LoadState to tell "not installed" apart from
"stopped", which is what stops it reporting absence as success. An interface
spanning systemd and OpenRC degrades to what both express, and the lowest
common denominator is exactly where that fault lives.

Almost all of it is shared -- the vocabulary, store, apply loop, read-back
discipline, refusal model, bundle and link are portable. Two appliers differ.
And delivery was already per-OS, since a .pkg.tar.zst is an Arch artifact, so
this is the seam that already existed.

Android is the interesting case rather than Debian: no service manager, no
package installation, usually no root. Such a host implements file, directory
and action and refuses the rest -- the same refusal a host already gives an
unknown type, with a different reason. Those three are the portable floor.

The container runtime is deliberately left open: it is not an OS split, since
Arch runs docker or podman.

0061 -- the init is asked for start-at-boot and restart-on-exit, and nothing
else. Both are expressible in OpenRC, runit, s6 and an Android init.rc.
Counting failed starts and rolling back moves into a launcher, because that is
the one piece which must work when the host does not, and a script with a
counter can be tested where OnFailure= can only be hoped for. Supersedes 0059,
keeping its reasoning in full.

The checker found all six places citing 0059 and refused the commit until they
named the replacement.
2026-08-27 23:46:11 +02:00
jschoubben dcc4b8339c Say who consumes the broker and who writes the registry
Left implicit by the previous commit, which said the owning context writes
without saying what does the consuming.

The control plane is the consumer, and there is one of it. Seven contexts but
one deployable, so it is one process dispatching internally rather than seven
consumers racing -- which matters because the as-is records two consumers
accidentally sharing a queue and silently splitting the traffic, each getting
half of what it expected. With one consumer that cannot arise.

The broker is also the buffer while the control plane is down: nodes keep
publishing, messages queue, the control plane drains them on return. That is
what makes a single control plane tolerable -- an outage delays the mesh's
knowledge rather than losing it.

One consequence named because it will otherwise be discovered: an unbounded
queue grows until the broker's disk is full, and the broker is the component
every node depends on. The bound is per queue and undecided -- dropping the
oldest health report is obviously right, dropping the oldest declaration
acknowledgement is not.
2026-08-27 22:20:03 +02:00
jschoubben 19997d56c3 Approve 0057-0059, with four corrections from review
Not approved as drafted -- four things came out of checking them against each
other, and one was a bug that would have broken every upgrade.

The bug: 0059 specified Restart=on-failure while 0057 has the host restart onto
a new binary by exiting CLEANLY. on-failure does not restart a process that
exited zero, so every upgraded node would have been left stopped, having
successfully upgraded. Found by reading the two records against each other
rather than by either alone. Now Restart=always in all three places that
mention it.

The host cannot run in a container, and the reason is decisive rather than
stylistic: step 0 of the substrate bootstrap installs the container runtime, so
a host inside a container would need the thing it exists to install. It would
also break 0041 -- copy it onto a machine and run it stops being true when the
machine must already have a runtime. Everything above tier 0 is a container;
the host is not. That split is the tier boundary, not an inconsistency.

systemd is named rather than abstracted. An init is not a dependency in 0041's
sense: 0041 is about what must be installed before the host works, and an init
is not installed, it is what the machine already is. The unit file is the only
systemd-specific artefact and it belongs to the package, so a machine with a
different supervisor ships a different package.

The mesh is a watchdog, and my first draft was half an answer. Recovery must be
local -- nothing dials a node, and a host that cannot start cannot report. But
detection is the mesh's, and a local supervisor structurally cannot do it: it
sees one process failing and cannot tell a broken machine from a broken
release. Only something watching every node can, and that distinction decides
whether the response is "fix this machine" or "stop shipping this version". So
a host rollout is staged -- a few nodes, wait for heartbeats, continue or stop
on silence. Local rollback still needed, because the canary nodes break and
because a node offline during the rollout gets the declaration later with no
batch around it.

The first declaration is the overlay and nothing else. Forced, because a node's
address and peers are assigned rather than chosen. But also the way back in: a
node reachable over the overlay can be fixed by hand if a later declaration
breaks it, and a large first declaration risks a node that is broken and
unreachable at once.

Also stated plainly, because it reads as a contradiction: nodes reach each
other over the overlay and every node consumes from the broker; what 0039
forbids is an inbound CONTROL surface, not reachability.

And in 06: no node holds a credential to any control-plane store, for reads or
writes. Four ADRs already say this separately and none of them said it in one
place. Nodes state over the broker; the owning context writes. With a note that
most high-frequency writes are observability's, not the registry's -- routing
logs into the registry would be the shared-schema mistake arriving through a
door marked performance.
2026-08-27 22:12:12 +02:00
jschoubben 605c9fd441 Changes are pushed, not polled; and a stuck host rolls itself back
Two corrections and one new decision, all from Jochen catching things.

Pushed, not polled. I described updates as landing "on the next reconcile",
which reads as polling and is not the design. A declaration arrives as a
message on a link that is already open; the host applies it then. Polling over
an existing connection would be slower to land AND constant traffic to learn
nothing.

