Commit Graph
1950 Commits
Author SHA1 Message Date
jschoubben e7aaa8420e Vault: name a hash record's secret in a field called of, so the runtime accepts it
mesh/delivery merged: source.main moved to novox/mesh-catalog@3ded9e780043
mesh/check pass e7aaa8420eac on 3ded9e780043 | unit 2018 run, 2325 kept, 5 skipped | integration 2040 run, 2344 kept, 9 skipped | over bound: unit, in…
The runtime refuses a state field whose name ends in secret, so no bus-account hash could be written on novox. The test state now applies the same check.

Issue: 1945
2026-10-26 09:25:35 +01:00
jschoubben 1c55e5d44d Vault: take and hash a process's own bus account (broker-<process id>) as a covered account, so take-over is not held by every process user
mesh/delivery merged: source.main moved to novox/mesh-catalog@22381d75224f
mesh/check failed: integration: meshbuildnode/cmd/mesh-build-node.TestAFixtureBundleBuiltTwiceHasOneDigest: no toolchain of this lock is installed und…
The controller hands each process account of a core or moved module with origin issued (ADR 0436 §2); the vault took
only broker and provisioner-broker, refused these and never hashed them. Owed hashes are now said once per pass, and
account_hash says who asked when it refuses too (review round 1).

Issue: 1945
2026-10-26 02:35:57 +01:00
jschoubben 32b912cfe5 Vault: hash each bus account it is handed into bus-accounts.<user>, once per generation, so the grants part can compose the user list without the controller
The controller still mints each covered account and hands it to the vault (ADR 0374); ADR 0547 clause 9 has the vault
write the bcrypt hash of what it holds into its own state, readable by the grants part, and say account-hashed. It
hashes on keep, at start every held account with no key of its generation, and again by hand (account_hash); a refused
write is owed and written at the next pass. secret_own says per bus account whether this generation's hash is written.

Issue: 1945
2026-10-26 02:28:28 +01:00
jschoubben e572937d97 Vault: secret_own reads the module-own secrets it keeps, as fingerprints, so a generation can be told without the value
mesh/delivery closed: a newer head of the same pull request
mesh/check pass e572937d97fa on 567736f7795a | unit 2143 run, 2198 kept, 5 skipped | integration 2165 run, 2217 kept, 9 skipped | over bound: unit, in…
Issue: 1945
2026-10-26 02:09:03 +01:00
jschoubben e901769cb2 Read the newest steps first: sort the node's keys by id (start order) before the cut, and say older steps were not read
mesh/delivery merged: source.main moved to novox/mesh-catalog@567736f7795a
mesh/check failed: integration: meshbuildnode/cmd/mesh-build-node.TestAFixtureBundleBuiltTwiceHasOneDigest: no toolchain of this lock is installed und…
The review found a cut read took an arbitrary 1000 keys, so the newest steps could be missing. A step id is
base-36 milliseconds plus random digits, so its string order is its start order; the newest max(limit*4, 100)
keys are read now, 1000 at most. The toolchains read logs when it drops keys past its cap.
2026-10-26 00:43:53 +01:00
jschoubben 8f9c78bcba Read only the node's own steps, in parallel and bounded, so build_*_steps answers within the call's 30 s (issue 1827)
On a steps state of 1164 keys / 20 MB (mesh-build-node: 10034 keys) the read tools listed every key and
then read each value one round trip at a time, filtering by node only after the Get, so they timed out
at 30 s. Now the keys are filtered by the node's prefix before any Get, the values are read 16 at a
time, at most 1000 a call (the answer says it was cut), and one log line gives rows read and time.
build_*_toolchains reads its values the same parallel way. The kind: a read tool that reads a whole
state key by key; every read tool of the three modules is covered.
2026-10-26 00:39:33 +01:00
jschoubben 363a3d3f7e Provisioner client: drop a module's held vault secrets when it leaves or is placed again, so it asks afresh (issue 1945)
mesh/delivery merged: source.main moved to novox/mesh-catalog@82e7e3e32675
mesh/check pass 363a3d3f7e8f on 82e7e3e32675 | unit 2015 run, 2322 kept, 5 skipped | integration 2037 run, 2341 kept, 9 skipped | over bound: unit, in…
A re-assigned module was filled with the generation it held before the vault minted a new one; the bus refused the account.
