Commit Graph
127 Commits
Author SHA1 Message Date
mesh-tools 6b6d5cba71 Merge pull request 'Image builds run their RUN steps on pasta, and every build failure keeps its real error (issue 1703)' (#502) from fix/1703-image-error-shown into main 2026-10-26 14:48:17 +00:00
jschoubben 071c6885d9 The mesh's forge accounts all read every repository, and a build's fetch says the forge's own words
mesh/delivery merged: source.main moved to novox/mesh-catalog@61563abf2f93
mesh/delivery-group group fix/fetch-reads-all merged: every member is merged
mesh/check checking 071c6885d923 on 8393e2962193
mesh-catalog #495 gave read on every repository to the tools' account alone. The build modules
fetch over ssh as nox-builder (the forge-account provider's builders account, ADR 0466 §3), so
ace's and g14's fetch of jschoubben/car-hunter and jschoubben/snake still failed; the machines'
agents (nox-agent, ADR 0410 §1) could not read them either.

- gitea: readall.ts grants every account of one list, meshAccounts in tools-account.ts (mesh-tools,
  nox-builder, nox-agent; a Go test holds the two Go names to internal/forgeaccount's constants),
  on the same start pass, forge events and tools. gitea_unreadable_repos answers per account and
  names the accounts the forge does not hold yet; gitea_grant_read takes accounts as well as
  repositories. An absent account is asked nothing; the start pass runs again ten minutes apart
  until every account was there once.
- mesh-build-go, mesh-build-node, mesh-build-image: pin mesh-sdk ff81bdf8 (fix/fetch-reads-all),
  whose forgekey.Said keeps git's words past the bare "error:" line: the mirror's line said only
  "git -C: error:". Their own git reasons (ls-files, ls-remote, rev-parse, repack) go through it too.
2026-10-26 15:27:38 +01:00
jschoubben 98c66fb1e4 Build modules: a failed command's reason says its error, not its last progress line (issue 1703)
buildah writes STEP lines on stdout and its error on stderr, so the last line of both hid every image build's cause.
mesh-build-image's reason is now stderr's last lines (600 bytes) with the exit status, and the journal gets both tails;
mesh-build-node keeps stderr's end and stdout's start apart; mesh-build-go's cause skips go build's '# package' line.
2026-10-26 15:21:01 +01:00
jschoubben 2aecbe8055 Merge main into fix/build-cpu-yields; pin mesh-sdk at its head (ADR 0553, ADR 0554)
mesh/delivery merged: source.main moved to novox/mesh-catalog@ceb3aac9b39a
mesh/delivery-group group fix/build-cpu-yields merged: every member is merged
mesh/check being carried to 2aecbe80553c on ceb3aac9b39a | from 9a8e54d988fe, mesh-host bba9081ca127
2026-10-26 14:47:27 +01:00
jschoubben 3def293d94 Build modules: no thread limit without the composer's share; with it, the share over their own capacity (ADR 0553 round 2)
Change A rebuilds the three build modules, so their runtimes restart once; it
changes nothing else about their builds until change B gives them the share.
2026-10-26 14:41:12 +01:00
jschoubben ecbee53cfd Merge main into fix/build-cpu-yields; pin mesh-sdk at its head (ADR 0553) 2026-10-26 14:23:33 +01:00
jschoubben dcdf4238c7 Build modules: no cap of their own; a step's threads are its part of the node's one share (ADR 0553, issue 1806)
Review round 1: a cap per module let three build modules take three shares
of the node. The share is now one node value held by the node-engine's
yielding slice; each step divides it by every build slot of the node, from the
composer's words, or assumes every build seat at its own capacity without them.
