With the gate on the first machine and the rollback after it (hq ADR 0236), a module's build rolls out by default. The modules kept at record say why in their manifest (upgrade: {policy: record, why}):
nats — the bus, a planned step (the controller holds it whatever this says)
dnsmasq, nftables, networkmanager, systemd-networkd — a build that cuts a machine off from the bus cannot be put back from outside
sshd — the way in when the mesh cannot reach a machine, which no gate sees
postgres, mssql, mongodb, minio, keycloak — every consumer on the machine drops with them; mongodb and minio hold the photos
(plex and photos record by their irreplaceable data, with nothing to say here.)
The gitea announcer now says which of a merge's files were deleted (removed), so a module whose manifest went is forgotten rather than asked to build — the public-acme plan failure of 2026-10-06. Its test covers it.
Merge after mesh-controller's PR is rolled out: upgrade is a manifest field the builder older than it refuses. All 112 manifests pass module check with the new controller. Merges cleanly with feat/bus-snapshot.
With the gate on the first machine and the rollback after it (hq ADR 0236), a module's build rolls out by default. The modules kept at `record` say why in their manifest (`upgrade: {policy: record, why}`):
- nats — the bus, a planned step (the controller holds it whatever this says)
- dnsmasq, nftables, networkmanager, systemd-networkd — a build that cuts a machine off from the bus cannot be put back from outside
- sshd — the way in when the mesh cannot reach a machine, which no gate sees
- postgres, mssql, mongodb, minio, keycloak — every consumer on the machine drops with them; mongodb and minio hold the photos
(plex and photos record by their irreplaceable data, with nothing to say here.)
The gitea announcer now says which of a merge's files were deleted (`removed`), so a module whose manifest went is forgotten rather than asked to build — the public-acme plan failure of 2026-10-06. Its test covers it.
**Merge after mesh-controller's PR is rolled out**: `upgrade` is a manifest field the builder older than it refuses. All 112 manifests pass `module check` with the new controller. Merges cleanly with `feat/bus-snapshot`.
With a gate on the first machine and a rollback after it, a module's build rolls out by
default. The ones kept back say why: the network path a rollback could not cross, the
providers every consumer on a machine drops with, and the stores holding the photos.
A merge's deleted files are announced, so a module whose manifest went is forgotten
rather than asked to build (the public-acme plan failure).
Deliverynovox/mesh-catalog@6e4d12e5a495 — delivered since 2026-10-06T23:05:28Z
Machines
gitea on novox: passed — healthy 3 times over 2m42s
gitea on the rest running it: sent
Transitions
2026-10-06 23:05 (new) → proposed (announced): novox/mesh-catalog#95 merged; its head was not heard by this owner, so it is made from the forge's word
2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
2026-10-06 23:05 held → delivering (go): its walk started on a word that was not this owner's: the controller's own path, which waits for nobody, or a person's plans go
2026-10-06 23:05 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-catalog@6e4d12e5a495` — **delivered** since 2026-10-06T23:05:28Z
**Machines**
- gitea on novox: passed — healthy 3 times over 2m42s
- gitea on the rest running it: sent
**Transitions**
- 2026-10-06 23:05 (new) → proposed (announced): novox/mesh-catalog#95 merged; its head was not heard by this owner, so it is made from the forge's word
- 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
- 2026-10-06 23:05 held → delivering (go): its walk started on a word that was not this owner's: the controller's own path, which waits for nobody, or a person's `plans go`
- 2026-10-06 23:05 delivering → delivered (done): its walk is done: every machine of its deploy plan passed, or was left as its policy says
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
With the gate on the first machine and the rollback after it (hq ADR 0236), a module's build rolls out by default. The modules kept at
recordsay why in their manifest (upgrade: {policy: record, why}):(plex and photos record by their irreplaceable data, with nothing to say here.)
The gitea announcer now says which of a merge's files were deleted (
removed), so a module whose manifest went is forgotten rather than asked to build — the public-acme plan failure of 2026-10-06. Its test covers it.Merge after mesh-controller's PR is rolled out:
upgradeis a manifest field the builder older than it refuses. All 112 manifests passmodule checkwith the new controller. Merges cleanly withfeat/bus-snapshot.Delivery
novox/mesh-catalog@6e4d12e5a495— delivered since 2026-10-06T23:05:28ZMachines
Transitions
plans goThe commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.