2026-10-26 00:03:43 +01:00
jschoubben 32ad59fc64 mesh-delivery-gate and gitea: a setting check-gates-merge; false asks a reviewed pull request's Approve and merges it without waiting for mesh/check
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check pass 32ad59fc6402 on 609013a2638f | unit 2010 run, 2322 kept, 5 skipped | integration 2032 run, 2341 kept, 9 skipped | over bound: unit, in…
The operator, 2026-10-25 22:56: "run the check locally only, but not as a gate, it loses us too much time". Tonight each
merge ask waited 3-7 minutes for mesh/check, and every merge into main refused the next approved merge for a check judged
on the trunk before (mesh-delivery#52). Both settings default to true, so nothing changes until the operator sets them.
False: the gate makes a reviewed pull request ready and asks its Approve with no verdict, a trunk's move puts nothing out
of date, a verdict is kept and shown, and a group still merges in one pass; the merge tool merges a head the Approve
names whatever its mesh/check says. delivery_status and show say the mode.
2026-10-25 23:07:50 +01:00
jschoubben 93f655dac9 mesh-delivery-gate: a merge learnt from the open list seconds after it landed moves its trunk and source.main; delivery_status shows source.main
mesh-delivery#51 merged 21:43:11 and the gate read the open list at 21:43:14, before the forge's merged event: taken as
learnt late, it moved no trunk and its group's finish left it out of source.main, so the checker kept judging every
mesh-delivery head on 73be3df. A late merge within replayLate of its landing is now taken as heard as it happened, and
one a gate before this left is written at the catch-up of the start (never backwards).
2026-10-25 23:01:37 +01:00
jschoubben d0566f9ade Fill a refused file again once the node-engine's declaration may let it through (ace, 2026-10-25 21:17)
mesh/delivery merged: source.main moved to novox/mesh-catalog@573a59e3cc07
mesh/delivery-group group fix/provisioner-retries-on-declaration merged: every member is merged
mesh/check pass d0566f9ade9a on 573a59e3cc07 | unit 2301 run, 3410 kept, 10 skipped | integration 2326 run, 3431 kept, 13 skipped | over bound: unit, …
The node-engine refused mesh-build-go's files as not named as filled 32 s before
its want arrived, and nothing filled them after the apply that named them: the
runtime crash-looped on its missing broker credential. The client now fills
every module again when the node-engine touches its write socket after such an
apply (mesh-host fix/provisioner-retries-on-declaration), says each retry and
each refusal it waits on, and asks the vault again at once for a refused secret
when that wake or the module's own assignment may have ended the refusal.
2026-10-25 21:42:34 +01:00
jschoubben 9d9dfda19b Merge pull request 'Gate: hand every member of an approved group in pin order, settle pull requests closed on the forge, and say a stopped pass as a condition (issue 1275)' (#480) from fix/1275-group-hands-every-member into main
Reviewed-on: #480
2026-10-25 19:28:33 +00:00
jschoubben 4e82a824be Announce the pauses state in the three build modules, and pin mesh-sdk 518dae5 (an unreadable pause pulls as not paused)
mesh/delivery-group group fix/steps-bucket-ages held: a member is held: novox/mesh-sdk@518dae5ec9c8 (merged without a passing check: only a person decides what…
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check pass 4e82a824be7a on cdbe2945cf6e | unit 1994 run, 2322 kept, 5 skipped | integration 2016 run, 2341 kept, 9 skipped | over bound: unit, in…
Without it in Kept, stdio.KeptState refuses the state before the bus (mesh-sdk go/keeps.go
refusedUnannounced), so the pause could be neither read nor written.
