Playbooks 07 and 08: is the coast clear? Hold a push while a release branch in flight shares its files; the glossary's release branch
The operator, 2026-10-16: the file module waited for feature 57's release branch, which changes four of the
same controller files.
2026-10-16 11:28:32 +02:00

277 lines
19 KiB
Markdown

# Playbook 07 — Features
**Trigger.** A feature: work that changes code in one repository or several (`mesh-sdk`, `mesh-controller`,
`mesh-catalog`, `mesh-host`, `mesh-lab`, and `hq` when a design rides along), too large to be one small fix.
A small fix (one repository, one issue, about an hour of work) follows
[playbook 08](08-small-fixes.md) instead.
**Who runs it.** Anyone who writes code, engineers and agents alike. Agents follow it exactly.
## The failures it prevents
- **Pull requests as scratchpads.** A feature worked as one pull request per unit of thought left sixteen
stacked pull requests unmerged, consolidated by hand afterwards. A pull request is the end of a feature,
not a step in it.
- **Waiting on checks mid-feature.** A feature worked as one pull request per issue into protected
branches spent most of a day waiting for merge checks while the code was ready.
- **Context bought again and again.** A fresh agent per small issue spends most of its run reading the
playbook, the issue and the code before it writes a line. On 2026-10-14 an issue sized for five to ten
minutes took forty-one.
- **Finished work that never ships.** A feature that kept taking new issues held thirteen landed issues
undelivered for a day: an issue done at 21:09 was still not on the machines at 15:00 the next day.
- **Work that waits and nobody notices.** Most lost time was not work at all, but a check, a delivery plan
or an agent waiting on something that had stopped, unseen.
- **Review that keeps hardening.** One fix went through seven review rounds in five and a half hours, each
asking for more hardening than its issue asked (issue 704, 2026-10-14). A round is for what makes the
change wrong; everything else is an issue of its own.
- **The first check after the whole branch is written.** A feature's catalogue branch, pushed once after
hours of local work, met its first check on 2026-10-16 and failed on 29 problems, TypeScript errors among
them, that a unit suite run continuously while working finds at once.
- **A green pull request nobody marks.** An approved, green pull request that was not marked ready waited
12 h 17 min for someone to merge it (mesh-catalog #300, 2026-10-14).
- **A module proven only after it reached the machines.** The mail modules were delivered with unit tests
only, then failed live three times (issues 859, 865, 868) and took five more hours of fixes.
## The shape
One feature is **one branch name**, **one worktree per repository**, **one pull request per repository**,
opened **once**, after the review. It runs in five phases, and its time is bounded:
| Phase | What happens | Bound |
|---|---|---|
| 0. Prepare | the lead settles the open questions and writes one context file per repository | 15 minutes |
| 1. Develop | one fixing agent per repository builds every issue locally, unit tests only | 1 to 2 hours |
| 2. Review | one reviewer reads all of it; reports go both ways; at most 3 rounds | 15 minutes |
| 3. Check | push; the forge's merge checks run the integration tests; no further review | one check run |
| 4. Deliver | merge; the delivery plan builds, publishes and sends the whole feature | its delivery plan |
A feature that cannot be developed in about two hours is split into **steps**. Each step runs all five
phases on its own; the next step starts only when the previous step's delivery plan is done. A step is the
unit that ships, so nothing finished waits for work that is not.
**Scope is fixed at phase 0.** An issue found during a feature goes to the next step or the next feature,
never into the running one, unless it blocks the running one.
## Phase 0 — Prepare (the lead, larger model)
1. **Name the feature once:** `feat/<slug>`, the same branch name in every repository it touches. The
branch is never protected.
2. **Make the worktrees:** one per touched repository under `.work/<slug>/<repo>`, branched off `main`
(`git worktree add .work/<slug>/<repo> -b feat/<slug> origin/main`). The lab beds find the other
repositories by sibling path, so add the untouched siblings the lab reads as detached worktrees on
`main` (`git worktree add --detach .work/<slug>/mesh-tools main`), never symlinks.
3. **Settle every open question** in the feature's issues before any agent starts: on the issue, through
the knowledge base, or by asking the operator. A fixing agent that meets an undecided design question
stops, and its run is spent again.
4. **Write one context file per repository**, `.work/<slug>/<repo>.context.md`. It is what a fixing agent
reads instead of rediscovering the code, and it is reused by every agent and every round:
- the issues it builds, in order, each with: the files and functions it changes, the decisions it builds
with (quoted, with where each was decided), the test to write first, done-when in one sentence;
- the repository's map for this feature: the packages and files involved, with one line each on what they
hold, and the patterns to copy (file:line);
- what not to touch, and what lands beside it in other repositories;
- the local facts: the worktree, the branch, the check commands, a temporary directory for tests outside
the home (`TMPDIR`), and the unit tests to run (never a database server: tests that need one are
integration tests, which the forge's checks run).
When the reading is large, a read-only agent on the smaller model answers the lead's exact questions with
file:line, and the lead writes the file from its answers.
