Commit Graph
2034 Commits
Author SHA1 Message Date
jschoubben 099605ec70 mesh-delivery-gate: the Approve's ask says the check's actual state at its heads, never a pass it has not had (issue 1733)
mesh/delivery merged: source.main moved to novox/mesh-catalog@53bf4bb84cb1
mesh/check checking 099605ec70a2 on 53bf4bb84cb1
With check-gates-merge false a head is ready and asked before any verdict exists, yet the ask said "<pr> passed its
checks" (a group: "passed its checks"): on 2026-10-26 the operator approved mesh-delivery #79 and a six-repository group
on that claim while their checks had not answered.

The ask now reads the checker's verdict at exactly the heads it covers (checkAt, beside checkerAt): "passed its check"
only for a pass there; otherwise "its check has no verdict yet[: it is running (since HH:MM UTC)]" or "its check failed:
<first failure>", and the Approve clause says it merges "now, before its check ends" or "although its check failed".
While the check gates no merge, a pending ask whose check then passes or fails (or loses a pass it named) is withdrawn
and asked again in new words (the ask's AskCheck against the state now, endStaleAsks, the review-record path's
withdrawAsk); a check that starts running is no new word, so the wait stays one message. Whether a merge waits is
unchanged. The gate's log lines and stalled lines that claimed a pass for a ready head say the same state.

Quick fix: replace "passed its checks" by neutral words in the two summaries. Thorough fix: one reader of the check's
state at the ask's heads (checkAt) used by every text that names it, and the ask re-said when that state changes.
Chosen: thorough, as it costs one helper and one case in endStaleAsks, and the quick one would still leave a pending
ask silent about a failure that came after it.

Tests: rows in TestAnApprovedPullRequestIsMergedThroughTheMergeTool (gated pass; ungated no verdict, running, then
passed, then failed) and the ungated group's wording; no new test function.
2026-10-26 22:18:08 +01:00
jschoubben b1413949f0 Merge remote-tracking branch 'origin/main' into feat/1126-nodes-compose 2026-10-26 21:56:51 +01:00
mesh-tools eba4bab00a Merge pull request 'The image build context is the module's own directory, so a Dockerfile in a subdirectory builds (issue 1703)' (#512) from fix/1703-image-context into main 2026-10-26 20:36:08 +00:00
jschoubben 8e116cb0e6 Merge main into fix/capacity-follows-cpu-share; pin the build modules at mesh-sdk 805b4d9
mesh/delivery merged: source.main moved to novox/mesh-catalog@216701fcbace
mesh/delivery-group group fix/capacity-follows-cpu-share merged: every member is merged
mesh/check checking 8e116cb0e6e4 on 7c5c29421f02 | novox/mesh-catalog#511 in group fix/capacity-follows-cpu-share
Main's #508 (the binary refusal) pinned mesh-sdk fe11db9; 805b4d9 is the capacity work merged with
sdk main, so it holds both.
2026-10-26 21:29:33 +01:00
jschoubben dcf32576a8 mesh-build-image: build with the module's directory as context, so a Dockerfile in a subdirectory finds its COPY paths (issue 1703)
mesh/delivery merged: source.main moved to novox/mesh-catalog@eba4bab00aa7
mesh/check checking dcf32576a880 on eba4bab00aa7
photos' admin-client, client and server Dockerfiles live in subdirectories and copy
paths from the module's root (admin-client/..., client-server/serve.mjs), as build-agent
built them and as the fingerprint reads the module's whole directory. Taking the
Dockerfile's own directory as context failed every such COPY with copier: stat
"/admin-client/package.json": no such file or directory, on shanks and on ace.

Quick fix (rejected): move photos' Dockerfiles to its repository root; it changes the
operator's photo application and leaves the trap for the next module.
Thorough fix (chosen): one context for every image, the module's directory; it never
leaves that directory, so the isolation of ADR 0487 section 2 holds.