2026-10-25 18:57:08 +01:00
jschoubben 78d26867d2 Give the build modules' steps state an age of two days, and keep a node's pause in a pauses state of its own
mesh-build-go's steps bucket filled to the bus's 64 MiB cap (27,370 keys, none ever removed) and
refused the end of a passed check, so the check read failed; mesh-build-node's (17.8 MB) and
mesh-build-image's grow the same way. A step's key is per step: its reader reads its end within
the step's bound, and a check's verdict is kept by the checker, so two days is ample. The node's
pause key lived in the same bucket and would have ended by itself; it moves to a pauses state
without an age (mesh-sdk fix/steps-bucket-ages, Puller.PausePut). No node is paused today, so
nothing is carried over.
2026-10-25 18:53:04 +01:00
jschoubben 0c216d99d0 Gate takes a merge learnt after the fact as past: no trunk move, the forge's time, never source.main (issue 1275, review round 2)
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check pass 0c216d99d0c0 on 9d9dfda19b7e | unit 2181 run, 2147 kept, 5 skipped | integration 2203 run, 2166 kept, 9 skipped | over bound: unit, in…
A pull request found merged only by its absence from the open list went through PullMerged, which moved every
other open delivery of its repository back to an old trunk (ready ones to proposed, composed checks out of
date), dated the merge now, and so let a later catch-up write the old commit into source.main. pullMerged now
takes such a merge as late: its own delivery is merged and its group closed, no other trunk moves, its time is
the forge's or none, and LearntLate keeps it out of source.main in finish, settleForgeMerges and the catch-up.

The gitea tool gitea_commit_statuses now answers the pull request's merged_at, and the gate reads a gone pull
request by its number alone, so a deleted branch does not fail the read.
2026-10-25 18:37:59 +01:00
jschoubben 145c54d19c Gate settles pull requests closed with no event, looks again at a line's bound, and keeps a waiting head's condition over a restart (issue 1275, review round 1)
The conditions the gate now says would otherwise be wrong three ways:

- A pull request closed or merged on the forge with no event heard stayed ready here for days (de-spiegel #4,
  closed 2026-10-17) and would raise a condition. After a complete read of the open list (shorter than the
  forge tool's 1000), each delivery not final whose pull request is missing is read from the forge and taken as
  its close or merge; a merge learnt so does not move source.main, as it is undated and could move it back.
- A line that comes due on the clock (a state's bound, the author's bound, an answered refusal, an
  out-of-date refusal turning urgent after 10 minutes) waited for an unrelated event. The gate now asks a look
  at the earliest such time.
- After a restart the heads waiting on the forge start their bound again, so their conditions were cleared and
  raised again later. A condition is cleared only once the open list was read since start, and not while the
  forge still shows its head open and waiting.

Also: an empty path list ranks with a truncated one in the merge order, and a seat that keeps refusing
conditions is retried on the clock 10 looks in a row, then at events only, said once in the log.
2026-10-25 18:32:19 +01:00
jschoubben 67092161bd Gate hands every member of an approved group, in pin order, and says a stopped pass (issue 1275)
Met again 2026-10-25: group fix/puller-wakes-on-capacity was merged half. Three causes in the gate:

- The next member's turn compared the group's state with "delivering", a word GroupState no longer says
  since release 6 renamed it "merging" (ready.go groupTurnToMerge). Once the first member's merge was heard
  from the forge the group read merging, and the second member waited for ever. Group states are now named
  constants, the turn goes on in ready and merging (groupMayMerge), and a test holds every word to it.
- Members merged in id order, so mesh-catalog went before the mesh-sdk commit it pins. membersOf now orders
  by mergeRank: mesh-sdk first, then members that change no go.mod or go.sum, then those that do.
- No condition was raised: the controller's self-check that read `stalled` went with release 6
  (mesh-controller dc456d56). The gate now says its stalled lines as conditions itself on the
  operator-channel seat (ADR 0437 §9) after every look, clears those listed no more, and keeps which it
  raised in its new bucket conditions. A held group's line says "half merged" when a member merged.

A pass held for a required status no longer retries on a timer: the status turning success is the event
that asks the merge again.