2026-10-26 14:22:05 +01:00
jschoubben d3423f54ed mesh-build-go: resolve the go.mod and go.sum the main merge left in conflict; pin mesh-sdk 33395f68 (issue 890)
mesh/delivery merged: source.main moved to novox/mesh-catalog@9a8e54d988fe
mesh/delivery-group group feat/890-placement merged: every member is merged
mesh/check checking d3423f54ed58 on 9a8e54d988fe | novox/mesh-catalog#498 in group feat/890-placement
2026-10-26 14:06:37 +01:00
jschoubben 0e322d087f mesh-build-go: pin mesh-sdk 33395f68, feat/890-placement merged with main (issue 890) 2026-10-26 14:05:38 +01:00
jschoubben d21b81b00a mesh-build-go: node-build-node also needs bubblewrap and a toolchain installed whole (its mark and lock), as mesh-build-node's integration tests do; pins mesh-sdk 45564e69 (issue 890, review round 1) 2026-10-26 14:02:27 +01:00
jschoubben 0134697f97 Build modules: the round ends asks past the step bound; pin the sdk head (issue 1890)
mesh/delivery merged: source.main moved to novox/mesh-catalog@b1e610b2135a
mesh/delivery-group group fix/1890-left-running-steps merged: every member is merged
mesh/check pass 0134697f9739 on b1e610b2135a | carried from a4f5df797b68, mesh-sdk b4cd95e7c4a4 | unit 3132 run, 3022 kept, 7 skipped | integration 31…
2026-10-26 13:52:53 +01:00
jschoubben 21583d14ad Pin mesh-sdk at fix/build-cpu-yields' head (issue 1806) 2026-10-26 13:49:54 +01:00
jschoubben ac2c56f2a9 Build modules: steps end by compare-and-set; pin the sdk head with the review's fixes (issue 1890) 2026-10-26 13:44:00 +01:00
jschoubben 64b9ded2db Build modules: a per-node processor cap, and each step's threads within it (issue 1806)
The operator's desktop slows while it builds (shanks at 92%, the Go build
runtime at 1650% of 24 processors). The build modules declare cpu-cap
(default shanks=50,g14=50,ace=75), which the composer turns into the runtime's
quota at idle priority; each step's go, node and buildah commands get
GOMAXPROCS and UV_THREADPOOL_SIZE for their part of it, and the status tools
show the limits and what the kernel holds the runtime to.
2026-10-26 13:41:05 +01:00
jschoubben 67d6a5a7c1 mesh-build-go: report the needs a package's check-needs marker names, test it only where the node has them, decline an ask needing what the node lacks (issue 890)
mesh-build-node's integration tests read the Node toolchain installed only where the node holds node-build-node, and
skipped on ace: its package now declares node-build-node beside its tests; the integration digest names it, a node
lacking it leaves the package unmet for the checker to place, and declines a placed ask. Re-pins mesh-sdk feat/890-placement.
2026-10-26 13:37:52 +01:00
jschoubben 5fe5f26e7e Build modules: a restart ends the steps it left running, a step shows what it is, build_*_step_end ends one (issue 1890) 2026-10-26 13:27:46 +01:00
jschoubben ea53b2f920 mesh-build-go: each package counts its skipped tests (issue 890)
mesh/delivery merged: source.main moved to novox/mesh-catalog@71e094b2de59
mesh/delivery-group group fix/checker-skips-not-kept merged: every member is merged
mesh/check failed: ace: the check of novox/mesh-catalog#492 refused: the installed go version could not be read: `go version` with GOTOOLCHAIN=local f…
2026-10-26 12:29:19 +01:00
jschoubben 15a5fe09b6 mesh-build-go, mesh-build-node: run every package of a check's level after a failure (issue 1921)
mesh/delivery merged: source.main moved to novox/mesh-catalog@c51a46b802d3
mesh/delivery-group group fix/1921-every-failure-r merged: every member is merged
mesh/check checking 15a5fe09b62e on c51a46b802d3 | novox/mesh-catalog#488 in group fix/1921-every-failure-r
Pins mesh-sdk fix/1921-every-failure-r, whose check ask no longer stops a level at its first failing test step. A captured fixture with a failing test in each of two packages proves the build module's test step names both.