2026-10-26 21:25:24 +01:00
jschoubben 3f8b0b4248 Build modules take asks only within their node's build hours
mesh/delivery-group group fix/capacity-follows-cpu-share rejected: composed together: the checker's verdict at the members' heads (63694fe9222d): unit: ..test
mesh/delivery closed: a newer head of the same pull request
mesh/check checking 3f8b0b42480b on 7c5c29421f02 | novox/mesh-catalog#511 in group fix/capacity-follows-cpu-share
mesh-build-go, -node and -image declare build-hours (node=HH:MM-HH:MM in the node's local time,
empty = any hour) and hand it to the SDK puller (the operator, 2026-10-26: g14 builds only from
18:00 to 06:00); their SDK pin moves to mesh-sdk d00dac1, which has it.
2026-10-26 21:22:09 +01:00
mesh-tools 7c5c29421f Merge pull request 'mesh-issues: a milestone or commit link moves no issue and keeps no worker current (issue 1781)' (#510) from fix/1781-moved-ignores-milestone-links into main 2026-10-26 20:17:09 +00:00
mesh-tools 3690c149c4 Merge pull request 'Forge rights read as the user sees them; write-only grant for mesh-tools; progress answers in minimal detail (issues 1945, 1947)' (#509) from fix/progress-and-unwritable into main 2026-10-26 20:08:05 +00:00
mesh-tools 5b75233406 Merge pull request 'The catalogue's check uses the shared binary refusal, commit by commit (issue 1577)' (#508) from fix/1577-checker-refuses-binaries into main 2026-10-26 19:32:31 +00:00
jschoubben 1faf317069 Review of L2: the vault's own fails closed: a pair credential's consumer is read standing, the shared value goes only to a holder its record names, and unread assignments refuse, never hand (C1, C2); the placement check pins mesh-sdk 3968849 (issue 1126, ADR 0550 §5)
mesh/delivery closed: a newer head of the same pull request
mesh/check checking 1faf31706919 on 5b75233406fe | novox/mesh-catalog#505 in group feat/1126-nodes-compose
2026-10-26 20:12:21 +01:00
jschoubben 245143d948 Build modules run at most as many steps as their node's build CPU gives, and say a check's phases
Each of mesh-build-go, -node and -image declares cores-per-step (6, 2, 2) and hands it to the
SDK puller, which bounds the configured capacity by floor(slice quota cores / cores-per-step),
read live; thread limits and the status tools follow the effective capacity (issue 1806's
follow-up: three Go checks on shanks' 12-core slice starved past the 30-minute step bound).
mesh-build-go says its lint and test phases with the ask id (issue 1890).
2026-10-26 19:55:31 +01:00
jschoubben 851e8782d5 Nodes compose: the catalogue's placement files and their check, mesh-config reading placement, the vault's own and pair credentials, the forge's commit trees (issue 1126)
mesh/delivery closed: a newer head of the same pull request
mesh/check checking 851e8782d569 on da29f77b1081 | novox/mesh-catalog#505 in group feat/1126-nodes-compose
One commit for the branch feat/1126-nodes-compose of mesh-catalog: its 15 commits squashed so its history does not carry two compiled programs committed by mistake and removed later, mesh-config (5.5 MB) and checks/placement (6.2 MB) (issue 1577). The tree equals the former head 2db56067. The operator allowed this rewrite of the feature branch on 2026-10-26.
2026-10-26 19:49:39 +01:00
jschoubben 8530a9730f The build modules take mesh-sdk's report of programs left in a branch's history (issue 1577)
mesh/delivery merged: source.main moved to novox/mesh-catalog@5b75233406fe
mesh/delivery-group group fix/1577-checker-refuses-binaries merged: every member is merged
mesh/check checking 8530a9730fbc on 5b75233406fe
2026-10-26 19:47:38 +01:00
jschoubben ee48e5a01e gitea_get_file refuses a bad path before its size listing reaches the forge; the guard test expects the listing (issue 1577) 2026-10-26 19:32:00 +01:00
mesh-tools da29f77b10 Merge pull request 'The catalogue's check refuses a compiled program under modules/, and main tracks none (issue 1577)' (#507) from fix/1577-no-committed-binaries into main 2026-10-26 18:13:59 +00:00
jschoubben 854dbfb3f3 mesh-issues: a milestone or commit link moves no issue and keeps no worker current (issue 1781)
mesh/delivery merged: source.main moved to novox/mesh-catalog@7c5c29421f02
mesh/check being carried to 854dbfb3f3f0 on 7c5c29421f02 | from 3690c149c4ad
The seed linked 188 issues at once and every one read as moved at the seed's minute, hiding when each
really moved; on a worked issue the link also counted as its worker's activity. These links only place
an issue, so last-moved and the worker's activity leave them out.