2026-10-25 18:20:58 +01:00
jschoubben 23c827e791 Take the mesh-sdk head that wakes a puller on its capacity, within the test budget, in the three build modules (issue 1887)
mesh/delivery merged: source.main moved to novox/mesh-catalog@2df0503034dc
mesh/delivery-group group fix/puller-wakes-on-capacity merged: every member is merged
mesh/check pass 23c827e7910c on a85d90374195 | judged by the candidate's mesh-build-go at eab02c80fe86
2026-10-25 17:44:50 +01:00
jschoubben 3138570c6b Let the build modules follow their capacity on the bus, so a node raised from capacity 0 starts pulling (issue 1887)
g14's Go builder sat idle at capacity 2 because nothing woke its parked
puller. mesh-build-go, mesh-build-node and mesh-build-image now pin mesh-sdk
b9911dc1, whose puller watches the config value capacity as mesh-config
resolved it and wakes on each change, and hand it that watch.
2026-10-25 17:28:00 +01:00
jschoubben 1cc54959af nextcloud: repair the account only on a 401, never reset the throttle (issue 1253, review 2)
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check pass 1cc54959afcf on a85d90374195 | unit 1994 run, 2322 kept, 5 skipped | integration 2016 run, 2341 kept, 9 skipped | over bound: unit, in…
Resetting Nextcloud's brute-force record for the docker gateway cleared it for
every client behind that address: someone guessing passwords could drive the
throttle to 429 and have the module's poll wipe it. A throttle is no evidence
the password is wrong, so a 429 is now backed off only, and the back-off
outlasts the throttle. The account's existence is read from user:info's exit
status, since user:list pages.
2026-10-25 16:57:46 +01:00
jschoubben 962bc359a7 nextcloud: repair only the module's own account, read its existence from the user list, no admin group (issue 1253, review 1)
occ's user:info says 'user not found' on stdout with an empty stderr, so the
error read as 'occ produced no output' and mesh-admin was never made on novox:
occ now says stderr and stdout both, and existence is read from user:list.
The repair could reset whatever account the user setting names, the
operator's included, and the 'admin' fallback is a hand-made install's human
administrator: only mesh-admin is repaired now, and it is the default. The
shares poll needs no admin rights, so the account gets no group. After a
repair the throttle of the caller's address is reset, and a failing repair
reaches the back-off's one loud line with occ's message.
2026-10-25 16:54:51 +01:00
jschoubben 67b13c42d3 nextcloud: repair the account on a throttle too, since a throttle follows refusals (issue 1253)
mesh/delivery closed: a newer head of the same pull request
mesh/check checking 67b13c42d32a on f27f4c8cd58c
Right after the delivery the first answer may be Nextcloud's 429, not a 401;
without a repair then the account would never be made and the back-off would
wait out a throttle that cannot end.
2026-10-25 16:40:54 +01:00
jschoubben 4021724ca4 nextcloud: make the mesh's own account match its secret when Nextcloud refuses it, and back off a refusal that stays (issue 1253)
The image creates NEXTCLOUD_ADMIN_USER only on a fresh install. novox's
instance was installed before the mesh adopted it, so mesh-admin was never
created there, and the shares poll asked Nextcloud every minute with a login
that cannot pass: 401, then Nextcloud's brute-force throttle (429), which
also held the backup before a delivery.

On a refused login the client now adds the account through occ (admin
group), or sets its password to the module's own secret, passing it by
OC_PASS so it is on no argv, and asks once more. A refusal that stays is
said once and the poll backs off from 5 minutes to an hour instead of nine
lines of XML every minute. An empty setting no longer becomes an empty name.
2026-10-25 16:40:01 +01:00
jschoubben 155124b59a mesh-build-go: a cause is the runtime's line at column 0, and only go's exact summary lines are dropped (issue 1901, review round 1)
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/delivery-group group fix/1901-package-cause held: a member is held: novox/mesh-catalog@155124b59af4 (merged without a passing check: only a person decides…
mesh/check pass 155124b59af4 on f27f4c8cd58c | unit 2015 run, 2883 kept, 5 skipped | integration 2037 run, 2978 kept, 9 skipped | over bound: unit, in…
An indented log line of another running test that held 'panic:' won over the
real timeout panic, since the lines were trimmed before matching. Go prints
the runtime's lines at column 0; a test's log is indented.