The timer is for drift and nothing else, and it cannot be replaced by an event
for a definitional reason: drift is change the mesh did not make -- somebody
edited a managed file, a distribution upgrade replaced a config -- so nothing
will ever publish a message about it. Only looking finds it.

Separated the heartbeat from the reconcile timer, which I had been conflating.
They point in opposite directions and answer different questions: the timer
looks at the machine and asks whether it still matches; the heartbeat reports
upward and is what makes silence mean something. A node with nothing to do
sends nothing, and without a heartbeat that is indistinguishable from a node
that stopped.

0059 -- a host that cannot start is rolled back by the service manager. I had
left this open on the grounds that recovery meant the host judging its own
health. That objection does not survive being asked properly: a keepalive is
something else judging the host. The watchdog must be local, because nothing
dials a node and a host that cannot start cannot report -- so it is the service
manager, which is already there.

The failure it prevents is sharper than "the node is down": a host that will
not start looks exactly like a machine somebody switched off, which is the one
condition this design has deliberately decided not to alarm on. So a bad
release reaches every node, each goes quiet, and the mesh reports a fleet of
sleeping laptops.

Confirmed means started and completed one reconcile -- deliberately not "the
link is up", or a laptop on a train would roll itself back. The rollback is a
script shipped by the package, not a host subcommand, because a binary that
will not start cannot be its own recovery. It rolls back once: a second failure
means the machine is the problem, not the binary.

Also refined the records checker, which produced a false positive: a proposed
record may extend another proposed one, because decisions are drafted in chains
and the alternative is marking things accepted to satisfy a check. An accepted
document resting on a proposed record still fails, and that was verified.

0057, 0058 and 0059 are all proposed.
2026-08-27 22:04:26 +02:00
jschoubben aeea2a9f9a Resolve the host lifecycle's open items, and say how the host is delivered
The upgrade question turned out to be a delivery question, so 0058 answers
both.

Today's third silo runs once per node and sends each one a command to install
and start. That is where the as-is records a package install that 404ed from
every mirror while the job went green, an image pull failure that did not fail
the deploy, and a verify stage that was built and never scheduled because it
was missing from a list.

The shape underneath all of those is that the thing reporting success was not
the thing doing the work. Meanwhile ADR 0037 has given every node a component
that applies state, reads back and reports -- so two mechanisms now change a
node and only one checks its work.

0058: a pipeline ends when the declaration is updated. Deploy stops sending
commands to nodes and becomes one write. The host applies it on its next
reconcile, and the host cannot report success it did not verify. The verify
stage disappears as a stage, which is the point -- verification stops being a
step that can be left off a list.

A pipeline result now means "the declaration is updated, and here is which
nodes have applied it". It does not wait for every node, because a node may be
legitimately switched off for a week. Outstanding is reported separately from
failed, since conflating them is how the old system produced a stall with no
error anywhere.

The host is delivered by exactly this path and needs no new resource type: a
`file` writes the package manager's config pointing at the mesh's repository, a
`package` names the version. Added a step I had missed -- before exiting for a
restart, the host runs the new binary once. A package can install something
that does not execute here, and that turns "the node never came back" into "the
apply failed and said why".

Six open items resolved: re-enrolment is decided when the token is issued and
revokes the previous identity; the mesh keeps a recovery copy of what each node
reports it owns, which un-strands the orphans; last-contact is reported with no
threshold, because a laptop off for three weeks is doing nothing wrong;
adoption always completes but a failed line makes a node ineligible for
assignment; a briefing is a structured document whose outcome is computed from
its lines; and the token is printed once and carried by hand, which is the
property that makes it worth anything.

Still open and named: automatic rollback of a host version that will not start.

0057 and 0058 are both proposed.
2026-08-27 21:53:38 +02:00
jschoubben 2204b01909 Design the node lifecycle end to end
The host was described as a component and never as something that runs for
years on a machine somebody else also uses. 09 covers every state a machine can
be in and every transition between them.

Four states: unmanaged, hosted, enrolled, disconnected. Only the last two are
nodes, and they are the same node in two situations. `hosted` -- the host
installed but never told which mesh it belongs to -- had no name before and is
where a machine sits between the two adoption commands.

Things that were unclear and now are not:

The first node walks the same path in an unusual order: reconcile from the
bundle, the control plane it just raised issues a token, enrol against it. Its
specialness lasts two commands. A side effect worth having -- enrolment is
exercised on node one, rather than being written and first used on node two.

Enrolment reports profile and inventory BEFORE the control plane decides
anything. The profile is the input to that decision, not a diagnostic; the
control plane cannot decide what a machine should run without knowing what it
can run.

Rebooting mid-apply is safe by construction. The store records each resource
after it worked, so a host that dies half way through comes back and applies
the rest. The rule that stops the host lying about what it did also makes it
crash-safe.

Retiring splits in two. Graceful is a final empty declaration. A node that is
gone will reconcile its last declaration forever -- the honest consequence of
making disconnection ordinary. The answer is not to make the host expire but
that the node holds nothing that outlives revocation: every grant is a per-node
credential revoked at the provider. A lost node keeps running and stops being
able to reach anything. Said plainly rather than implying the mesh can switch a
machine off, which it cannot and should not.

