PROBE ONLY, never merged: placement files to read each node's shadow answer with both bodies (issue 1126) #534

Closed
mesh-tools wants to merge 1 commits from probe/1126-seed-6 into main
Member

This is a probe, not a change. It is opened only so that each node answers the placement candidate in its shadow, which now carries both bodies masked (the fix/1126-shadow-bodies group, delivered 2026-10-28 07:5x Z). It is closed unmerged once the answers are read.

On purpose there is no review line, so the gate holds its Approve ask (ADR 0496), and no Approve is asked of the operator.

This is a probe, not a change. It is opened only so that each node answers the placement candidate in its shadow, which now carries both bodies masked (the fix/1126-shadow-bodies group, delivered 2026-10-28 07:5x Z). It is closed unmerged once the answers are read. On purpose there is no review line, so the gate holds its Approve ask (ADR 0496), and no Approve is asked of the operator.
mesh-tools added 1 commit 2026-10-28 07:56:19 +00:00
Probe: the placement files, opened only to read each node's shadow answer with both bodies (issue 1126); not to be merged
mesh/delivery closed: the pull request closed unmerged
mesh/check checking c2606f99178a on 2a03c106f4b9
c2606f9917
Author
Member

Delivery novox/mesh-catalog@c2606f99178a — closed since 2026-10-28T08:20:20Z

Transitions

  • 2026-10-28 07:56 (new) → proposed (announced): novox/mesh-catalog#534's head announced
  • 2026-10-28 07:56 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-28 08:20 ready → closed (closed): the pull request closed unmerged

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-catalog@c2606f99178a` — **closed** since 2026-10-28T08:20:20Z **Transitions** - 2026-10-28 07:56 (new) → proposed (announced): novox/mesh-catalog#534's head announced - 2026-10-28 07:56 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-28 08:20 ready → closed (closed): the pull request closed unmerged The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools closed this pull request 2026-10-28 08:20:19 +00:00

Pull request closed

Please reopen this pull request to perform a merge.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-catalog#534