2026-10-25 15:58:07 +01:00
jschoubben 6ec6fdaad2 mesh-build-go: a race the race detector reports is a failure's cause, in a test or after PASS (issue 1901)
mesh-controller's try was worded 'PASS' again because the race detector
reported after the tests passed and the program exited 66. The cause is now
the race: its access, the frame that made it and where its goroutine was
created, instead of PASS or testing's generic 'race detected during execution
of test'. Tests from captured go test -race -json (1901/AC4).
2026-10-25 15:52:20 +01:00
jschoubben 663f3de975 mesh-build-go: a package that fails without an assertion carries its real cause, never "PASS" (issue 1901)
A try of mesh-controller kept 'PASS' as its only failure: the package's test
program stopped after printing PASS and the package-level failure took its
first line. Now a failure that is not one test's assertion names the tests that
were running and carries the panic line (a timeout's with its running tests),
a signal or fatal error line, a build's first error, or words saying the
program exited during which tests or after they passed; go test's summary lines
are never kept. Tests from captured go test -json of eight real failures
(1901/AC4).
2026-10-25 15:38:28 +01:00
jschoubben 53749833bf Fill every module again when the node-engine's socket returns and when the node's own composition moves, so a file an apply left empty is filled (issue 1945)
mesh/delivery-group group fix/r6-node-composition held: a member is held: novox/mesh-sdk@10b6e202320f (merged without a passing check: only a person decides wh…
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check checking 53749833bfbd on 2167b95a3699 | novox/mesh-catalog#476 in group fix/r6-node-composition
2026-10-25 02:02:02 +02:00
jschoubben ac6712cbb5 Pin mesh-sdk to feat/r6 748c564, which carries main's composer (issue 1943) 2026-10-25 00:02:45 +02:00
jschoubben 5b32342ac2 Merge main into feat/r6: keep R6's gate, which already carries #474's catch-up at start, and drop the seat and walk adoption R6 removed
The reads-outside markers, mesh-build-go's compose job and gitea's forge-account fix come in from main.
2026-10-24 23:03:42 +02:00
jschoubben 6fb0ceeef8 Merge pull request 'R4g finish: mesh-build-go's compose job, the reads-outside marker in the digest, merge-check.sh gone (issues 1295, 1621-1623, 1935)' (#473) from feat/r4g-finish into main
Reviewed-on: #473
2026-10-24 20:56:49 +00:00
mesh-tools c651161787 Merge pull request 'gitea's forge-account reads the forge's own host key file before scanning its sshd, so a forge restart no longer refuses every forge account (issue 1939)' (#472) from fix/1939-forge-host-key into main 2026-10-24 20:05:39 +00:00
jschoubben b67b5af5e6 Pin the gate to mesh-sdk feat/r6 at d7a9b968 (issue 1946) 2026-10-24 21:18:26 +02:00
jschoubben d700ceca20 Pin the gate to mesh-sdk feat/r6 at 7f9cc0e5 (issue 1946) 2026-10-24 20:43:41 +02:00
jschoubben 3a1017f559 Pin the gate to mesh-sdk feat/r6 at e45bdc08 (issue 1946) 2026-10-24 20:22:07 +02:00
jschoubben a17d0c8e93 The messenger holds and tells what the delivery view says is in motion, not the controller's plans (issue 1946) 2026-10-24 18:25:38 +02:00
jschoubben 9fa6710296 Pin the gate to mesh-sdk feat/r6 at a523a8cb (issue 1946) 2026-10-24 18:18:06 +02:00
jschoubben 05f849979c Match a fix to a delivered revision by what the gate says of its merge; keep #474's source catch-up at start (issues 1946, 1726) 2026-10-24 18:13:40 +02:00
jschoubben 4dee77df23 Pin the gate to the head of mesh-sdk feat/r6 (issue 1946) 2026-10-24 17:54:30 +02:00
jschoubben 8a79877a15 A newer delivered revision covers the older merges of its repository, as the forge says ancestry (issue 1946) 2026-10-24 17:03:20 +02:00
jschoubben 2139e83a8a Remove a binary built by mistake 2026-10-24 16:58:33 +02:00
jschoubben e7ca8f7af1 The backup module says on the bus when a backup asked for now has ended, so no one polls backed-up (issue 1944, ADR 0539 §16) 2026-10-24 16:58:19 +02:00
jschoubben eb79996336 The tracker derives a fix's delivered from the delivery view's event, not the gate's gone states (issue 1946) 2026-10-24 16:50:50 +02:00
jschoubben 1a271a1fb1 The group's integration test hears the forge's merges once both members are handed (issue 1946, R6-C3) 2026-10-24 16:43:48 +02:00
jschoubben 30d04f6bef Pin the gate to mesh-sdk's release 6 verb tables and prove it holds the seat as they have it (issue 1946, R6-C3)
The integration tests hear the forge's own word that a pull request merged, as the real flow does, and fail on any call of the controller.