Losing the store is quiet and permanent, so it gets its own section. The host
re-enrols and re-applies fine; what does not come back is removal, because
resources it no longer has a record of become unowned and sit there
indefinitely.

Also corrects 0057, which said the mesh must not upgrade the host at all. That
conflated two acts. Replacing the binary is safe -- Unix keeps the running
inode. Stopping the unit is not. So the host may apply a package naming itself,
and restarts by finishing its apply and exiting cleanly, letting the supervisor
start it on the new binary. It never asks the service manager to restart it.
That makes a fleet-wide host upgrade an ordinary declaration, which the first
draft gave up on.

0057 remains proposed.
2026-08-27 21:16:44 +02:00
jschoubben 3ab11c96ef Say what the host process is: a root service, installed as a package
The design described what the host does and never what it is at runtime. The
words daemon, long-running, interval, poll and heartbeat appeared nowhere in it
or in the relevant decisions. What exists is a command that runs and exits;
what the design needs is a process holding a link. Nobody had written down that
those differ, so several questions had no answer.

0057 settles them. It runs on every node -- the host is what makes a machine
managed, so a machine without one is not a node. Root, because no useful subset
of the job is unprivileged. A systemd unit, because something must survive a
reboot to hold the link.

It never manages its own unit. The temptation is obvious and it ends with a
host stopping itself half way through an apply, leaving a machine with nothing
running to fix it. The installation owns the host; the host owns everything
else.

Installed as a package, with a tarball as the floor. The package carries the
unit file, the state directory and an upgrade path, which a bare binary does
not. But the mesh's package repository is hosted on the mesh, so any route that
needs the mesh to install the thing that joins the mesh is a circle -- the
tarball is the path that must never acquire a dependency.

Reconciles on start, on a declaration, on a timer and on reconnect. The timer
is the one easy to leave out, and without it `owned` reports what the host
applied rather than what is there -- ADR 0035 violated by omission.

The records checker caught this commit on its first attempt: 05 listed 0057 in
its frontmatter while 0057 is still proposed, and a to-be document may not rest
on an unaccepted record. The section now says so in the body instead.
2026-08-27 21:06:00 +02:00
jschoubben 2330d74c1b The host's vocabulary is complete; 05 and 07 said otherwise
All six shapes are built. 07 still said the last three did not exist, and 05
still described stage 2 as having built three of six.

Records what the lab still cannot do, because that is now the only thing
between here and an end-to-end substrate bootstrap: a sealed scenario cannot
fetch an image and its machines carry no container runtime, so package,
container and action were verified against a real machine instead.
2026-08-27 20:36:58 +02:00
jschoubben e1f4c7d9e0 Approve 0054-0056, apply them, and fix the two smaller findings
0003 is now superseded by 0056. Nothing is left proposed.

Applied:
- 06 corrected from ten contexts to seven plus the api, each row now stating
  why it passes the more-than-one-node test. work, knowledge and stream are
  named as mesh-hosted rather than dropped; `ai` folds into config; `record`
  is deferred explicitly rather than listed. Its frontmatter now cites 0055.
- how-we-build §4 amended per 0054, and the derived page republished by
  playbook 05.

The sync found the drift the playbook exists to catch: the published §4 and
the source did not say the same thing. The source said "four accidents, not
four boundaries"; the published page said "one intent expressed four times",
and only the published page carried the scope caveat. Same rule, two texts,
already diverging. Verified the republish by reading back -- the new rule is
present and the old section's body returns nothing -- rather than trusting the
success message.

The two smaller findings:
- 0051 separated the transport identity from the declaring authority. It said
  the token carries "an address" and "the identity to expect" without saying
  what the node dials. It dials the broker, so pinning only that would make the
  control plane's authority transitive and let a compromised broker forge
  declarations -- which, since the host applies whatever the link delivers, is
  the whole machine. The token now carries four things, and declarations are
  signed and verified per declaration. Cost recorded: rotating the signing
  identity is fleet-wide.
- 0026 no longer restates 0022's rule about generated views. 0022's own words
  are "prose does not restate status; one place, and two is one too many",
  which is what 0026 was doing to it.
2026-08-27 02:21:34 +02:00
jschoubben ef5dd0751b Approve 0049-0053; drop a to-be item superseded by ADR 0044
The 'domain grouping' item cited ADR 0017 as live guidance. 0044 superseded
it -- there is no domain module to group into, so there is no domain list to
settle.
2026-08-27 01:00:29 +02:00
jschoubben ccbbfa9c8a One node runs the control plane, and nothing takes over
Closes the two open questions in 06 and 08, which turned out to be one
question: how many control planes run, and what happens when the hub is down.
Both were drifting toward redundancy by default -- a standby plane, a second
hub, an election to pick between them. That is not one feature but a property
every layer must then honour, and each layer gets it wrong independently.

Not wanted, and not needed. A handful of machines with one node hosting the
registry is not a distributed system.