5. **Move the issues to `fixing`**, `by` naming the feature's agent for that repository.
## Phase 1 — Develop (one fixing agent per repository, smaller model)
- **One agent per repository, kept for the whole feature.** It reads its context file once and builds the
issues one after another, committing each locally with a message naming the issue ("Keep the assignments
on the bus (issue 652)"). It is not replaced per issue: the lead continues the same agent (by its id) with
the next instruction, so its context is paid for once.
- **Unit tests only, of what changed, each well under a second** (how-we-build §5, ADR 0391). Each issue's
first test fails before its change and passes after; `gofmt`, `go vet`
and the repository's unit tests stay green. The integration tests (`merge-check.sh` with the store and the
bus) wait for phase 3.
- **Nothing is pushed** and no pull request is opened in this phase. Never land on a red check: run the
checks, read the result, then land in a separate step.
- **The fixing agent's brief** (the lead gives it with the context file): name your issue in every step and
message ("issue 805: landing in mesh-catalog"); reach the mesh only through the mesh MCP server, never ssh;
never push, open, merge or close a pull request; never write to a store's database by hand, a schema change
is a numbered migration and the consolidated schema; Go only unless the context file says otherwise; never
move another issue. Report back in under 150 words: commits, tests added and that they failed first, the
check results, anything you stopped on.
- **An agent that finds the code differs from its context file stops and reports** (file:line); the lead
settles it, updates the context file, and continues the agent.
- **Two repositories that depend on each other** keep their order in the context files: the reader before the
writer, the controller's new manifest word before the catalogue manifest that uses it.
- **Several agents in one repository** (only for a large repository with independent areas): each works on a
local branch of its own from the feature branch's head and lands by fast-forward under a lock
(`flock <feature worktree>.lock git -C <feature worktree> merge --ff-only <its branch>`), after its unit
tests pass; if another landed first, it merges again and repeats. In a shared clone, fetch the feature
branch by name before branching from it. Never resolve a conflict with a blind `git merge-file --union`.
## Phase 2 — Review (one reviewer, larger model; at most 3 rounds, about 15 minutes)
1. **Bring every feature branch up to the current trunk** (fetch by name, then merge), so the reviewed tree is
the tree that is pushed.
2. **One reviewer reads every repository's local commits** together, against the context files and the
decisions. Its report is per repository: each finding as file:line, the failure it causes, and the fix.
It says which round it is in ("round 1 of at most 3").
3. **The report goes to the same fixing agents** that wrote the code, continued by their ids, so they fix
with the context they already hold. Each answers the reviewer: what it changed, per finding, or why not.
4. **The reviewer reads the answers and the new commits**, and approves or reports again (step 5 says what a round
may ask). After round 3 the lead stops and brings the operator what is left, with a recommendation.
5. **A finding outside the issues' done-when is never a change asked, in any round.** More hardening, a
further case, a nicer form: the reviewer opens it with `issue-tracker.open` and names the number in its
report, and the round does not wait for it. What a round asks is only what makes the change wrong against
its issues and its decisions.
## Is the coast clear?
Before the push of phase 3 (and of a small fix, playbook [08](08-small-fixes.md) step 5), the lead checks, for every
repository the change touches, whether a **release branch** is in flight there: a branch other than `main` that
collects a feature's merged work to bring it into `main` as one delivery.
1. **Look for one.** A pull request into `main` whose head is a release branch (`gitea.gitea_open_pulls`), a
release branch holding merged work that `main` does not have yet (`git log origin/main..origin/<branch>`), or
a delivery plan of that release branch still running (`mesh-controller.plans`).
2. **Compare the files.** `git diff --name-only origin/main...origin/<release branch>` against the files the
change touches.
3. **Overlap: hold.** If the release branch touches a file the change touches, nothing is pushed into that repository
until the release branch's delivery plan is done. Then the feature branch is brought up to the new `main`, the unit
tests run again, and the push follows. The hold is on the wait list (its bound: the release branch's delivery plan),
and is said to the operator with what the change waits for.
4. **No overlap: go on.** A release branch in another repository, or one that shares no file with the change, does not
hold it; its merge joins the merge window as any other (ADR 0276).
Merging beside a release branch still in flight would make its lead resolve someone else's conflicts in the
middle of it, and could send part of the change with its delivery (2026-10-16: the file module's
controller part touched four files feature 57's release branch also changed).
## Phase 3 — Check (no review)
1. **Push every feature branch and open one pull request per repository, together, once the coast is clear**
(above). The integration tests
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
more repositories that share the branch name are one delivery group (ADR 0239 §2).
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
reviewer first confirms that commit's tree equals the reviewed one.
2. **The forge's merge checks run the integration tests once** (`mesh/merge-gate`, `mesh/repo-check`). No
second review: phase 2 reviewed this tree.
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
the same fixing agents; then push once again.
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
carries an integration test that starts the module whole, its process against the real bus and store, and
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
comment `ready at <full sha>`, the head it approved); mesh-delivery merges it when its checks pass
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Plan such a feature as two steps.