2026-10-26 10:58:07 +01:00
jschoubben e901769cb2 Read the newest steps first: sort the node's keys by id (start order) before the cut, and say older steps were not read
mesh/delivery merged: source.main moved to novox/mesh-catalog@567736f7795a
mesh/check failed: integration: meshbuildnode/cmd/mesh-build-node.TestAFixtureBundleBuiltTwiceHasOneDigest: no toolchain of this lock is installed und…
The review found a cut read took an arbitrary 1000 keys, so the newest steps could be missing. A step id is
base-36 milliseconds plus random digits, so its string order is its start order; the newest max(limit*4, 100)
keys are read now, 1000 at most. The toolchains read logs when it drops keys past its cap.
2026-10-26 00:43:53 +01:00
jschoubben 8f9c78bcba Read only the node's own steps, in parallel and bounded, so build_*_steps answers within the call's 30 s (issue 1827)
On a steps state of 1164 keys / 20 MB (mesh-build-node: 10034 keys) the read tools listed every key and
then read each value one round trip at a time, filtering by node only after the Get, so they timed out
at 30 s. Now the keys are filtered by the node's prefix before any Get, the values are read 16 at a
time, at most 1000 a call (the answer says it was cut), and one log line gives rows read and time.
build_*_toolchains reads its values the same parallel way. The kind: a read tool that reads a whole
state key by key; every read tool of the three modules is covered.
2026-10-26 00:39:33 +01:00
jschoubben 4e82a824be Announce the pauses state in the three build modules, and pin mesh-sdk 518dae5 (an unreadable pause pulls as not paused)
mesh/delivery-group group fix/steps-bucket-ages held: a member is held: novox/mesh-sdk@518dae5ec9c8 (merged without a passing check: only a person decides what…
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/check pass 4e82a824be7a on cdbe2945cf6e | unit 1994 run, 2322 kept, 5 skipped | integration 2016 run, 2341 kept, 9 skipped | over bound: unit, in…
Without it in Kept, stdio.KeptState refuses the state before the bus (mesh-sdk go/keeps.go
refusedUnannounced), so the pause could be neither read nor written.
2026-10-25 18:57:08 +01:00
jschoubben 78d26867d2 Give the build modules' steps state an age of two days, and keep a node's pause in a pauses state of its own
mesh-build-go's steps bucket filled to the bus's 64 MiB cap (27,370 keys, none ever removed) and
refused the end of a passed check, so the check read failed; mesh-build-node's (17.8 MB) and
mesh-build-image's grow the same way. A step's key is per step: its reader reads its end within
the step's bound, and a check's verdict is kept by the checker, so two days is ample. The node's
pause key lived in the same bucket and would have ended by itself; it moves to a pauses state
without an age (mesh-sdk fix/steps-bucket-ages, Puller.PausePut). No node is paused today, so
nothing is carried over.
2026-10-25 18:53:04 +01:00
jschoubben 23c827e791 Take the mesh-sdk head that wakes a puller on its capacity, within the test budget, in the three build modules (issue 1887)
mesh/delivery merged: source.main moved to novox/mesh-catalog@2df0503034dc
mesh/delivery-group group fix/puller-wakes-on-capacity merged: every member is merged
mesh/check pass 23c827e7910c on a85d90374195 | judged by the candidate's mesh-build-go at eab02c80fe86
2026-10-25 17:44:50 +01:00
jschoubben 3138570c6b Let the build modules follow their capacity on the bus, so a node raised from capacity 0 starts pulling (issue 1887)
g14's Go builder sat idle at capacity 2 because nothing woke its parked
puller. mesh-build-go, mesh-build-node and mesh-build-image now pin mesh-sdk
b9911dc1, whose puller watches the config value capacity as mesh-config
resolved it and wakes on each change, and hand it that watch.
2026-10-25 17:28:00 +01:00
jschoubben 155124b59a mesh-build-go: a cause is the runtime's line at column 0, and only go's exact summary lines are dropped (issue 1901, review round 1)
mesh/delivery held for a person: merged without a passing check: only a person decides what follows
mesh/delivery-group group fix/1901-package-cause held: a member is held: novox/mesh-catalog@155124b59af4 (merged without a passing check: only a person decides…
mesh/check pass 155124b59af4 on f27f4c8cd58c | unit 2015 run, 2883 kept, 5 skipped | integration 2037 run, 2978 kept, 9 skipped | over bound: unit, in…
An indented log line of another running test that held 'panic:' won over the
real timeout panic, since the lines were trimmed before matching. Go prints
the runtime's lines at column 0; a test's log is indented.