The argument for why this is sound rather than merely cheap is that the design
already tolerates it by construction. ADR 0036 makes reachability state rather
than class; the host reconciles from its own store (0043) and never needed to
ask anybody to hold the state it was last given. So the control plane being
down is not a new failure mode -- it is every node in the ordinary disconnected
situation at once. What is lost is change, not operation.

No node holds a contended role: the control plane is assigned like any other
module, and the overlay hub is declared (0050). No promotion, no quorum, no
fencing, no split brain, no replicated store, and no "which node is
authoritative" recurring at every layer.

Two consequences stated plainly rather than buried. The control-plane node is a
single point of failure -- deliberate, and said out loud so it stays
deliberate. And recovery is restore rather than failover, which makes backup
the availability story rather than hygiene.

The sharpest one is the clock: the control plane owns certificate issuance
(0049), so an outage outlasting a renewal window expires every public name.
That bounds how long recovery may take, and nothing measures it today.
2026-08-27 00:55:10 +02:00
jschoubben 4e80820e2f Design connectivity in full: overlay, resolution, exposure, filtering, certificates
Written as one document because the five are one design. They share inputs,
they must agree, and every one of them today is computed in a different place
by a different module from a different copy of the same facts.

The through-line is that none of the five can be answered by a machine alone,
so all five are decided centrally and delivered as `file` resources. That costs
no new host vocabulary and removes both remaining direct database connections
from nodes -- wireguard and traefik are the only two, and both are connectivity.

Three decisions fall out, all proposed:

0050 -- reachability is declared, not inferred from an address. The RFC1918
regex is wrong for carrier-grade NAT (100.64/10 tests as public, so an endpoint
is written to an address nothing can reach), wrong for IPv6, and wrong for a
routable address behind a closed firewall. The lab needing TEST-NET-3 to
satisfy the regex is the same bug from the other side. Also kills hub election
by address prefix, which fails silently and makes renumbering an outage.

0051 -- the enrolment token carries where the mesh is and how to recognise it.
Closes two circles with one mechanism: verifying the mesh needed the CA, and
obtaining the CA meant trusting whoever handed it over; and a node had to reach
the mesh before it could resolve any mesh name. An address plus a fingerprint,
carried out of band, resolves both -- and closes the CA question 0049 deferred.

0052 -- a filter rule names its source. `scope:` is declared in five manifests,
is part of no rule type, and is referenced by no code, so those manifests
appear to restrict ports and restrict nothing. Removed rather than implemented;
the general fix is refusing unknown keys, which the host already does and
manifests do not.

Also corrects two claims in 0049 asserting wireguard was already handled.
Research 006 says both modules still reach upward; neither is.
2026-08-27 00:36:49 +02:00
jschoubben 8d9282d86b Resolve the ingress gap: a route is a grant
ADR 0048 named ingress as an unclosed hole -- nothing said what terminates
TLS, how a public name reaches a container, or which tier owned it. Resolving
it needed no new concepts, which is why it survived: nobody had applied the
rules already written to it.

Ingress is not substrate. The control plane does not need a route to start,
and no node needs one to reach it -- the node dials out and has no listening
control surface. It grants itself a route afterwards, like a bucket.

A route is an instantiation edge under ADR 0044. The direction mirrors a
database -- the consumer supplies a target and receives a name rather than
credentials -- but it is the same edge.

The substantive finding is that exposure is three facts at two scopes: name
resolution and certificate issuance need to know which node is publicly
reachable, and only the proxy mapping is a single machine's business. That is
why it belongs to the connectivity context, and why Traefik doing all three on
the node is wrong.

Which matters beyond tidiness: research 006 counted traefik as one of two
modules opening a direct Postgres connection, reading nodes and mesh_ca. That
violates 0037, 0045 and 0039 at once, and is why every node permanently holds
a credential to the control plane's database. Deriving the config centrally and
delivering it as `file` resources removes it, costs zero new host vocabulary,
and closes the set 0039 identified -- wireguard was the other.

Left open deliberately: the mesh's internal CA is the other thing traefik
reads, and it belongs to the link's mutual authority, not to exposure.
Conflating the two is what made the gap hard to see.

Also fixes an inconsistency from the previous commit: 06 still claimed the
virtual host was raised from the bundle.

Proposed, not accepted -- for review.
2026-08-27 00:22:52 +02:00
jschoubben 4d19e93900 Name the substrate's actual products
The design layer described every service by role and never once by name:
Postgres appeared in zero design documents. That was over-application of the
research rule "never identify the mesh it observed", which is about node names
and domains, not software.

Two things were actually broken by it. substrate.lock pins images by digest and
a digest belongs to a named image, so the bundle could not be written from the
design. And a reader could not tell a settled choice from an unexamined one --
"a relational store" reads identically either way.

ADR 0048 names them: PostgreSQL, LavinMQ, MinIO, an OCI registry, Docker. The
argument for each is continuity, which is a real argument -- replacing a
substrate service migrates the mesh's own state. Role and product are now both
written, because the design depends on the protocol while the installer needs
the product.

Also separates two questions the substrate doc had merged: being substrate and
being in the bundle. Only Postgres must precede the control plane; the rest are
substrate by role and ordinary by delivery. Whether the bus joins it is left
open, because it turns on the control plane's internal shape.

