Correcting my own framing. The modules are a graph, not a flat set: several build from one repository, and some are the base another compiles on. Firing a build per changed module starts work that cannot succeed yet and reports one cause as a failure per dependent. Observed catching the mesh up by hand today — a compiler base had to move first, and when it failed the right behaviour was for its fifteen dependents to wait, not to fail identically. So what reacts to the forge's event has to resolve what changed into an order and hold a dependent while its base is unbuilt. That is a bigger thing than "rebuild what the commit touched", and cheaper to know now.
85 lines
4.4 KiB
Markdown
85 lines
4.4 KiB
Markdown
---
|
|
status: open
|
|
opened: 2026-09-27
|
|
located-in: []
|
|
fixed-by:
|
|
amended-design:
|
|
---
|
|
|
|
# 131 — Nothing tells the mesh a source moved, and it reports itself current anyway
|
|
|
|
## What was observed
|
|
|
|
Six changes were merged to the trunk of six repositories in one sitting. The build machine built
|
|
nothing. Its last build, minutes before the first merge, was still the one it reported; no build was
|
|
requested, refused or failed, because none was ever asked for.
|
|
|
|
Asked afterwards what was wrong, the mesh said:
|
|
|
|
> 4 machine(s), all doing what they were told, all heard from, running what the mesh would send them,
|
|
> and every module current with its source
|
|
|
|
Every one of the six had moved. The last clause was false for all of them, and it is the clause a
|
|
person reads to decide whether there is anything to do.
|
|
|
|
## Why it matters beyond this instance
|
|
|
|
**The mesh learns a source moved by being told, and there is no longer anything to tell it.** The
|
|
command exists — a person names the module and the commit — and so does the question the overview
|
|
answers. What is missing is whatever used to connect the two. One repository still carries a forge
|
|
webhook aimed at a port; the rest carry none, and the port belongs to a different service than the
|
|
one the arrangement implies. So the state is not "the trigger is broken" but "there is no trigger,
|
|
and nothing says so".
|
|
|
|
**A wrong answer is worse here than no answer.** "Every module current with its source" is
|
|
indistinguishable, to a reader, from a mesh that has genuinely caught up. The overview is built to be
|
|
the thing you check instead of checking by hand, so a confident false negative removes the habit that
|
|
would otherwise have caught it. Nothing in the mesh is at fault for being out of date — it is at
|
|
fault for saying it is not.
|
|
|
|
**It is also why "current with its source" cannot be a stored fact.** The mesh compares what it built
|
|
against what it was last told the source was, and calls that agreement. Two facts agreeing tells you
|
|
nothing when both come from the same place.
|
|
|
|
## The intended shape, which is decided and not built
|
|
|
|
The forge emits what happened to it — a pull request merged — and the build machine reacts by
|
|
building what that commit affects. That keeps the forge ignorant of the build system and the build
|
|
machine ignorant of the forge's internals, which is the same argument
|
|
[ADR 0126](../../02-DECISIONS/0126-a-module-declares-its-own-seats.md) makes for addressing an event
|
|
to its emitter: the merge is a fact about the forge, and what should be rebuilt because of it is not
|
|
the forge's business to know.
|
|
|
|
The forge's module already declares the event. The build machine declares that it consumes nothing.
|
|
|
|
## What the trigger cannot be
|
|
|
|
**Not one build per changed module.** The modules form a graph: several are built from one
|
|
repository, and some are the base another is compiled on — a runtime image, a compiler base, a
|
|
repository whose context a second module builds from. Firing a build for each changed module
|
|
independently would start work that cannot succeed yet and produce a failure per dependent, for one
|
|
cause.
|
|
|
|
Observed while catching the mesh up by hand on 2026-09-27: a compiler base had to move before
|
|
anything compiled against it could build, and when it failed, the right behaviour was for its
|
|
dependents to wait rather than each fail the same way. Fifteen modules shared the cause. A trigger
|
|
that reports it fifteen times has buried it.
|
|
|
|
So whatever reacts to the forge's event resolves what changed into an order, builds the bases first,
|
|
and holds a dependent while its base is unbuilt or failed. That is a larger thing than "rebuild what
|
|
the commit touched", and knowing it now is cheaper than discovering it from fifteen identical
|
|
failures.
|
|
|
|
## Open questions
|
|
|
|
- Is "the source moved" still a thing a person can assert by hand once the event path exists, or does
|
|
the hand-operated form become the thing that made this failure possible?
|
|
- Which commit does the build machine act on — the merge, or each commit it brought — and what does
|
|
it do when several arrive for one module at once?
|
|
- How does the overview stop being able to lie? Comparing what was built against what was recorded
|
|
will always agree. Whether the trunk has moved is a question only the forge can answer, so either
|
|
the overview asks it, or it stops claiming to know.
|
|
- Does this want to be the same mechanism as the build request on the bus
|
|
([ADR 0129](../../02-DECISIONS/0129-a-seat-carries-the-protocol-of-its-role.md)), or does it sit in
|
|
front of it?
|