2026-10-25 15:58:07 +01:00
jschoubben 6ec6fdaad2 mesh-build-go: a race the race detector reports is a failure's cause, in a test or after PASS (issue 1901)
mesh-controller's try was worded 'PASS' again because the race detector
reported after the tests passed and the program exited 66. The cause is now
the race: its access, the frame that made it and where its goroutine was
created, instead of PASS or testing's generic 'race detected during execution
of test'. Tests from captured go test -race -json (1901/AC4).
2026-10-25 15:52:20 +01:00
jschoubben 663f3de975 mesh-build-go: a package that fails without an assertion carries its real cause, never "PASS" (issue 1901)
A try of mesh-controller kept 'PASS' as its only failure: the package's test
program stopped after printing PASS and the package-level failure took its
first line. Now a failure that is not one test's assertion names the tests that
were running and carries the panic line (a timeout's with its running tests),
a signal or fatal error line, a build's first error, or words saying the
program exited during which tests or after they passed; go test's summary lines
are never kept. Tests from captured go test -json of eight real failures
(1901/AC4).
2026-10-25 15:38:28 +01:00
jschoubben 2fabbe556e Pin to the group's new mesh-sdk head bfc3883a, whose composer reads a fallback to a predefined key as the indexer does (ADR 0348 §7)
mesh/delivery delivered
mesh/delivery-group group feat/r4g-finish merged: every member is merged
mesh/check checking 2fabbe556e73 on 6fb0ceeef817 | novox/mesh-catalog#473 in group feat/r4g-finish
2026-10-24 14:57:35 +02:00
jschoubben 89b9212c4d Pin to the group's new mesh-sdk head 19c1d359, whose composer names the reader's pinned SDK instead of a bare (devel) (ADR 0482 clause 5)
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: shanks: novox/mesh-catalog#473: modules/mesh-build-go/go.mod names mesh-sdk 19c1d35939bc, which is neither on mesh-sdk's trunk nor …
2026-10-24 14:12:09 +02:00
jschoubben f910b0ceb8 Pin mesh-build-go to the group's mesh-sdk head after main's merge, so it builds on the SDK the group delivers 2026-10-24 13:28:16 +02:00
jschoubben e870a7f65f Pin to the finish group's mesh-sdk head dd0d156b, so every member names one SDK (issue 1622) 2026-10-24 04:28:14 +02:00
jschoubben e8a59171c7 Merge remote-tracking branch 'origin/feat/r4g-finish-composer' into HEAD 2026-10-24 04:26:03 +02:00
jschoubben 6a70735489 Run a compose ask on the Go build seat: build mesh-sdk's composer at the asked commit once, fill its manifests from the indexer and run it shut off (issue 1622) 2026-10-24 04:14:21 +02:00
jschoubben a715c8821f mesh-build-go: a catalogue module's non-Go files enter its packages' digests; markers where tests read other modules (issue 1935) 2026-10-24 03:59:08 +02:00
jschoubben b6ed8599c8 mesh-build-go: a package marked reads-outside is never kept, so tests that read files outside their directory run on every check (issue 1935) 2026-10-24 03:46:45 +02:00
jschoubben 7e1f3de77a mesh-build-go: lint directories side by side like the tests, so a large repository's check stays inside its bound (issue 1930)
mesh/delivery delivered
mesh/check failed: mesh-build-go: the check of novox/mesh-catalog#470: the ask mvlnph6fd84a7b's step on shanks did not end within 30m0s of its start |…
2026-10-24 02:01:36 +02:00
jschoubben 25d69406b7 Merge pull request 'mesh-build-go: a failed test keeps its last lines and its cause, not its first fifteen (issue 1901, with mesh-delivery)' (#466) from fix/1901-rebased into main
Reviewed-on: #466
2026-10-23 22:35:57 +00:00