Names the forge as Gitea, and records ingress/Traefik as an unclosed gap rather
than a naming one -- nothing says what terminates TLS or which tier owns it.

Fixes a miscount: the host's bootstrap vocabulary is six shapes, not five.
2026-08-27 00:11:38 +02:00
jschoubben c631cbd07c The bootstrap starts a step earlier than recorded
Asked whether postgres has to be installed, and the answer exposed a missing
step. The store is a container, so something must run containers before anything
else happens — and a container runtime is a PACKAGE, not a container.

Step 0 is where several threads meet. It is what the host's capability detection
already reports, and the first use of that report by something other than a
person. It is adopted rather than installed when the machine already has a
runtime with configuration somebody chose. And it is a package, needing the
machine's own package manager and a network, both of which ADR 0046 permits.

So the host's bootstrap vocabulary is six shapes: package, container, file,
directory, service, action. Stage 2 built three of them.

The node host design now names which three remain and why the lab cannot yet
exercise them — a sealed scenario fetches nothing and its machines carry no
container runtime, which is lab-installation work rather than a constraint on
the design, because production machines have a network.
2026-08-26 23:58:19 +02:00
jschoubben 93470f6162 ADR 0047 — the bundle may carry actions the link may not
The bootstrap's sharpest open question, and the framing was wrong. "State on
this machine" was being read as the filesystem and the service manager. A
service running on this machine IS part of this machine — writing a file and
creating a database in a local store differ in mechanism, not in scope.

The real question was underneath: must the host learn what a database is? It
must not. Giving it a `database` resource type means tier 0 knows Postgres, then
a bucket, then a virtual host — the host acquiring the substrate's vocabulary
one service at a time, which is what ADR 0037 exists to stop.

So the bundle declares an ACTION and the host runs it and verifies it. What a
database means stays with the module that provides one; the host knows only how
to run a declared action against something local and check the result. Its
vocabulary grows by one shape rather than by one resource type per service.

Actions are permitted in the bundle and forbidden over the link, and the
asymmetry is deliberate. A bundle arrives WITH the binary: anyone able to put a
hostile action in it could equally have put it in the host itself, so refusing
actions there buys nothing and costs the bootstrap. The link is a separate
party, reachable separately, and an action there is the unbounded blast radius
ADR 0039 refuses. That decision stands unchanged.

And ongoing provisioning is not the host's at all — the control plane does it
once a mesh exists — so the asymmetry costs nothing.

Which dissolves the earlier worry about one mechanism with a tier boundary
inside it: there are two mechanisms, with different actors, scopes and trust
models, and that is the answer rather than a compromise.

Named rather than hidden: this is the escape hatch research 011 warned about,
arbitrary code in the place hardest to remove later. It is bounded by being
bundle-only and by every action having to declare how it verifies itself, and
that boundary is the whole defence.
2026-08-26 23:56:39 +02:00
jschoubben 5b3d0ebd4f ADR 0046 — the installer fetches what it pins
The blocking question was where a container image comes from, and the version
that blocked assumed the machine might have no network. That assumption came
from the LAB: a scenario is a closed address space by design, which is what lets
two scenarios hold the same addresses without meeting. Production is not sealed
— a machine being adopted has a network, and one that does not is a machine
where very little works anyway.

So substrate.lock carries references, not payload: an image name and a digest,
fetched at apply time. A first node pulls from upstream because no mesh registry
exists yet; every node after that pulls from the mesh's own. The lab is the
exception and places images itself, the way it already places the host binary —
a property of a test environment, and letting it dictate the production design
would be the tail wagging the dog.

Pinned by DIGEST rather than tag. Reproducibility comes from pinning the
identity of a thing, not from carrying its bytes, which is what makes fetching
acceptable rather than a compromise.

ADR 0041 survives untouched, which was the point. "Copy it onto a machine and
run it" stays literally true — one binary, a few megabytes, which then fetches
what it was told to. Carrying images would have quietly redefined the property
that decision rests on.

Costs accepted and named: an apply can now fail because something is
unreachable, which a self-contained artifact could not, so it must fail legibly
— naming what it could not fetch and from where. And the lab needs a way to
place images into a machine that also has no container runtime, both of which
are lab-installation concerns and neither solved here.

Research 012's build-time-versus-apply-time reframing narrows accordingly: it
still holds for what a tailored installer contains, and no longer has to hold
for images.
2026-08-26 23:52:46 +02:00
jschoubben 60aea14935 Define the substrate, and answer 006's four-or-five conditionally
Same gap as the control plane: load-bearing and unpinned.

The substrate is what the control plane CONSUMES AND CANNOT GRANT ITSELF. Every
module needing a database asks provisioning for one; the control plane needs one
too and cannot ask itself, because it is not running yet. That circularity is
not an awkwardness to work around — it is the definition, and anything on the
wrong side of it must be raised by the bundle the host carries.

Which answers 006's open question in the honest form rather than with a number.
The identity provider is substrate only if the control plane DELEGATES
authentication — then it cannot serve anybody before the provider exists and
cannot grant itself a client. If it authenticates natively, the provider is an
ordinary hosted service. So the count follows from a decision not yet taken, and
asserting four was asserting that decision.