2026-10-26 19:12:12 +01:00
jschoubben 69a3b3f7e0 The forge tools cut a request the forge never answers and refuse a file too big for an answer without fetching it: a 5 MB read stalled every read (issue 1577) 2026-10-26 19:03:18 +01:00
jschoubben 3cd826830b The build modules' fetch step says which changed files are compiled programs, so the checker can refuse them (issue 1577) 2026-10-26 19:00:54 +01:00
jschoubben 94dab68635 Refuse a compiled program under modules/, and untrack the two main held: build output reaches the catalogue only by a slip nothing caught (issue 1577)
mesh/delivery merged: source.main moved to novox/mesh-catalog@da29f77b1081
mesh/check being carried to 94dab6863523 on da29f77b1081 | from 5a4ac4991395
2026-10-26 18:43:46 +01:00
jschoubben 76e4ec4dc6 mesh-issues and mesh-knowledge: milestones are records of the issue tracker, and progress reads them (ADR 0493 §1 to §4, issue 1781)
mesh/delivery merged: source.main moved to novox/mesh-catalog@5a4ac4991395
mesh/delivery-group group feat/1781-milestone-records merged: every member is merged
mesh/check checking 76e4ec4dc680 on 26908a89506f | novox/mesh-catalog#506 in group feat/1781-milestone-records
mesh-issues keeps each design's milestone in the state milestones (history 5), says milestone-set and
milestone-moved, and serves milestones, milestone-set and milestone-move. An issue's milestone is its own link
of kind milestone, so at most one milestone per issue is checked inside the issue's own write; kind commit
links a fixing commit. The triage links no milestone, pull request or commit. import with milestones=N seeds
a design's table once. mesh-knowledge's progress reads issue-tracker.milestones and its table parse is gone.

Squashed from four commits so the branch history does not carry a compiled bundle that was committed by
mistake (6 MB); the path is now in .gitignore.
2026-10-26 18:42:51 +01:00
jschoubben c584dc57b9 gitea: mesh/check is the mesh's own status and never blocks; signed commits, an outdated branch and a rejected review are said as blocking the mesh's merge (issue 1945, review round 2)
mesh/delivery merged: source.main moved to novox/mesh-catalog@3690c149c4ad
mesh/check being carried to c584dc57b95e on 3690c149c4ad | a compiled program is not refused: mesh-build-node reported no programs
2026-10-26 18:37:02 +01:00
jschoubben e1e5a8ff0d gitea: mesh-tools writes a user's delivered repository and main's rule stays the operator's: only its merge whitelist gets mesh-tools, read back; what else blocks the mesh's merge is said (issue 1945, the operator's answer 2026-10-26 18:30) 2026-10-26 18:34:03 +01:00
jschoubben c85472285d gitea: main's rule read back must say what was written, since the forge silently drops a whitelist login that cannot write (issue 1945, review round 1) 2026-10-26 18:23:42 +01:00
jschoubben f0fbe193fa gitea: mesh-tools administers a user's delivered repository and puts main's rule right, permissions read as the account sees them; knowledge-base.progress: minimal answers leave items to the tree, failed calls warn before parse faults (issues 1945, 1947) 2026-10-26 17:59:34 +01:00
mesh-tools 26908a8950 Merge pull request 'knowledge-base.progress: how far a design, milestone, issue or record has come, in one call (issue 1947)' (#504) from feat/1947-progress into main 2026-10-26 16:42:30 +00:00
jschoubben 87fe2c45cf Knowledge base: progress counts an issue done only once its fix is delivered, and says every gap (issue 1947, review round 1)
mesh/delivery merged: source.main moved to novox/mesh-catalog@26908a89506f
mesh/delivery-group group feat/1947-progress merged: every member is merged
mesh/check pass 87fe2c45cfed on 26908a89506f | carried from 27a7757b970e, hq 3a5c4c7c4d9c | unit 2091 run, 2327 kept, 6 skipped | integration 2112 run…
A resolved issue whose delivery is held or failed is stuck, one merged and not delivered
is moving; a row the tracker did not answer, an answer that does not read and linked
issues cut by the list's limit are said as warnings instead of passing silently.
