A lead's five-minute report and 'is design 47 nearing its end' were joined by hand from
the design file, the tracker and the deliveries. One verb now works the state out
(ADR 0424 §1), minimal for every five minutes, detailed for the report's tree.
Milestones are read from the design's table until the tracker's milestone records
(issue 1781) are delivered.
The knowledge base's progress verb reads a milestone's issues in one call and must say
when each last moved, and the issues linked to a record or a design; neither was
readable without one get per issue.
mesh-catalog #495 gave read on every repository to the tools' account alone. The build modules
fetch over ssh as nox-builder (the forge-account provider's builders account, ADR 0466 §3), so
ace's and g14's fetch of jschoubben/car-hunter and jschoubben/snake still failed; the machines'
agents (nox-agent, ADR 0410 §1) could not read them either.
- gitea: readall.ts grants every account of one list, meshAccounts in tools-account.ts (mesh-tools,
nox-builder, nox-agent; a Go test holds the two Go names to internal/forgeaccount's constants),
on the same start pass, forge events and tools. gitea_unreadable_repos answers per account and
names the accounts the forge does not hold yet; gitea_grant_read takes accounts as well as
repositories. An absent account is asked nothing; the start pass runs again ten minutes apart
until every account was there once.
- mesh-build-go, mesh-build-node, mesh-build-image: pin mesh-sdk ff81bdf8 (fix/fetch-reads-all),
whose forgekey.Said keeps git's words past the bare "error:" line: the mirror's line said only
"git -C: error:". Their own git reasons (ls-files, ls-remote, rev-parse, repack) go through it too.
Every RUN failed before it started: 'setup network: netavark: nftables error ... Could not process rule'. Reproduced on
shanks with buildah 1.45.2, a clean environment and a private XDG_RUNTIME_DIR; --network pasta builds, and reaches the
network from a RUN. The sysrq integration row now fails if the RUN never started.
A held half-merged group did not count as under way, so another group sharing a repository could start; asked
again with delivery_merge_again, each then waited on the other. Passes are now read from every approved,
undeclined Approve not merged whole (approvedMerges leaves out merged and refused members), and
delivery_merge_again is refused while passWaits names a pass, naming it. The forge's mergeable is also false
for a work in progress: said so.
buildah writes STEP lines on stdout and its error on stderr, so the last line of both hid every image build's cause.
mesh-build-image's reason is now stderr's last lines (600 bytes) with the exit status, and the journal gets both tails;
mesh-build-node keeps stderr's end and stdout's start apart; mesh-build-go's cause skips go build's '# package' line.
On 2026-10-26 13:40 group fix/734-lost-ask merged two of its three members: the forge answered mesh-delivery#73's
merge 405 "Please try again later", and in the seconds between, group feat/890-placement merged mesh-delivery#72,
so #73 then conflicted.
- mesh-delivery-gate: before any member is handed, every member is read for its required statuses, its head still
the approved one, and the forge's own mergeable (in conflict, or still being worked out); the forge's "no" is asked
again every 5 s for 2 minutes, then the group is held and said urgent with nothing merged.
- mesh-delivery-gate: an approved merge waits while another approved merge's pass is under way into a repository it
goes into (handed until merged whole, or stopped), whether or not mesh/check gates merges (it waits for a merge,
never for a check: ADR 0551).
- mesh-delivery-gate: tool delivery_merge_again asks a refused or held merge again on the operator's word.
- gitea: the merge asks again after the forge's 405 "Please try again later" (1 s, 2 s, 4 s), and a pull request
carries the forge's mergeable, which gitea_commit_statuses answers.
Change A rebuilds the three build modules, so their runtimes restart once; it
changes nothing else about their builds until change B gives them the share.
Review round 1: a cap per module let three build modules take three shares
of the node. The share is now one node value held by the node-engine's
yielding slice; each step divides it by every build slot of the node, from the
composer's words, or assumes every build seat at its own capacity without them.
The operator's desktop slows while it builds (shanks at 92%, the Go build
runtime at 1650% of 24 processors). The build modules declare cpu-cap
(default shanks=50,g14=50,ace=75), which the composer turns into the runtime's
quota at idle priority; each step's go, node and buildah commands get
GOMAXPROCS and UV_THREADPOOL_SIZE for their part of it, and the status tools
show the limits and what the kernel holds the runtime to.
mesh-build-node's integration tests read the Node toolchain installed only where the node holds node-build-node, and
skipped on ace: its package now declares node-build-node beside its tests; the integration digest names it, a node
lacking it leaves the package unmet for the checker to place, and declines a placed ask. Re-pins mesh-sdk feat/890-placement.
mesh/check failed: ace: the check of novox/mesh-catalog#492 refused: the installed go version could not be read: `go version` with GOTOOLCHAIN=local f…
On ace, which holds no Node build module, five integration tests each spent 70 s in npm's network retries and failed every mesh-catalog check run there (five verdicts since 00:07). The tests now copy the node's installed toolchain or are skipped as NOT RUN; the registry is never reached. Three tests sharing the fixture are one, so the toolchain is copied three times instead of five (10 integration tests in the module, now 8).
Review round 1: offering the work again let a redelivered raise follow its own clearing and
replace it, and a redelivery is bounded where an outage is not. The work is now taken; what
was shown stays in memory, recalled first, and is kept at the start of the next work and at
the minute's standing, stopping at the first write the store does not answer. A desk that
restarts before then loses where those are shown, and its log said how many it held.
On 2026-10-26 09:18 the bus reloading its accounts made the desk's state store answer
'no responders' just as the urgent 'A new build of mesh-controller cannot be delivered'
was shown. The desk logged that it could not keep the notification ids and acked the work;
the router's clearing at 09:34 then found no record, was shown as a new notification, and
the urgent one stayed on the operator's screen for hours.
Now what was shown and not kept is held in memory, recalled before the store by edits,
reminders, clicks and a notifier restart, kept at the next piece of work, and its work is
offered again until the store keeps it, without being shown twice. An edit of a message
nothing records is said in the journal.