The test also rules out the tempting wrong answer: an identity provider, a mail
server and an analytics service are all infrastructure by any ordinary reading,
and none are substrate, because the control plane starts and runs without them.
Important is not the test.

Records why the bundle is pinned by hand — it is applied when no mesh exists, so
nothing can resolve a version or ask a registry — and why it must be
self-contained, which makes it an artifact built on a machine with a network for
a machine that may have none.
2026-08-26 23:39:11 +02:00
jschoubben 148395ca54 Define the control plane, which was used 79 times and defined nowhere
Nineteen files, seventy-nine mentions, no definition. That is how-we-build §5
failing on this repository's own vocabulary — ubiquitous language is checked,
not assumed.

The definition, and it is not arbitrary: the control plane is everything that
needs to know about MORE THAN ONE NODE. It follows from ADR 0037, which has the
host applying rather than deciding precisely because deciding needs knowledge
the machine does not have. So the line falls exactly there — writing a file is
the host's, choosing which nodes run the store is the control plane's, and
anything a single machine could answer alone does not belong here at all.

That last consequence is worth having: putting a single-machine concern in tier
2 is a mistake the tier rule will NOT catch, because the dependency direction
stays correct.

Also states what it is not — not the thing that changes machines, not a surface,
not the substrate, and not privileged on a node beyond what the declaration
vocabulary allows. And the property that makes tier 2 unlike the others: it is
itself a consumer, with the same requirements as any module, which is the
circularity the bundle exists to resolve rather than hide.

Scoped deliberately: this defines the term and does not design the contexts
inside it. Ten is the skeleton's claim rather than a settled list, and research
006 still asks whether the record belongs here or in the substrate.
2026-08-26 23:33:20 +02:00
jschoubben bea052753e ADR 0043 — what a declaration is
Stage 2 could not start without it. Three constraints already bound the shape
and between them they decide most of it.

JSON, because the standard library carries it and carries no YAML, and a YAML
declaration would put a third-party parser inside the one binary whose whole
argument is that it needs nothing — to gain authoring comfort in a document
generated by a machine and read by a machine.

An ordered list, because ordering is a DECISION. A host deriving order from
declared dependencies would be deciding the thing most likely to differ between
what the control plane intended and what the machine does. The control plane
knows what depends on what; it says so by saying when.

Unknown is refused, never skipped — an unknown version, type or field refuses
the whole declaration. A host that skipped what it did not understand would
apply most of a declaration and report success, which is 04-ISSUES/003 with the
declaration on the other side of the wire.

Complete for what the host OWNS, and only that. It removes what it previously
applied and is no longer declared, which it knows from the store rather than by
inference, and never removes what it did not create — a converger that treats
'not declared' as 'must not exist' deletes what the mesh never put there.

Two consequences arriving earlier than the build order suggested: the store is
load-bearing at stage 2, because nothing can be removed without knowing what was
applied. And a closed address space bounds the first vocabulary to what needs no
network, because a scenario has no route to a package repository.
2026-08-26 02:04:41 +02:00
jschoubben 92e8c74ce4 ADR 0041 and the build handoff for the node host
Building tier 0 forced the question "the one binary installed by hand" had been
carrying unexamined. A TypeScript host needs a runtime present before it runs,
so the thing installed by hand becomes two — and the second must be installed by
the means the host exists to replace.

So the host is a statically linked binary that requires nothing present, written
in Go. Rejected: a runtime installed first, which breaks the property the tier
rests on; and bundling the runtime into the executable, which carries ninety
megabytes to preserve a language choice and puts a young feature at the bottom
of the stack.

The argument that decided it is architectural rather than about taste. 0037
means the host never queries the mesh database and 0039 means it only receives
declarations, so the host shares NO code with any other tier — not a client, not
a schema, not the SDK. The language boundary falls exactly on a boundary that
already exists, and a second language usually costs duplicated logic where here
there is none to duplicate.

§8 gains a scope: it said "TypeScript throughout" when everything was a service
or a surface, and is now scoped to those with tier 0 named. Another sync owed.

Playbook 04 steps 2 and 4: repos.md records mesh-host as existing, the design
takes code: [mesh-host] and status: in-progress.
2026-08-26 00:16:07 +02:00
jschoubben b9facf9375 Design the node host
Playbook 02 step 3, on four recorded decisions. Tier 0 has one job — apply
declared state on this machine — and the six absorbed concerns are instances of
it, not additions to it.

Specifies the six parts and what each owns, and the two properties that make
apply trustworthy rather than merely present: every applier reads back, because
setting a value is not evidence the value took; and what was applied is recorded
after it works, never before, because a failed apply leaves the machine wherever
it reached and nothing must claim otherwise.

Build order is staged so each stage is verifiable in the lab before the next
exists. Stage 1 is profile and inventory — no control plane, no declarations, no
network — and it is deliberately the smallest useful thing, because `place:` has
nothing to place and the lab therefore raises empty machines. Stage 1 ends that,
and every later stage is tested by a lab that already works.

