power: its loop and boot tests run on a fake clock, so a busy build node cannot fail them (issue 1126) #551

Merged
mesh-tools merged 1 commits from fix/power-loop-flake into main 2026-10-28 16:26:06 +00:00
1 Commits
Author SHA1 Message Date
jschoubben 3494548c88 power: the loop and run tests drive their own clock, so a loaded build node cannot starve their timing (flake in #549's check)
mesh/delivery merged: source.main moved to novox/mesh-catalog@d836a31aa721
mesh/check checking 3494548c8830 on d836a31aa721
2026-10-28 17:12:11 +01:00