Probe: placement seed-9 (issue 1126) — not to be merged #544

Closed
mesh-tools wants to merge 1 commits from probe/1126-seed-9 into main
Member

This is a probe for issue 1126 (placement candidates answered in shadow by every node). It changes only the four placement files, taken from probe/1126-seed-8 on today's main, to read each node's shadow answer after the seed-8 composition fixes (mesh-host src2:c8db6aec).

It is not to be merged and will be closed by probe-seed-9@shanks once all four nodes have answered, or after 30 minutes.

This is a probe for issue 1126 (placement candidates answered in shadow by every node). It changes only the four placement files, taken from probe/1126-seed-8 on today's main, to read each node's shadow answer after the seed-8 composition fixes (mesh-host src2:c8db6aec). It is not to be merged and will be closed by probe-seed-9@shanks once all four nodes have answered, or after 30 minutes.
mesh-tools added 1 commit 2026-10-28 13:31:53 +00:00
Probe: the placement files for seed-9 (issue 1126); not to be merged
mesh/delivery closed: the pull request closed unmerged
mesh/check checking 4919a4e07654 on 69056948bfa8
4919a4e076
Author
Member

Delivery novox/mesh-catalog@4919a4e07654 — closed since 2026-10-28T13:36:20Z

Transitions

  • 2026-10-28 13:31 (new) → proposed (announced): novox/mesh-catalog#544's head announced
  • 2026-10-28 13:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-28 13:36 ready → closed (closed): the pull request closed unmerged

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-catalog@4919a4e07654` — **closed** since 2026-10-28T13:36:20Z **Transitions** - 2026-10-28 13:31 (new) → proposed (announced): novox/mesh-catalog#544's head announced - 2026-10-28 13:31 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-28 13:36 ready → closed (closed): the pull request closed unmerged The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools closed this pull request 2026-10-28 13:36:20 +00:00

Pull request closed

Please reopen this pull request to perform a merge.
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-catalog#544