Stage 2 is the one that could invalidate the tier boundary: whether one host can
raise the substrate alone is Move 1's assumption and has never been proved.

Every decision the design rests on is given the test that asserts it, per 0034 —
including the dependency-direction lint, which is what makes "the host never
queries the mesh database" a rule rather than an intention.

Six things left open and named, including the one that host-size.md could not
measure: zero dependencies, but still six vocabularies.
2026-08-26 00:10:24 +02:00
jschoubben 4bf7a35568 Close the record on the lab
Playbook 02 and 04 were followed for the substance — decisions before design,
design before build — and skipped for the bookkeeping. This closes that.

004 graduates. Its one open item was "not yet stood up"; the lab is stood up,
and the substitution the effort turned on is now enforced by the validator
before anything is raised rather than left as a thing to remember. Its
certificate conclusion has a home in 01-end-to-end-testing and is designed but
not built — implementation is a third axis, and an effort graduates on its
conclusions.

One item leaves 004 without a home and is recorded rather than lost: the reverse
proxy does not set caServer, so it defaults to the production endpoint.

The two lab designs read `designed` while running in production of a sort, so
they become `in-progress`.

And the lab gets an as-is document, which it did not have. It records what runs
including the parts nobody would choose again: that `place:` is refused and the
lab therefore raises EMPTY MACHINES, that the drawing shipped with no design
document behind it, that a router is tagged as a machine for a reason found by a
bug, and that the integration suite raises two of five scenarios while both
faults found so far lived in the three it does not.

006 stays active, deliberately. Two of its open questions ARE the tier 0 design
— whether absorbing six concerns makes the host too large, and whether an
unprivileged node earns a place in the inventory. Playbook 04 is explicit that
an open question is a reason to research, not to build around.
2026-08-25 01:55:52 +02:00
jschoubben 8efa063f21 The snapshot question is answered by a test
The lifecycle design asked whether a scenario snapshot needs the machines
stopped. The integration test answered it on its first run: no, but they
must be flushed.

A snapshot captures disk and not memory, so a write still in the guest's
page cache is absent from it — not stale, absent. A file written seconds
before a snapshot did not survive the restore.

Flushing first buys write-durability. It does not buy
application-consistency: anything mid-transaction is still captured
mid-transaction, and that limit is now stated rather than left implied.
2026-08-24 22:26:47 +02:00
jschoubben eab4598494 ADR 0033: a router is scenery, not a node
ADR 0016 makes a lab node a virtual machine, and its reasoning is
fidelity: a node boots a stock image and runs the real install, so it has
to be a real machine or the thing under test is not the thing that ships.

That reasoning does not reach a router. Nothing under test runs on one, it
holds no identity, the mesh never installs anything on it, and no assertion
is ever made about its internals. It exists so packets behave the way they
behave in the world, which is the definition of scenery.

So a router is a system container. What it must reproduce is kernel
behaviour — translation, connection tracking, filtering, forwarding — and a
container has the same kernel.

Verified before deciding rather than assumed. In a plain unprivileged
container: ip_forward and ipv6 forwarding both settable, nftables
masquerade accepted and listed back, and the conntrack timeouts that
mapping_ttl depends on both writable. No privileged mode, no nesting, no
capability grants.

Rejected letting the hypervisor provide NAT, on a stronger ground than
speed: it makes the lab provide what the declaration is supposed to own,
and it cannot express a mapping that expires, a gateway that refuses to
forward, or policy between siblings. The model would shrink to fit the
tool.

The distinction is now load-bearing and has to stay legible: node means
something under test, scenery means something that makes the test real. If
the mesh ever installs anything on a router, it has become a node and this
record no longer covers it.
2026-08-24 01:28:08 +02:00
jschoubben e88b448145 The fix is real: 76x, verified. And how the lab installs on a clean machine
Snapshot 9.9s -> 0.13s. Restore 10.4s -> 0.80s. Three snapshots sharing
1.36 GB instead of costing 4.8 GB. The projected four-machine reset cycle
falls from ~90s, unbounded at worst, to ~15s dominated by a boot that
cannot be avoided. ADR 0029's inner-loop argument holds with copy-on-write
and did not without it.

The consistency matters as much as the speed: three consecutive snapshots
took 0.13, 0.12 and 0.13 seconds, against a dir second snapshot that never
finished.

One honest counter-observation recorded: launching onto the fresh
copy-on-write pool was slower, 20.2s against 14.3s, because the image had
to be unpacked into a pool that had never seen it. Paid once per pool, and
dwarfed by what snapshotting saves, but it went the other way.

Doing the measurement produced the answer to how the lab installs on a
clean machine, because both failure modes appeared while doing it.

Installed is not available: the daemon was present with units disabled and
no group. Issue 007.

Available is not adequate, and this is worse: with the storage tooling
absent everything worked and snapshots were seventy-six times slower.
Nothing failed, nothing warned. That is a variant the mesh has not
catalogued — its usual failure is reported success and did nothing; this is
reported success and did it seventy-six times slower, which no error
surface catches because nothing is wrong.