## Phase 4 — Deliver
The merge starts the delivery plan: build, publish, send. A merge into a branch other than `main` is not a
delivery: no machine receives it (issue 889 while it still starts one). The lead follows it to done
(`mesh-controller.plans` with `wait` and `until: done`), then resolves the feature's issues with `fixed-by`
naming its pull requests, and removes what is left: no `feat/<slug>` branch and no `.work/<slug>` worktree
survive.
## Models
| Who | Model | Why |
|---|---|---|
| The lead (phase 0 decisions, the context files, following and reporting) | larger | judgement |
| Read-only questions about the code for the context files | smaller | reading, answered with file:line |
| Fixing agents (phase 1, and the fixing in phases 2 and 3) | smaller | building to a written context |
| The reviewer (phase 2, and the extra cycle in phase 3) | larger | judgement, once per round |
| Decision records | larger | judgement |
Every agent the mesh runs draws on one weekly allowance shared by every session, and the larger model
spends it many times faster. Up to five agents on the smaller model at once, at most two subagents on the
larger one (the lead not counted).
## Following and reporting
Most lost time is waiting nobody saw. The lead therefore keeps a **wait list**: everything the feature waits
on, with when it started and its bound.
| Waiting on | Bound | Past the bound |
|---|---|---|
| a fixing agent's issue | 30 minutes | ask it where it stands; split or take over |
| the review | 15 minutes a round | ask the reviewer; stop at round 3 |
| a merge check | 15 minutes | read the build queue (`mesh-controller.queue`) and the check's log |
| the ready mark | 15 minutes after the acceptance is shown | the reviewer marks it, or the lead does |
| a release branch in flight that shares files | its delivery plan done | report it every ten minutes; bring the branch up to `main` after |
| a merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
| a delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
**Every ten minutes, and at once when something lands, stops or needs the operator,** the lead reports, in
one of the two layouts below. Times are local and absolute; every number has its unit and its bound or
baseline; an issue is named by its number and a few words, never by its number alone.
**The full layout** (in the session), the issues as a tree: grouped by repository, each issue under the one it
waits for, marked ✓ landed, ▶ fixing, ⏸ waiting, ✗ stopped:
```
Feature <slug> · step <n> of <m> · phase <name>, <minutes used> of <bound> min
Issues: <landed> of <total> landed · <fixing> fixing · <waiting> waiting
mesh-controller (agent: fixing, 2 of 3 landed)
├── ✓ 652 assignments on the bus landed 14:02
├── ▶ 736 placement words leave the layers fixing since 13:51, 23 of 30 min
│ └── ⏸ 751 config keys named (mesh-catalog) waits for 736
└── ✓ 654 a file names its template landed 13:20
mesh-catalog (agent: waiting)
└── ⏸ 751 (above, under 736)
Past its bound: <the wait, how long, what is being done> — or "none"
Needs you: <one line per question, with my recommendation> — or "nothing"
Allowance: week <n> % (<+d> since the last report), session <n> %
Next: <the next action, one line>
```
**The short layout** (on a channel such as Telegram, or when nothing changed but time):
```
<slug> step <n>/<m> · <phase> <used>/<bound> min · <landed>/<total> landed · past bound: <none | what> · needs you: <nothing | what> · week <n> %
```
A report says what changed since the last one first; an unchanged table is not repeated, the short layout
says it instead.
## The context of the lead's own session
At the end of each phase, and whenever the session's context grows large or spread over unrelated work, the
lead prepares a `/clear` as the mesh's instruction "prepare before clear" says: a save point with the
feature's phase, its branches and heads, the context files' paths, the agents' ids, the wait list and the
next action; then the prompt the operator pastes. The context files make the feature resumable after a clear.
## Issues that stop
An issue stays in `fixing` only while an agent works on it. A step that stops, for a wait past its bound, a
hand-over, or the session's end, moves each of its issues not delivered back to `open` with
`issue-tracker.move` and a note saying how far it got (its branch, its last commit, what is left). A list of
issues in `fixing` that nobody works on reads to the operator as stuck work.
## How it is checked
- A feature's issues show their commits on the feature branch (`git log --grep 'issue <n>'`), and no pull
request into a feature branch exists. A pull request per issue, or an agent waiting on a merge check in
phase 1, is the failure this playbook prevents.
- A context file exists per touched repository under `.work/<slug>/` while the feature runs.
- After a feature's delivery, `git branch -r | grep feat/<slug>` and `git worktree list` return nothing for it.
- More than one open pull request in a repository that share no feature name, or a feature step whose issues
stay in `fixing` for more than a working day, is the smell: stop and bring it to the operator.
- A review report that asks a change outside the issues' done-when, or a fourth round, is the failure of the
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
mark it.
- A pull request opened into a repository whose release branch was in flight and shared a file with it is the failure of
*Is the coast clear?*; the lead's report names the check it made before the push.
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
the failure of phase 3's fourth step.
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
missing sibling worktree, not a mesh fault.
When this playbook meets a problem, the lesson is added here, so the next feature avoids it.