2026-10-26 17:02:47 +01:00
jschoubben 24b244bc88 mesh-delivery-gate: ask no Approve of a merge the forge account cannot carry out, and say why (issue 1945)
mesh/delivery merged: source.main moved to novox/mesh-catalog@27a7757b970e
mesh/check pass 24b244bc88dc on 27a7757b970e | carried from 6b6d5cba7195 | unit 2046 run, 2327 kept, 6 skipped | integration 2066 run, 2346 kept, 10 s…
car-hunter #2 was approved and its commit status then refused 403. Before the ask the
gate reads merge.writes for each repository it covers; where the merging account cannot
write, nothing is asked, the delivery waits on 'the forge account cannot write <repo>:
gitea_grant_write' and a condition is raised. gitea.repo.writable reads it again and
asks an approved, refused merge of it again.
2026-10-26 16:39:56 +01:00
jschoubben 5baf8ad1d7 Knowledge base: progress is proven over the bus with the module started whole (issue 1947)
The verb asks three seats and the records module; only a run over a real bus shows its
grants and subjects line up with what the manifest invokes.
2026-10-26 16:39:19 +01:00
jschoubben 8da33e43d4 Knowledge base: progress says how far a design, milestone, issue or record has come (issue 1947)
A lead's five-minute report and 'is design 47 nearing its end' were joined by hand from
the design file, the tracker and the deliveries. One verb now works the state out
(ADR 0424 §1), minimal for every five minutes, detailed for the report's tree.
Milestones are read from the design's table until the tracker's milestone records
(issue 1781) are delivered.
2026-10-26 16:37:54 +01:00
jschoubben 52de4c320e gitea: the merging account writes every repository that builds a registered module, read from the indexer's modules (issue 1945)
car-hunter #2 was approved and its commit status refused 403: mesh-tools only read the
repositories of a user. It is now a write collaborator on each repository the indexer's
modules state names (watched over the bus: at the start and on each registration), read
back and said as gitea.repo.writable; the operator's other repositories stay read-only.
gitea_grant_write and gitea_unwritable_repos do and show it by hand; gitea_commit_statuses
answers merge.writes.
2026-10-26 16:36:50 +01:00
jschoubben 5e516317e9 Issue tracker: list rows say when each issue last moved, and list takes linked (issue 1947)
The knowledge base's progress verb reads a milestone's issues in one call and must say
when each last moved, and the issues linked to a record or a design; neither was
readable without one get per issue.
2026-10-26 16:29:56 +01:00
mesh-tools 6b6d5cba71 Merge pull request 'Image builds run their RUN steps on pasta, and every build failure keeps its real error (issue 1703)' (#502) from fix/1703-image-error-shown into main 2026-10-26 14:48:17 +00:00
mesh-tools 8393e29621 Merge pull request 'An approved group merges whole or not at all, and two groups never interleave in one repository (issue 1275)' (#501) from fix/1275-group-merge-whole into main 2026-10-26 14:47:34 +00:00
jschoubben 071c6885d9 The mesh's forge accounts all read every repository, and a build's fetch says the forge's own words
mesh/delivery merged: source.main moved to novox/mesh-catalog@61563abf2f93
mesh/delivery-group group fix/fetch-reads-all merged: every member is merged
mesh/check checking 071c6885d923 on 8393e2962193
mesh-catalog #495 gave read on every repository to the tools' account alone. The build modules
fetch over ssh as nox-builder (the forge-account provider's builders account, ADR 0466 §3), so
ace's and g14's fetch of jschoubben/car-hunter and jschoubben/snake still failed; the machines'
agents (nox-agent, ADR 0410 §1) could not read them either.