So the lab verifies CAPABILITY, never installation, and refuses to run
degraded rather than warning — a warning about a slow inner loop is read
once and ignored forever. Prerequisites may arrive from a mesh module or
from the lab's own bootstrap, and the second path is required rather than
convenient: a lab installable only by a mesh cannot host the development
of the mesh that installs it.

The lab is the second thing installed by hand, after the node host, and for
the same reason: something has to be first, and pretending otherwise
produces a circularity papered over by a script nobody exercises.
2026-08-24 00:14:57 +02:00
jschoubben 98bcd5cc49 Measure the lab's inner loop — it is too slow, for a fixable reason
The lifecycle design closed on a question that was measurable rather than
arguable, so it was measured. One virtual machine on a workstation with
hardware virtualisation and NVMe.

Raising: the launch call returns in 3.4s, the machine is actually usable
after 14.3s. The gap is a design constraint — raise must wait for the
second number, because reporting the first would be transport reported as
effect, which is the mesh's own recurring failure.

Snapshot: 9.9s and 1.6 GB for a 1.5 GB instance. A dir snapshot is a full
copy; nothing is shared. Restore: 10.4s, usable again after 20.1s.

The second snapshot exceeded two minutes and never completed. That is the
more troubling number: snapshot cost here is not merely high, it is
unpredictable, and a loop with a variable multi-minute step is one nobody
trusts.

Projected to a four-machine scenario, a reset-and-rerun cycle is about a
minute and a half at best and unbounded at worst, before any of the mesh's
own work begins. That is too slow for an inner loop, and ADR 0029's whole
argument — that making the bootstrap path the inner loop turns the
least-exercised code into the most-exercised — holds only while resetting
is cheap.

The cause is not virtual machines. Hardware virtualisation is present and
machines boot in fourteen seconds. It is that the daemon offers exactly one
storage driver, dir, which has no copy-on-write and therefore no cheap
snapshot. The btrfs kernel module is available; btrfs-progs is simply not
installed, which is the entire reason the driver is absent.

The copy-on-write comparison was deliberately NOT run, because running it
would mean installing a package by hand — which the rules forbid and which
would have made the measurement unreproducible. So the honest statement is
that the current configuration is too slow and the likely fix is known but
unverified, rather than that btrfs fixes it.
2026-08-24 00:07:22 +02:00
jschoubben a253afe020 Scenario lifecycle, and how two scenarios coexist
ADR 0032: a scenario is a closed address space. Every segment materialises
as its own isolated link belonging to one instance, so two scenarios raised
from the same declaration hold the same addresses and never meet. The
declaration keeps its literal addresses and they mean what they say —
allocating from a pool would have made them a fiction, so a scenario
reproducing a specific topology would stop reproducing it.

The constraint that follows shapes everything: the lab never reaches into a
scenario over IP. It talks to machines through the virtualisation layer's
own channel. If it reached them by address, the workstation would need a
route into each scenario, and two carrying the same prefix would give it
two routes to one destination — failing not with an error but by one
scenario's traffic arriving in another.

That also makes reachability an honest question. Can this machine reach
that one is asked from INSIDE, by executing on the first, rather than
probed from a workstation that is not on the network and whose opinion
would be a different question with a misleadingly similar answer.

The lifecycle itself: six verbs, of which raise and destroy are enough to
be useful and the rest are what make repetition cheap. Raising is
convergent rather than incremental, because a lab behaving differently
from the thing it tests teaches the wrong habit.

A failed raise leaves the wreckage standing. Tearing down on failure
destroys the only evidence, which is backwards — a scenario that failed to
raise is more interesting than one that succeeded.

Snapshots are whole-scenario. Per-machine would be cheaper and wrong: the
mesh keeps state spanning nodes, so restoring one machine while its peers
move on produces a mesh that has never existed, and faults found there
would be artefacts of the lab.

Closes the declaration's open question about running several scenarios at
once.
2026-08-23 23:53:00 +02:00
jschoubben e88a6df924 Public networks are unrelated, and routed rather than bridged
Caught in review: every public address sat in one /24, which made the
three of them look like one network. They are not. The internet is a very
large number of unrelated networks routing to each other, and a machine in
one is many hops from a machine in another with no shared broadcast domain
between them.

Putting them in one prefix would have quietly made four false things true
in the lab: machines resolving each other by ARP and talking directly, TTL
never decrementing, broadcast and multicast crossing between them, and any
two being adjacent.

The third is not hypothetical. The as-is layer records that mesh names are
deliberately not multicast names, after a delay and a one-node-only failure
mode. A lab where the internet is one broadcast domain would let a node
discover a peer by multicast that it could never discover in production,
and report success — the exact false green this effort exists to prevent.

So a scenario has one public segment per public NETWORK, each with its own
unrelated prefix, wired together through a router and never onto a shared
bridge. That is a property of how the lab wires them rather than a field
anyone sets, because no correct scenario has two public networks adjacent.

Addresses now spread across all three RFC 5737 ranges plus RFC 3849 /48s,
chosen to look nothing like each other, and a foreign private network uses
someone else's RFC 1918 range rather than a documentation one.

All three examples in the document rewritten, since two of them still
showed a single flat internet segment and contradicted the new rule.
2026-08-23 23:49:38 +02:00