2026-10-24 16:35:15 +02:00
jschoubben 5ff337e0dc Gate keeps the merge's six states and asks the controller nothing (issue 1946, R6-C1, C2, C4)
Release 6 deletes the plans: the walk half of the holder, the controller port, the carry-over of the former module and the verbs times, what-if, release, stop and retire-history go; the table holds proposed, ready, rejected, merged, held and closed; the delivery's status and view name the source revision the merge moved.
2026-10-24 16:26:36 +02:00
jschoubben 2fabbe556e Pin to the group's new mesh-sdk head bfc3883a, whose composer reads a fallback to a predefined key as the indexer does (ADR 0348 §7)
mesh/delivery delivered
mesh/delivery-group group feat/r4g-finish merged: every member is merged
mesh/check checking 2fabbe556e73 on 6fb0ceeef817 | novox/mesh-catalog#473 in group feat/r4g-finish
2026-10-24 14:57:35 +02:00
jschoubben 89b9212c4d Pin to the group's new mesh-sdk head 19c1d359, whose composer names the reader's pinned SDK instead of a bare (devel) (ADR 0482 clause 5)
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: shanks: novox/mesh-catalog#473: modules/mesh-build-go/go.mod names mesh-sdk 19c1d35939bc, which is neither on mesh-sdk's trunk nor …
2026-10-24 14:12:09 +02:00
jschoubben 40da368ee3 Date an adopted merge once, by the walk it was adopted from, so a later walk it follows never makes it look newer than a forge merge heard after it (issue 1726, review)
mesh/delivery delivered
mesh/check pass 40da368ee34e on ee216e4e63f1 | unit 246 run, 4189 kept | integration 228 run, 4249 kept | over bound: unit, integration (slowest unit …
2026-10-24 13:55:10 +02:00
jschoubben 865f3b6455 Say what pacman-tools reads outside: the root predefined.json (issue 1935)
mesh/delivery-group group feat/r4g-finish rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: shanks: novox/mesh-catalog#473: modules/mesh-build-go/go.mod names mesh-sdk bc0c25e51052, which is neither on mesh-sdk's trunk nor …
2026-10-24 13:48:18 +02:00
jschoubben 03524ecd13 Mark pacman-tools as reading outside its directory: its upgrade-order test reads the root predefined.json, which its digest does not cover (issue 1935) 2026-10-24 13:48:09 +02:00
jschoubben 15101c9ce6 Move source.main for a merge the gate caught up after a gap, so the checker re-checks open heads on the trunk that is (issue 1726)
The checker takes a repository's trunk head only from the gate's source.main. On 2026-10-24 gitea's
restarted poll announced mesh-catalog #471's merge while the gate was starting and could not yet tell
whether it held the seat; the gate acknowledged the event unread. It then adopted the controller's walk
of the merge commit, which carries no merge time, so every older merge of the repository looked newer
and source.main was never moved: #472 was checked on the trunk before #471 and its merge refused.

- An event heard before the gate can tell whether it holds the seat is offered again, not taken.
- An adopted merge is dated by its walk's creation, so it settles into source.main as a forge merge does.
- Each time the gate comes to hold the seat it weighs the newest merge of each repository against
  source.main once more, so a merge marked there and never written (as #471) is written; never backwards.
2026-10-24 13:41:56 +02:00