- gitea: readall.ts grants every account of one list, meshAccounts in tools-account.ts (mesh-tools,
  nox-builder, nox-agent; a Go test holds the two Go names to internal/forgeaccount's constants),
  on the same start pass, forge events and tools. gitea_unreadable_repos answers per account and
  names the accounts the forge does not hold yet; gitea_grant_read takes accounts as well as
  repositories. An absent account is asked nothing; the start pass runs again ten minutes apart
  until every account was there once.
- mesh-build-go, mesh-build-node, mesh-build-image: pin mesh-sdk ff81bdf8 (fix/fetch-reads-all),
  whose forgekey.Said keeps git's words past the bare "error:" line: the mirror's line said only
  "git -C: error:". Their own git reasons (ls-files, ls-remote, rev-parse, repack) go through it too.
2026-10-26 15:27:38 +01:00
jschoubben 8c5f27627b mesh-build-image: give a RUN step pasta's network, since the default netavark bridge cannot be set up rootless (issue 1703)
mesh/delivery merged: source.main moved to novox/mesh-catalog@6b6d5cba7195
mesh/check checking 8c5f27627b67 on 6b6d5cba7195
Every RUN failed before it started: 'setup network: netavark: nftables error ... Could not process rule'. Reproduced on
shanks with buildah 1.45.2, a clean environment and a private XDG_RUNTIME_DIR; --network pasta builds, and reaches the
network from a RUN. The sysrq integration row now fails if the RUN never started.
2026-10-26 15:23:19 +01:00
jschoubben 82bd6f49ff A half-merged group keeps its repositories until whole or declined, and the operator's word does not ask it again while another pass it would wait for is under way (issue 1275, review round 1)
mesh/delivery merged: source.main moved to novox/mesh-catalog@8393e2962193
mesh/check checking 82bd6f49ff9c on 8393e2962193
A held half-merged group did not count as under way, so another group sharing a repository could start; asked
again with delivery_merge_again, each then waited on the other. Passes are now read from every approved,
undeclined Approve not merged whole (approvedMerges leaves out merged and refused members), and
delivery_merge_again is refused while passWaits names a pass, naming it. The forge's mergeable is also false
for a work in progress: said so.
2026-10-26 15:23:01 +01:00
jschoubben 98c66fb1e4 Build modules: a failed command's reason says its error, not its last progress line (issue 1703)
buildah writes STEP lines on stdout and its error on stderr, so the last line of both hid every image build's cause.
mesh-build-image's reason is now stderr's last lines (600 bytes) with the exit status, and the journal gets both tails;
mesh-build-node keeps stderr's end and stdout's start apart; mesh-build-go's cause skips go build's '# package' line.
2026-10-26 15:21:01 +01:00
jschoubben 07ec186031 Merge an approved group only when every member merges now, and let no other merge land between its members (issue 1275)
On 2026-10-26 13:40 group fix/734-lost-ask merged two of its three members: the forge answered mesh-delivery#73's
merge 405 "Please try again later", and in the seconds between, group feat/890-placement merged mesh-delivery#72,
so #73 then conflicted.

- mesh-delivery-gate: before any member is handed, every member is read for its required statuses, its head still
  the approved one, and the forge's own mergeable (in conflict, or still being worked out); the forge's "no" is asked
  again every 5 s for 2 minutes, then the group is held and said urgent with nothing merged.
- mesh-delivery-gate: an approved merge waits while another approved merge's pass is under way into a repository it
  goes into (handed until merged whole, or stopped), whether or not mesh/check gates merges (it waits for a merge,
  never for a check: ADR 0551).
- mesh-delivery-gate: tool delivery_merge_again asks a refused or held merge again on the operator's word.
- gitea: the merge asks again after the forge's 405 "Please try again later" (1 s, 2 s, 4 s), and a pull request
  carries the forge's mergeable, which gitea_commit_statuses answers.