jschoubben 30b22c198e Pin the build modules to mesh-sdk 403a5d7, whose level digest is a list, so a check of a repository with a package named token ends (issue 1930)
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1792875397682979170 (novox/mesh-catalog at 6fb0ceee into main,…
mesh/delivery-group group fix/1930-digest-shape merged: every member is merged
mesh/check checking 30b22c198e6a on 450f0bbe7984 | novox/mesh-catalog#467 in group fix/1930-digest-shape
2026-10-23 23:36:31 +02:00
jschoubben dcae699323 mesh-build-go: a clipped failure starts with its cause, not the marker, for an older checker (issue 1901/AC3)
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-catalog@753e8fc202c3 (merged as 4b1bed4b into main, walk plan-17927949853…
mesh/delivery-group group fix/1901-rebased merged: every member is merged
mesh/check checking dcae699323c8 on 25d69406b740 | novox/mesh-catalog#466 in group fix/1901-rebased
2026-10-23 22:26:29 +02:00
jschoubben 70ef99595a mesh-build-go: build_go_test takes packages as a typed list too (issue 1925)
mesh/delivery delivered
mesh/check failed: shanks: the check of novox/mesh-catalog#465 failed: the unit level: packages is a list of package patterns | 70ef99595aa9 on e52024…
2026-10-23 22:21:41 +02:00
jschoubben 746eb885a3 Test 1901/AC3: an older pair of build module and checker still agree (issue 1901) 2026-10-23 22:14:28 +02:00
jschoubben 2cdb9b8fc4 mesh-build-go: a failed test keeps its last lines and its error line, not its first fifteen (issue 1901) 2026-10-23 22:13:41 +02:00
jschoubben c32474ee40 Judge the delivery-before-check order from the step records, not a poll: at capacity 1 the check starts the instant the delivery ends (R4g, issue 1887)
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: integration: mesh-delivery-gate/cmd/mesh-d… | c32474ee40f4 on 3bec357968da | judged by the candidate's mesh-build-go at 2e667ac15ce7
2026-10-23 19:19:45 +02:00
jschoubben f95f3f430e Give the delivery-ask integration test a bus of its own: the level shares one bus across directories, so a named stream there could be taken by another test (R4g, issue 1887) 2026-10-23 19:15:52 +02:00
jschoubben d6b9cef9d0 Prove a check ask's digest is the digest tool's answer in the call, so the checker keys kept verdicts by it (issue 1917)
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: unit: git.novox.be/novox/mesh-catalog/chec… | d6b9cef9d005 on 3bec357968da | judged by the candidate's mesh-build-go at 769f9d906be2
2026-10-23 17:19:38 +02:00
jschoubben b60077850d Pin mesh-sdk at feat/r4g's head a2c813a6, its test fixture fix, with go.sum tidied
mesh/delivery superseded: a newer head of the same pull request
mesh/check failed: unit: git.novox.be/novox/mesh-catalog/chec… | b60077850dfb on 3bec357968da | judged by the candidate's mesh-build-go at 47bcc1b5810e
2026-10-23 17:06:11 +02:00
jschoubben f08abb90d4 Pin the build modules to the mesh-sdk head whose puller says a poisoned ask and bounds a step from its start (issues 1907, 1887 review round 2) 2026-10-23 16:52:19 +02:00
jschoubben a493c90c0d Require node-tools in the three build modules, so the delivery plan puts the tool runner they pull asks through before them on every node (issue 1911) 2026-10-23 16:50:03 +02:00
jschoubben 14b7158fc0 Run gofmt and go vet before the Go unit level's tests and give their time in its result, so a lint failure ends the level at once and the check's line can say what it cost (issue 1887 D7-go, review round 2 item 5; ADR 0529 §1) 2026-10-23 16:44:22 +02:00
jschoubben d0a3a8ebc6 Record the checksums of mesh-sdk feat/r4g 9205222a for the group's modules (R4g) 2026-10-23 16:26:11 +02:00