2026-10-26 14:53:22 +01:00
jschoubben 2aecbe8055 Merge main into fix/build-cpu-yields; pin mesh-sdk at its head (ADR 0553, ADR 0554)
mesh/delivery merged: source.main moved to novox/mesh-catalog@ceb3aac9b39a
mesh/delivery-group group fix/build-cpu-yields merged: every member is merged
mesh/check being carried to 2aecbe80553c on ceb3aac9b39a | from 9a8e54d988fe, mesh-host bba9081ca127
2026-10-26 14:47:27 +01:00
jschoubben 3def293d94 Build modules: no thread limit without the composer's share; with it, the share over their own capacity (ADR 0553 round 2)
Change A rebuilds the three build modules, so their runtimes restart once; it
changes nothing else about their builds until change B gives them the share.
2026-10-26 14:41:12 +01:00
mesh-tools 9a8e54d988 Merge pull request 'mesh-build-go says which packages it cannot test here, and mesh-build-node's tests need the Node toolchain (issue 890, ADR 0552)' (#498) from feat/890-placement into main 2026-10-26 13:40:41 +00:00
mesh-tools 2da9329df4 Merge pull request 'pacman: the round and the history tools say in plain words what they answer' (#497) from fix/pacman-findable into main 2026-10-26 13:39:16 +00:00
jschoubben ecbee53cfd Merge main into fix/build-cpu-yields; pin mesh-sdk at its head (ADR 0553) 2026-10-26 14:23:33 +01:00
jschoubben dcdf4238c7 Build modules: no cap of their own; a step's threads are its part of the node's one share (ADR 0553, issue 1806)
Review round 1: a cap per module let three build modules take three shares
of the node. The share is now one node value held by the node-engine's
yielding slice; each step divides it by every build slot of the node, from the
composer's words, or assumes every build seat at its own capacity without them.
2026-10-26 14:22:05 +01:00
jschoubben d3423f54ed mesh-build-go: resolve the go.mod and go.sum the main merge left in conflict; pin mesh-sdk 33395f68 (issue 890)
mesh/delivery merged: source.main moved to novox/mesh-catalog@9a8e54d988fe
mesh/delivery-group group feat/890-placement merged: every member is merged
mesh/check checking d3423f54ed58 on 9a8e54d988fe | novox/mesh-catalog#498 in group feat/890-placement
2026-10-26 14:06:37 +01:00
jschoubben 0e322d087f mesh-build-go: pin mesh-sdk 33395f68, feat/890-placement merged with main (issue 890) 2026-10-26 14:05:38 +01:00
jschoubben 0300a6fd99 pacman: drop the plain-word phrases from replaces (it holds shell commands only, ADR 0245); the descriptions' first lines carry them
mesh/delivery merged: source.main moved to novox/mesh-catalog@2da9329df448
mesh/check being carried to 0300a6fd99b5 on 2da9329df448 | from b1e610b2135a
2026-10-26 14:04:09 +01:00
jschoubben d21b81b00a mesh-build-go: node-build-node also needs bubblewrap and a toolchain installed whole (its mark and lock), as mesh-build-node's integration tests do; pins mesh-sdk 45564e69 (issue 890, review round 1) 2026-10-26 14:02:27 +01:00
mesh-tools b1e610b213 Merge pull request 'Build modules end the steps a previous process left running, and serve build_<lang>_step_end (issue 1890)' (#496) from fix/1890-left-running-steps into main 2026-10-26 12:57:34 +00:00
jschoubben 0134697f97 Build modules: the round ends asks past the step bound; pin the sdk head (issue 1890)
mesh/delivery merged: source.main moved to novox/mesh-catalog@b1e610b2135a
mesh/delivery-group group fix/1890-left-running-steps merged: every member is merged
mesh/check pass 0134697f9739 on b1e610b2135a | carried from a4f5df797b68, mesh-sdk b4cd95e7c4a4 | unit 3132 run, 3022 kept, 7 skipped | integration 31…
2026-10-26 13:52:53 +01:00